Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan Experience

    In February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct

    Jan 1, 1998

  • AUSIMM
    Plant Design for Closure

    By D P. Murphy, R F. Dewhirst

    Traditionally closure has been seen by the Resource sector solely as a green or an environmental issue, focused primarily on the requirement to rehabilitate the site following cessation of production

    Jan 1, 2006

  • AUSIMM
    Ground Support Design and Application for Developing in Pastefill at BHP Billiton – Cannington Mine

    By J Li

    Cannington Mine has been developing through paste backfilled stopes since the year 2000. These paste drives have been used as either production drill accesses or long-term bypasses. Prior to this stud

    Mar 21, 2011

  • AUSIMM
    Challenges and Opportunities in the Development of a Cultural Heritage Management Strategy at the Lihir Gold Mine, Papua New Guinea

    By J Cook

    In this paper we present a case study of the challenges and opportunities associated with the development of cultural heritage management strategies at the Lihir gold mine in Papua New Guinea. We disc

    Jan 1, 2009

  • AUSIMM
    Extractive Industry - Sustainability Information Systems

    As the title indicates the central themes discussed in this contribution are sustainable development, information systems, and extractive industry. More specifically, the objective is to present a pro

    Jan 1, 2009

  • AUSIMM
    IsaMills™ at Kalgoorlie Consolidated Gold Mines – from the M3000 to the M10 000 and Replacement of the Roasters at Gidji Processing Plant

    By G S. Anderson, N W. McDonald

    "The IsaMill™ was originally developed to address liberation issues at Mount Isa Mines (now Glencore) operations, McArthur River and Mount Isa in the early 1990s. Following on from the industria

    Oct 10, 2016

  • AUSIMM
    Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting Mineralisation

    By R O’Sullivan, D Taylor, J G. McLellan, B Miller

    The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire

    Aug 18, 2014

  • AUSIMM
    Recent advances in tailings testing methods

    By D J. Williams

    The majority of surface tailings storage facilities continue to employ sub-aerial tailings slurry deposition. Surface TSFs are typically sized and operated in a way to minimise the initial capital cos

    Jul 23, 2018

  • AUSIMM
    Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio story

    By J P. Evert

    Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow mod

    Mar 29, 2023

  • AUSIMM
    Managing Geotechnical Risk Through Non-Destructive Rock Reinforcement Testing Trialled at the George Fisher Mine, Mt Isa

    Corrosion affects the performance of rock support and reinforcement at various underground mines, including the George Fisher Mine, where recent studies showed that this risk to mining operations is g

    Nov 25, 2010

  • AUSIMM
    Metallurgical QA/QC – who needs it? The Olympic Dam experience

    By K Ehrig, V Liebezeit, E Macmillan

    The results from metallurgical test programs are used in feasibility studies for design of new plants and brownfield expansions, in long term mine plans, and to make decisions in an operating plant. T

    Sep 11, 2017

  • AUSIMM
    Challenges in Maximising the Value from Epithermal Gold Deposits

    By P Allen, E Gleeson, D Boakye, R Chesher, S Konopa

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Not only do epithermal gold deposits provide many challenges in estimating mineral resource

    Mar 18, 2015

  • AUSIMM
    Application of modelling to improve ventilation and gas management in a single-entry longwall panel

    By D J. Black

    Ventilation modelling is used to evaluate ventilation system performance. This paper describes modelling to assess potential changes to a single entry longwall ventilation circuit to improve ventilati

    Aug 28, 2017

  • AUSIMM
    Ground support design of Northparkes E26 Lift 1 North block cave mine

    By Z Li, A Fleming, S Webster, L Snyman

    Northparkes Mines is developing the E26 Lift 1 North block cave mine, which is adjoined to the existing E26 cave. This paper presents the challenges and methods used to design the ground support syste

    Mar 15, 2021

  • AUSIMM
    Permitting, Construction and Commissioning of the Gosowong Gold Mine, Halmahera, Indonesia

    By D J. Corp

    The Halmahera Contract of Work is a sixth generation contract held 82.5 per cent by Newcrest Mining Limited and 17.5 per cent by PT Aneka Tambang and takes in the Gosowong Project area. In 1991 Newcre

    Jan 1, 1999

  • AUSIMM
    The Tifalmin Porphyry Copper Gold District, Star Mountains, Western Papua New Guinea

    By L D. Queen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Tifalmin porphyry copper district is located in the Star Mountains roughly 35 km north-

    Mar 18, 2015

  • AUSIMM
    Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving Constructability

    By E Rubio, N Morales

    A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the

    Sep 26, 2011

  • AUSIMM
    Summary of Miocene to Recent Conglomerate Provenance and Gold Content and Plate Boundary Tectonics of the West Coast Region

    The West Coast region of the South Island is situated astride the Pacific û Australian plate boundary zone. The most significant component of this zone is the Alpine Fault. A variety of reconstruction

    Jan 1, 1996

  • AUSIMM
    Polar Zoning in Geochemical Ore Systems Based on Examples From the Pacific Rim Deposit

    By V L. Los, G J. Abramson

    The paper examines three types of polar zoning of ore-forming and associated elements that can be detected from geochemical data. Polar zoning is mapped in the form of geochemical ore systems of vario

    Jan 1, 1999

  • AUSIMM
    Inpit Tailings Disposal, Marymia Gold Operation: Case History

    Inpit tailings disposal has been undertaken at a number of mining sites within Australia. This paper presents a brief history of the experience of inpit tailings disposal at the Marymia Gold Operation

    Jan 1, 1999