    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
  • DFI
    Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes

    By John E. Lens

    Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at

    Jan 1, 2011

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    The Theory And Practice Of Deep Foundations

    By Xu Ronglie

    This paper looks back on the developments and achievements of deep foundations, on the basis of the complex geological conditions and environments in China. It sums up advances in theoretical and appl

    Jan 1, 1991

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • DFI
    Performance Of A Large Diameter Drilled Pier (f4c3f0c8-a45b-48d0-8d0a-138a34a08ce3)

    By A. J. Partos

    The figures and tables referred to herein are presented in the Proceedings; Volume I, Pages 309 through 316. The 61-story One Liberty Place, at 315 m., is the tallest building 1n Philadelphia and

    Jan 1, 1991

  • DFI
    "Comparative Pile Load Tests In Alluvial Sands" - I. Introduction

    By Lawrence F. Johnsen

    In 1989, the Connecticut Department of Transportation authorized the evaluation and design for a reconstructed Route 1 bridge over the Quinnipiac River in the City of New Haven, Connecticut. The proje

    Jan 1, 1993

  • DFI
    Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History

    By Gregory A. Stephan

    A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is

    Jan 1, 2003

  • DFI
    Arbitration - The Tender Trap

    By James Green

    It has often been said that the best contracts written are by people who are suspicious of each other. The Spanish philosopher, Ortega y Gasset, said: "Every contract is an Act of Distrust." T

    Jan 1, 1987

  • DFI
    A Study in Extreme Event Large Displacement Analysis of Large Diameter Piles

    By Bret N. Lingwall, Byron Foster

    The problem of reliable extreme event modeling of large diameter piles under enormous structural or kinematic loads has gained more attention in recent years. In particular, the soil response around t

    Jan 1, 2018

  • DFI
    Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge

    By Robb L. Swenson

    Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of

    Jan 1, 2005

  • DFI
    Presentation #6 - Rapid Load Testing: A New Choice For Pile Testing

    By Michael D. Justason

    ...a global perspective... In March of 2000, the Japanese Geotechnical Society added "Rapid Load Testing" to their national standard for pile testing. In the year 2000. it is estimated that th

    Jan 1, 2001

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990

  • DFI
    Deviations From Design Impact Performance Of An Aggregate Pier Supported Embankment

    By Jay L. Hodkinson

    Replacement of an aging twin span river crossing in Vermont required a temporary bridge to accommodate traffic during construction. Soils beneath the temporary approach embankment consisted of very s

    Jan 1, 2011

  • DFI
    Challenges Associated with the Construction of a Cofferdam – A Case Study

    By Eric S. White, Thomas J. Sabourin, Khuram R. Mohib

    "This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init

    Jan 1, 2017

  • DFI
    Pittsburgh Steelers Stadium - Deep Foundations Case Study

    By Larry Rayburn

    In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified

    Jan 1, 2001

  • DFI
    Wharf Damage Due To Settlement Of Deep Soft Subsoil ? Synopsis

    By Z. Y. Ding

    This paper emphasize two points in piled wharf design which are important than structure calculation. First, during design of piled wharf on soft stratum, the bank slope stability is the first importa

    Jan 1, 1991

  • DFI
    The Determination Of The Property Index Of Stabilizing Agent And Computer Simulation For The Optimum Mix In Deep Foundation Construction

    By Li Huimin

    In this paper the step of determining the property index and the program of mixture ratio design of stabilizing agent in deep foundation construction are presented. According to the principle of compu

    Jan 1, 1991

  • DFI
    Mathematical Background For The Design Of Rotating Machinery Foundations With Deep Piles ? Summary

    By Marius B. Wechsler

    There are considered deep piles which are fixed in blocks of rotating machinery foundations. A mathematical background is developed for determining the behavior of this kind of piles for motions cause

    Jan 1, 1987