Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project

    By Brian Fulcher

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1

    Jan 1, 2008

  • SME
    Assessment Of A Selectivity Criterion For Upgrading Ultrafine Iron Ores By Selective Flocculation

    By A. A. El-Midany

    Traditionally, the choice amongst different upgrading techniques or in finding the optimum operating conditions for a given upgrading technology depends on whether one is looking at the grade or the r

    Jan 1, 2008

  • SME
    Evaluation of Roof Bolter Canopy Air Curtain Effects on Airflow and Dust Dispersion in an Entry Using Blowing Curtain Ventilation Mining, Metallurgy and Exploration (fbebd4c9-e3f3-48b5-bb14-baf48bbb456f)

    By M. R. Shahan, W. R. Reed, J. P. Rider

    Roof bolter operators may be exposed to high respirable dust concentrations on continuous miner sections with blowing face ventilation when bolting is performed downwind of the continuous miner. One s

  • SME
    The Next Step Change In The Size Of Mining Projects

    Many of the world?s largest existing mines are considering substantial step changes in production volumes, compensating for declining ore grades while trying to address increases in world demand for r

    Feb 27, 2013

  • SME
    Arsenic Leaching From A Mine Tailing By Acidithiobacillus Ferrooxidans: Role Of Temperature, Ph, And Pulp Density

    Arsenic (As) removal behavior from Changgoon mine tailings was investigated using Acidithiobacillus ferrooxidans (A. ferrooxidans) in well-controlled batch reactors by varying pulp density (0.5?4%, pH

    Feb 27, 2013

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • SME
    Evaluation Of An Enhanced Gravity-Based Fine-Coal Circuit For High-Sulfur Coal

    By M. K. Mohanty

    One of the main objectives of this study was to evaluate a fine-coal cleaning circuit using an enhanced gravity separator specifically for a high sulfur coal application. The evaluation not only inclu

    Jan 1, 2008

  • SME
    Image-based marine resource exploration and biodiversity assessment with MAMAS (Marine data Asset Management and Analysis System)

    By D. Brün, T. W. Nattkemper, T. Kuhn, T. Schoening

    Underwater exploration for marine resources using camera-equipped devices (OFOS, ROV, AUV) is receiving growing attention. This development is creating a continuously growing pile of digital underwate

    Sep 1, 2014

  • SME
    Mongolia: Little Known Mineral Wealth

    By Louis W. Cope

    Mongolia is known in western countries as the location of rich dinosaur fossil fields. However, the country is even richer in mineral resources. The Ministry of Industry and Trade reports 6,000 mine

    Jan 1, 2006

  • SME
    Use of Seismic Tomography in Mining – Preprint 97-42

    By D. K. Denton, M. J. Friedel, D. F. Scott, T. J. Williams

    Spokane Research Center personnel have been investigating the use of seismic tomography to monitor the behavior of a rock mass, detect hazardous ground conditions, and assess the mechanical integrity

    Feb 24, 1997

  • SME
    Plant-Site Evaluations Of The OPSA System For On-Line Particle Size Measurement From Moving Belt Conveyors

    By Y. K. Yen, J. D. Miller, C. L. Lin

    The image-based On-line Particle Size Analyzer (OPSA)system has been developed at the University of Utah to measure particle size distributions under plant conditions where overlapped and segregated p

    Jan 1, 1999

  • SME
    Planning New Metro Subways?Los Angeles, California

    By Amanda Elioff

    Success of the Gold Line Eastside Extension rail tunnels in Los Angeles has prompted Metro?s planning for two new rail lines to include underground alternatives. The Westside Extension Transit Corrido

  • SME
    Future Of Phosphates Discussed At Florida Conference

    By David R. Gossett

    For the 22nd year, the chance to exchange knowledge, experience and business cards drew hundreds of mining and phosphate professionals for a two-day regional Phosphate Conference in Lakeland, Florida

    Jan 1, 2008

  • SME
    Lake Dorothy Hydroelectric Project Lake Tap And Tunnel, Juneau, AK

    By Jason Morrison

    The Norwegian Lake Tap Method was successfully used to tap into the side of Lake Dorothy 36.5 m (120') below the lake surface. The lake tap allows water to flowinto an access tunnel from the lake

  • SME
    Medium-Temperature Pressure Leaching Of Copper Concentrates - Part III: Commercial Demonstration At Bagdad, Arizona

    By J. O. Marsden

    Parts I and II in this series of papers presented the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical development of a process to effect

    Jan 1, 2007

  • SME
    Microcomputers and Mining : Background and Setting

    By Thomas C. Shapiro

    Introduction In recent years - even months - the number of articles on computers has increased rapidly. One can hardly pick up a newspaper or magazine without seeing a computer-related article. The a

    Jan 2, 1984

  • SME
    Two-Seam Mining Stability at OCI’s Big Island Trona Mina

    By J. F. T. Agapito

    OCI Wyoming mines two flat-lying trona seams that are 3- to 3.5-m- (10- to 11.5-ft-) thick, about10 m (33 ft) apart and 250-m- (820-ft-) deep at its Big Island Mine in Wyoming. Continuous miners and

    Jan 1, 2000

  • SME
    Optimization Of A Grinding And Classification Circuit Of A Magnetite Ore Processing Plant Through Computer Simulation

    By J. A. Delgadillo

    Computer simulation and mineral modeling was applied to the optimization of a grinding circuit in a plant processing 256 t/h magnetite. These tools were used to develop a grinding and classification c

    Jan 1, 2008

  • SME
    Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel Boxes

    By Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman

    Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro

    Jan 1, 2001

  • SME
    Dentifying Opportunities To Reduce The Consumption Of Energy Across Mining And Mineral Processing Plants

    By R. Steele

    In addition to compliance with government emissions and reporting requirements, mining and mineral processing companies are increasing energy efficiency to reduce costs and become more competitive in

    Jan 1, 2011