Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Nyrstar Port Pirie Redevelopment

    By B Kretschmer, G Bartel, B de Villiers, W Watt

    "The Nyrstar Port Pirie Smelter, located on the eastern shore of the Upper Spencer Gulf in South Australia 230km north of Adelaide, began operation in 1889 to process lead concentrate from the Broken

    Sep 7, 2015

  • AUSIMM
    Golden Cross Mine - Mining and Processing Operations - Waihi, New Zealand

    The Golden Cross mine is a Joint Venture between Coeur Gold New Zealand Limited, as Manager, and Viking Mining Limited. The mine is targeting Zero Lost Time Accidents as a goal.   The Golden Cros

    Jan 1, 1995

  • AUSIMM
    Structural Controls on Gold Deposition in the Hyde-Macraes Shear Zone at Round Hill, Otago, New Zealand

    The Hyde-Macraes Shear Zone (HMSZ) is low angle, duplex thrust system that has developed in a graphitic pelite schist within the Otago schist belt,

    Jan 1, 1993

  • AUSIMM
    Mineralogy and reducibility of sinter analogues in the Fe3O4-CaO-SiO2 (FCS) ternary system under hydrogen atmosphere

    By M I. Pownceby, M A. Rhamdhani, W J. Rankin, G Brooks, I R. Ignacio

    Steelmaking has a significant contribution in producing greenhouse gases and there is a worldwide push towards decarbonising the process. One of the approaches to reduce CO2 emissions is to use hydrog

    Sep 18, 2023

  • AUSIMM
    Achieving Acceptable Dredge Availability at Grey River Gold Mining Limited

    The achievement of high availability of the Grey River Gold Mining Limited's alluvial gold dredge is a tortuous task which will rely upon the dedication of all staff employed at Grey River Gold M

    Jan 1, 1989

  • AUSIMM
    Super Caves – Benefits, Considerations and Risks

    By I Ross, C deWolfe

    Block caving has been the favoured mining method for large underground hard rock mines for the last few decades. The orebody must be of a size large enough to cave and generally amenable to a caving m

    May 9, 2016

  • AUSIMM
    Correlations among CO2, Cl, 3He and Heat Discharged from Geothermal Systems of the Taupo Volcanic Zone, New Zealand

    Based on relative CO2, N2, and 3He contents, geothermal systems of the Taupo Volcanic Zone, TVZ, can be subdivided into two major groups: arc-type systems, associated with andesitic magmatism along th

    Jan 1, 1995

  • AUSIMM
    The Golden Cross Mine Underground Development Experience and Practice

    The Golden Cross Mine will be the first underground gold mine in New Zealand to operate since 1952. The development plans, along with the conditions and circumstances presently found in the now ongoin

    Jan 1, 1991

  • AUSIMM
    Size Patterns of Gold-Silver Deposits in the Hauraki Goldfield, Coromandel Peninsula

    This paper presents an analysis of the production data for the period 1861 - 1953 from hydrothermal gold-silver deposits of the Hauraki Goldfield. To directly compare the metal content of the deposits

    Jan 1, 1981

  • AUSIMM
    Nui Phao mine – flotation circuit upgrade

    By S Morgan, A Jakowetz, S Taylor, B Weekes, S Litson, P Bourke, T L. Do

    In the current tough mining environment with lower commodity prices, operators need to improve operational profitability. Optimised equipment asset management is a sustainable way to achieve this obje

    Sep 11, 2017

  • AUSIMM
    Use of variography to measure improvement of sampling practices for the quality control of graphite consistency in marble used for carbon-sensitive applications

    By C Haughy, F F. Pitard

    Blue Mountain Minerals is a large supplier of calcium carbonate products used by various manufacturers as a major raw material. Very small amounts of free carbon in the rock can have a huge impact in

    May 9, 2017

  • AUSIMM
    Gold Mining in the Shotover and Kawarau Rivers

    Gold was first discovered in the Shotover by Thomas Arthur in 1862. He left his job as a shearer and soon there were up to 3000 miners working over the length of the river. Some parts were extremely r

    Jan 1, 1987

  • AUSIMM
    A Model Study of the BHP New Zealand Steel Ironmaking Melter

    By C Garlick, O Gregory, H Rogers, B I. Winters, Z C. Ye

    BHP New Zealand Steel produces iron from titaniferous ironsand by a direct reduction process comprising multihearth furnaces/rotary kilns/electric iron melters. The electric iron melter is a six-in-li

    Jan 1, 1995

  • AUSIMM
    Leachwell Versus Fire Assay: Comments from Assay Quality Assurance at Tarmoola Gold Mine

    A fundamental component of grade control at Tarmoola Mine has been the monitoring of assaying through quality assurance programs. The programs have concentrated on issues related to accuracy and preci

    Jan 1, 2000

  • AUSIMM
    Adhesion of Escherichia coli onto Oxide Minerals - Extended DLVO Theory and Flotation Behaviour

    Adhesion of Escherichia coli onto Oxide Minerals - Extended DLVO Theory and Flotation Behaviour

    Sep 13, 2010

  • AUSIMM
    Geology, Geochemistry and Geochronology of the Midas Epithermal Gold System, Nevada

    By G B. Arehart

    The Midas epithermal system is one of the larger low-sulfidation epithermal vein systems discovered in the western US in recent years, containing in excess of 3 Moz of gold (premining). The deposit is

    Jan 1, 2005

  • AUSIMM
    Geological Parameters Controlling the Improvement of Manufactured Sand Using Vertical Shaft Impact Crushers Instead of Cone Crushers

    Geological Parameters Controlling the Improvement of Manufactured Sand Using Vertical Shaft Impact Crushers Instead of Cone Crushers Natural sand is a limited resource. In Sweden the total use of nat

    Sep 13, 2010

  • AUSIMM
    Mining Operational Effectiveness ù An Argyle Diamond Mine Case Study 2002

    Operational effectiveness is fundamental to any operation, becoming highly topical in those experiencing less than optimal output from their fleets. It is all encompassing aiming to identify those fac

    Jan 1, 2003

  • AUSIMM
    Technologies for Sustainable Operations

    By J Temos

    This paper outlines a number of immediate practical approaches to continuous improvement in environmental management in the minerals industry. It puts these into context with longer time-frame step-ch

    Jan 1, 2002

  • AUSIMM
    Grey River Gold Dredge Project

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989. Previous drilli

    Jan 1, 1990