Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    The Australian Equity Market as a Source of Capital for Pacific Basin Mineral Development

    One of the major changes in the resource industry in the nineties has been the re- internationalisation of the industry. The history of the resource business has been one of companies from the develop

    Jan 1, 1995

  • AUSIMM
    The Use of Comminution Testwork Results in SAG Mill Design

    The relationship between comminution testwork results and the milling circuit that is subsequently selected is not a direct one and frequently involves recourse to databases of past test results. This

    Jan 1, 2002

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • AUSIMM
    Coal in the Context of Sustainable Development ù Implications for the Minerals Industry

    The concept of æsustainabilityÆ can largely be defined as development that will not compromise the ælivabilityÆ of the planet for future generations. It has multiple dimensions, such as the triple bot

    Jan 1, 2004

  • AUSIMM
    Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operations

    By H Rossiter, A Maddever, J Market, P Jeanneau, A Virani

    It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai

    Nov 10, 2020

  • AUSIMM
    The Impact of Facility Construction and Scale on the Characteristics of Experimental Coal Dust Explosions

    By G Collecutt, T O’Beirne, D Humphreys, J Greenwood

    Much of our knowledge of the behaviour of underground coal dust explosions has been derived from less than full-scale experimental explosions in facilities as small as 0.25 m diameter pipes. Although

    Aug 31, 2015

  • AUSIMM
    Are we there yet? Where the minerals industry is at, and where we are going with gender diversity, equity and inclusion

    By L H. G McClean

    Diversity, equity and inclusion are often cited as ‘important priorities’ by mining companies and industry organisations in their public presentations and reports, but is the minerals industry really

    Sep 1, 2024

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Adsorption of Starch on Kaolinite Surfaces

    Adsorption of Starch on Kaolinite Surfaces

    Sep 13, 2010

  • AUSIMM
    Need to Improve Burden Distribution in Bell-less Charged Blast Furnaces

    By I M. Howard

    With the bell-less top (BLT) charging system replacing the centuries old double bell charging method, the furnace efficiency has been greatly improved together with considerable reduction in the furna

    Jan 1, 1999

  • AUSIMM
    Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower Projects

    By A G. Noble

    Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of

    Mar 8, 2011

  • AUSIMM
    Performance of fully mechanised rock reinforcement using self-drilling anchors with pumpable resin technology

    By P Jere

    Mechanically coupled rock bolts encapsulated in cementitious or polyester cartridge resin grouts have been widely adopted for various underground rock reinforcement applications. Resin grouts are cons

    Mar 29, 2023

  • AUSIMM
    Criteria for the Design of Emergency Refuge Stations for an Underground Metal Mine

    By G P. Bates

    The rationale for the design of the Emergency Egress (escape andentrapment) strategy for one underground metal mine has beenpreviously described (Brake, 1999). Two of the key conclusionsfor this mine,

    Jan 1, 1999

  • AUSIMM
    Adaptation of Hydraulic Shovels for Arctic Temperature of Yakutia Region

    Hydraulic mining shovels can be successively used at open-pit mining operation in severe climatic zone with air temperature interval from -700C to +450C typical for some northern region of the world p

    Dec 6, 2010

  • AUSIMM
    Autonomous Haulage Systems in Underground Mining – What is Required for Success?

    By A G. L Pratt

    The record for autonomous haulage systems in underground mining over the past 15 years is patchy, marked by many trials and attempts, with few examples of sustained operation until relatively recently

    Jun 22, 2016

  • AUSIMM
    Functional safety impacts on study stages of major projects

    By M C. Goode

    The use of electrical or electronic safety systems to protect personnel, and the engineering tasks associated with the design, manufacture and maintenance of these systems are referred to using the te

    Jul 24, 2017

  • AUSIMM
    Study on Beneficiation Technology of a Refractory Fluorite Ore in North China

    Study on Beneficiation Technology of a Refractory Fluorite Ore in North China

    Sep 13, 2010

  • AUSIMM
    Mineral Processing Education in China

    Mineral Processing Education in China

    Sep 13, 2010

  • AUSIMM
    The Methodology Behind the Development of the Vera/Nancy Mine

    Within ten months of the first significant intersection on the Vera deposit, approval was given to proceed with a $28.3 M underground development of the Vera-Nancy gold mine. Contrary to what the time

    Jan 1, 1998