Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Protection of Underground Mine Structures Due to Adjoining Open Pit Mine BlastingBy L S. Shekhawat, M P. Roy, R K. Paswan, P K. Singh, A Joshi
Blasting in the mining industry is being transformed, and can no longer be treated as an art or a practice purely dependent upon experiences of individuals. Examples of key drivers that have demanded
Aug 24, 2015
-
Monitoring Sb in lead refining using advanced techniques in Industry 4.0By S Zummar, A Van den Bulck, T De Staercke, T Van Rompaey
An increase of 22 per cent in lead usage is expected in the European Union by 2050. During lead refining, the Harris process is a critical step in which a salt melt is used to remove arsenic, tin and
Aug 21, 2024
-
Modelling of Dry Magnetic Separator by Artificial Neural Network at Gol-e-Gohar Iron Ore MineBy B Yeganeh, A Sam, A Kohsari
The base of separation at Gol-e-Gohar iron ore plant (Sirjan in the south of Iran) is magnetic separation after milling. Magnetic separation in the plant is divided into two parts: dry magnetic separa
Jan 1, 2007
-
Designing and Planning for Maximum Grinding Mill Availability - A Team ApproachThe mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d
Jan 1, 2008
-
Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper MineBy R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe
Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch
Jul 1, 2013
-
Redevelopment at Northparkes Following Significant Drive ClosureBy J Samosir, L A. Snyman
Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig
Nov 5, 2014
-
A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental AssessmentBy M Ind, B Usher
Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture
Jul 16, 2014
-
Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the DogBy J Jackson, D C. Curry, A C. Keith
Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a
Sep 29, 2013
-
MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed GradesBy R Wynn, T J. Akroyd, C Costa
In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed
Sep 1, 2014
-
Structural Controls and Strain Partitioning in the Red October Gold Mine, Western AustraliaBy D Howe, J Conn, J G. McLellan, K Gates
The Red October Gold Mine, owned by Saracen Gold Mines Pty Ltd, is located approximately 80 km south of Laverton, Western Australia. It is considered to be of a similar nature to many of the Archaean
Aug 18, 2014
-
Agglomeration – The Key to Success for the Murrin Murrin Ni Laterite Heap LeachBy D Readett
The most critical variable in the successful establishment of the Murrin Murrin Heap Leach plant was the effective agglomeration of the Ni laterite ore. This paper describes the test work undertaken t
Aug 8, 2011
-
Contract Commissioning and Operation of Western Areas’ Cosmic Boy ConcentratorBy C Dick
Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm
Aug 8, 2011
-
Comparison of two and three‐dimensional seepage analysis in tailings dams – a case studyBy N Yarahmadi
Characterization of pore pressure is critical for appropriate design of tailings dams. Furthermore, if seepage rates through tailing embankments increase unexpectedly or become uncontrolled, undesirab
Jul 1, 2021
-
Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, AustraliaBy T J. Sullivan, H Pinkster, G Swarbrick
From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o
Nov 5, 2014
-
A Collaborative Approach to Iron Ore Beneficiation at Assmang Khumani Processing PlantBy S Döpp
Commencing with early experiences in iron ore beneficiation made at Beeshoek Mine, the paper follows through the process of extensive mineralogical and metallurgical investigations carried out during
Jul 11, 2011
-
The Preparation and Consolidation of Tantalum PowderFollowing the preparation of tantalum oxide and carbide (1) an investigation of the details relating to the production of tantalum metal powder was planned. From the literature (2) it was evident that
Jan 1, 1946
-
Predicting changes in static liquefaction susceptibility using cone penetration test resultsBy J T. Sharp, M A. Styler, D McGowan, P W. Mayne
Static liquefaction is a geotechnical hazard in mine tailings facilities. Soils that are contractive in shear are susceptible to static liquefaction. Tailings facilities are dynamic structures, typi
Jul 23, 2018
-
A Simplified Creep Analysis for Low Strength Seams in Rock PillarsBy M Habte
This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a
Mar 8, 2011
-
Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zonesBy J G. McLellan, B Miller
Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio
Sep 20, 2017
-
The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case studyBy D A. Williams, P J. Chapman
The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus
Jul 23, 2018