Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Classification Of Large Seismic Events At The Lucky Friday Mine
By J. K. Whyatt
The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of
Jan 1, 1996
-
A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face
By H. C. Li
Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid
Jan 1, 1992
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction
By Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Influence Of Cutting Sequence On Development Of Cutters And Roof Falls In Underground Coal Mine (e70fc8d5-b1f5-424b-b360-729cb6e50081)
By Anil K. Ray
Roof falls are one of the greatest hazards in underground coal mines worldwide. Due to stringent safety measures and extensive support system development, roof falls have been reduced significantly bu
Jan 1, 2009
-
Geostatistical Methods For Hazard Assessment And Site Characterization In Mining
By Jennifer Riefenberg
Ground control hazards, coal quality, ore reserve estimation, and pollution modeling seem unrelated topics from most mining perspectives. However, geostatistical methods can be used to characterize ea
Jan 1, 1996
-
Continuous Improvement In Cuttable Coal Rib Support In Australian Coal Mines
By Ghassan Skybey
Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages
Jan 1, 1995
-
The Evaluation of Empirical Coal Pillar Strength Formula Based on Uncertainty Criterion
By Navid Hosseini
Several empirical equations to estimate coal pillar strength have been presented in academic studies. The development processes of these equations are similar and are usually obtained by fitting the m
Jan 1, 2012
-
A Casting Method For Artificial Rock Specimens
By Da Zhao Gu
An important problem in rock engineering is to control the properties of artificial rock. A compaction technique for casting artificial rock specimens with controlled properties is described, i.e. usi
Jan 1, 1992
-
Application Of Seismic Tomography In Underground Mining
By D. F. Scott
Seismic tomography, as used in mining, is based on the principle that highly stressed rock will demonstrate relatively higher P-wave velocities than rock under less stress. A decrease or increase in s
Jan 1, 1996
-
Destressing Practice In Rockburst-Prone Ground
By J. Willan
This paper addresses the problem of designing a destress blasting procedure to reduce the incidence of rockbursting in hard rock mines. A review is made of the developed theory and practice of destres
Jan 1, 1984
-
Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)
By Gabriel S. Esterhuizen
A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very
Jan 1, 2006
-
Innovation In Control Of Geomechanical State Of Undermined Rock Mass And Deformations Of Earth Surface
By F. N. Voskoboyev
The suggested new method for control of geomechanical state of undermined rock mass ensures, as a safety measure for the earth surface protection, the decrease of deformations by 2,5 - 10 times in min
Jan 1, 1996
-
Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)
By David Newman
Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to
Jan 1, 2009
-
Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring
By Peter (Yunqing) Zhang
Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution
Jan 1, 2006
-
Rock Classification For Portal Design
By G. K. Rogers
The portal, which is the near-horizontal, surface point of entry to an underground excavation, can often be an exceedingly difficult area in terms of ground control. Surface and subsurface failures at
Jan 1, 1989
-
Innovation in Rock Mechanics: Iced Tailings As Structural Backfill for the Citronen Mine, Ironbark Zinc Ltd., Greenland
By Andrew P. Schissler
The Citronen Zinc-Lead Project is one of the world?s largest undeveloped zinc-lead resources, containing more than 13 billion pounds of zinc and lead metal. The project is located in northern Greenlan
Jan 1, 2012
-
Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)
By Takashi Sasaoka
About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M
Jan 1, 2009
-
Applications of Microseismic Monitoring in China?s Underground Coal Mines
By Xiangxi Wu
Longwall and continuous mining are prevalent methods employed by Chinese underground coal operations. The main ground control challenges include roof skin deformation, roof collapse, and outbursts of
Jan 1, 2012
-
CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining Operations
By Yi Luo
Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer
Jan 1, 2012
-
Roof Control Problems on Development and Longwall Gateroads at a South- western PA Coal Mine
By T. P. Mucho
Over the past several years, two types of roof control problems have been en- countered at Beth Energy's Eighty Four Complex mine in Southwestern Pennsylvania. These problems have been (1) poor r
Jan 1, 1986