Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • DFI
    Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:

    By Alun J. Davies

    This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co

    Jan 1, 2000

  • DFI
    Reliability of the Bearing Capacity of Axial Piles Using In Situ Tests

    By António A. Henriques, António Gomes Correia, Ana Teixeira

    "Abstract Pile foundations are often used for important structures, and thus, reliability evaluation is an important aspect of the design. Reliability methods have become increasingly important as dec

    Jan 1, 2014

  • DFI
    Recycling Jet Grout Backflow: Waste Mitigation and Cost Benefits

    By Craig T. Jones, Zachary Q. Maassen

    "Jet grouting is a method of ground improvement that relies on the erosive capacity of high-speed jets to cut and mix the ground in place with a cementitious grout. A continuous return flow of cutting

    Jan 1, 2017

  • DFI
    Dynamic Analysis Of Follower Driven Piles For The Venice Flood Gate Project

    By Frank Rausche

    Without doubt, driven piles are the most economical deep foundation element for a nearshore environment, providing for high bearing capacities and stiffness, quick installation times, assured quality

    Jan 1, 2006

  • DFI
    Estimating N Value from Data in Press-In Piling

    By Yukihiro Ishihara, Nanase Ogawa, Ming Lei

    "Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro

    Jan 1, 2014

  • DFI
    Design Of Cooper River Bridge Foundations

    By Osama Safaqah

    The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town

    Jan 1, 2005

  • DFI
    Route 49 (Penns Neck Bridge) Over Salem River

    By James E. Maccariella

    Replacement of an existing movable bridge with a new low level fixed bridge would not accommodate potential future navigation traffic. In order to replace the existing bridge in a cost effective m

    Jan 1, 2005

  • DFI
    Load Testing High Capacity Drilled Shafts - Summary

    By Jorj O. Osterberg

    Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a

    Jan 1, 2002

  • DFI
    Deep Foundations In Hong Kong - Synopsis

    By Martin Pratt

    This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr

    Jan 1, 2000

  • DFI
    Kinematic Load Tests On A Model Pile In Clay

    By Michael J. Brown

    Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and

    Jan 1, 2002

  • DFI
    Design Strategy For Deep Slurry Stabilized Bored Piles In Compression

    By Chu E. Ho

    Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p

    Jan 1, 2002

  • DFI
    Real Time Validation of Driven Cast In-Situ Piles

    By Derek Egan

    "Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid

    Jan 1, 2014

  • DFI
    Small Diameter Piling System Used In Australia

    By P. J. Yttrup

    Small diameter timber piles are used in Australia to solve foundation problems in soft or filled ground and expansive soil. The paper describes the results of pile load tests to develop simple methods

    Jan 1, 1989

  • DFI
    Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary Displacement

    By Lewis Stansfield

    A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie

    Jan 1, 2000

  • DFI
    Dynamic Analysis Correlation Of Standard Penetration Resistances With The Adhesion Of Very Stiff To Hard Clays On Driven Piles

    By Chris D. Thompson

    In Southern Ontario, Canada, piles are frequently driven through competent clayey soils to obtain end bearing on extremely dense till or bedrock. One reason for this is the difficulty at assessing the

    Jan 1, 2002

  • DFI
    Inelastic Response Of Extended Pile Shafts In Laterally Spreading Ground During Earthquakes (Student Paper Competition 2010)

    By Arash Khosravifar

    The seismic design of extended pile shafts for the combined effects of dynamic shaking and liquefaction-induced lateral spreading is investigated using nonlinear dynamic finite element analyses (NDA).

    Jan 1, 2010

  • DFI
    Influence Of Diameter On The Bearing Capacity Of Lateral Loaded Drilled Shaft

    By Bin Zhang

    Drilled shafts are a popular type of foundation for transportation applications. They feature the advantages of providing high bearing capacity and generating low construction noise. Advancements in

    Jan 1, 2007

  • DFI
    Thermal Integrity Profiling Of Drilled Shafts

    By Gray Mullins

    The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo

    Jan 1, 2010

  • DFI
    Analysis Of Driving Stress Measured In The RC Long Pile

    By Yu Zhenquan

    At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa

    Jan 1, 1991