Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade

    "Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even

    Mar 8, 2016

  • AUSIMM
    Enhancement of the Becher Process by Ball Milling

    Ilmenite (FeTiO3) is the primary global source of titaniumdioxide which is commonly used as a whitening agent in papermanufacture and a pigment in paint manufacture. In WesternAustralia ilmenite is pr

    Jan 1, 1997

  • AUSIMM
    The Path to Successful Roof Support Automation

    The first hydraulic roof supports were installed underground in 1950s and ever since that time engineering developments have improved the supports in many different ways. However. advances in three ma

    Jan 1, 1991

  • AUSIMM
    Engineering and Science in Flotation Cell Design

    By J Euston

    In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi

    Aug 8, 2011

  • AUSIMM
    Modelling Blast Movement for Grade Control at an Open Cut Gold Mine

    By E J. Sellers, A Cocker

    Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref

    Aug 18, 2014

  • AUSIMM
    Comparison of Experiment and Simulation of Blast Loading on the Steel Beam

    By A Hosseinzadeh Barforoosh, A Abedi, M Taji

    The effect of blast loads on beams is one of the main issues in the analysis of steel structure. In this study, experimental tests on steel beam under blast loading, and also numerical simulation by t

    Aug 24, 2015

  • AUSIMM
    Predicting the Efficiency of Chemical Processes for Low-Grade Concentrates and Ores

    By Prosser AP

    The large body of knowledge about the relation between chemical process efficiency and mineralogical features is of only limited use. The profession ought to try to improve the methods of using inf

    Jan 1, 1975

  • AUSIMM
    How progressive waste rejection should transform your mining business

    By M Pyle, R Ch, T Vizcarra, ramohan, G Lane, G Ballantyne

    Preconcentration, through gravity separation (Wallace et al, 2015), magnetic separation and particle size (Clout, 2013), has been used in many historical projects to convert low grade material into or

    Nov 10, 2020

  • AUSIMM
    Using a Sustainability Assessment Framework to Achieve Enhanced Legacy Outcomes

    By S R. Green, G D. Corder

    The legacy issues from mining can, and have often, extended well beyond the closure of operations. However, conventional cost-benefit analysis provides little incentive to implement initiatives at the

    Jul 10, 2012

  • AUSIMM
    Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to Closure

    By J McCluskey, N Barros

    "Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c

    Nov 24, 2014

  • AUSIMM
    Alluvial Gold in Eastern Southland: Origin of the Gold and Genetic Relationships Between Placer Deposits

    By D Craw

    Middle and Late Cenozoic fluvial conglomerates and gravel in northeastern Southland record the transport of alluvial gold from Central Otago into Southland, and subsequent reworking and concentration

    Jan 1, 2002

  • AUSIMM
    A case study: how being ‘aware of now’ is making work safer at Telfer underground

    By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle

    Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper

    Mar 15, 2021

  • AUSIMM
    Measurement? Assessment? The Real Challenge is Communication

    One of the earliest and continuing challenges in driving sustainable development in large scale resource industry projects is around the issue of assessment û how do you measure the sustainability of

    Jan 1, 2009

  • AUSIMM
    Multiple Land Use

    During the middle of this century, exploration and mining reached a low ebb in New Zealand. Tas McKee did his utmost to rejuvenate the mining industry, using the latest technology and an understanding

    Jan 1, 1987

  • AUSIMM
    Innovation in an Uncertain World

    As Pliny commented two millennia ago, The only certainty is that nothing is certain. Despite the many breakthroughs, advances and promises, the way we each live and work remains awash with technologic

    May 1, 2010

  • AUSIMM
    Creating a Future for Australian Light Metals Through Vertical Integration

    AustraliaÆs strong position as an aluminium producer and potential magnesium producer combined with rapid market growth in the automotive industry, proximity to Asia and other natural advantages point

    Jan 1, 2000

  • AUSIMM
    Incorporating economic variability into a strategic planning framework

    By E Holloway

    The optimisation of an open pit mine can be broadly split into two stages, the first being the ultimate pit optimisation (and subsequent stage designs), and the second being schedule optimisation. Mac

    Nov 21, 2018

  • AUSIMM
    Non-Destructive Testing of In Situ Underground Mine Seals - Initial Technology Assessment

    By C Harwood, EáWestman, K Luxbacher

    Testing of in situ seals in underground coal mines is critical to determine seal integrity and to provide safe working conditions. In the wake of the 2006 Sago Mine explosion, the United States of Ame

    Jul 1, 2013

  • AUSIMM
    Modelling Open Pit and Underground Production Scheduling in Concert

    By B King

    A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti

    Nov 24, 2014

  • AUSIMM
    A waste fines cell with a multitude of concurrent activities

    By J J. Boshoff

    This iron ore mine site, located in the Pilbara region of Western Australia, commenced operations in 1998, with ore derived by mining of open-cut pits in Channel Iron Deposits (CIDs). A portion of the

    Jul 23, 2018