Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Modelling and Design of Undercarrage Components of Large-Scale Earthmoving equipment in Tarsand Operations Part I?Dozer Applications

    OBJECTIVES ??REDUCE OPERATING COSTS ??INCREASE LIFE COMPONENTS ??EXTEND LIFE of THE DOZER ??REDUCE MAINTENANCE COST ??REDUCE DOWNTIME ??IMPROVE DURABILITY & RELIABILITY ??IMPROVE BOLD JOINTS

    May 1, 2004

  • CIM
    Performance of the oxygen limiting cover at the LTA site, Malartic, Quebec

    By M. R. Julien, A. Maqsoud, J. Martschuk, B. Bussière

    Acid mine drainage (AMD) from mine wastes is one of the most challenging environmental problems currently facing the mining industry. When mining wastes have the potential to produce AMD, the effluent

    Jan 1, 2006

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls Operation

    By Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam

    "NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of

    Jan 1, 2006

  • CIM
    The True North orebody, Fairbanks District, AK: A distal Intrusion-related Au deposit. Kinross Gold Corporation

    By P. W. Jensen

    Gold deposits in Interior Alaska are commonly coincident in time and space with reduced, mid-Cretaceous granitoids. The True North deposit of the Fairbanks district is several km from such granitoids,

    May 1, 2003

  • CIM
    Applied communications

    By B. J. Clauzier

    "The Falconbridge Limited approach to employing communication equipment is first, to determine what is required in a given situation, second, to evaluate the possible alternatives, third, to select th

    Jan 1, 1987

  • CIM
    Controlling Process Water Chemistry to Improve the Flotation of High-Iron Phosphate Ores at Agrium – Kapuskasing Phosphate Operations

    By Balakrishnan Nanthakumar, Marek Pawlik, Dennis Grimm

    "The anionic flotation of a high-iron phosphate ore from Agrium - Kapuskasing Phosphate Operations was investigated through batch flotation tests in the presence of soda ash. The flotation data were s

    Jan 1, 2008

  • CIM
    Controlled blasting to minimize overbreak with big boreholes underground

    By P. R. Day, W. K. Webster

    "The introduction of large boreholes underground initially involved taking the techniques of open-pit bench blasting to the production stope, but with deeper boreholes and narrower stopes more control

    Jan 1, 1982

  • CIM
    Molybdenite Flotation by Controlling Pulp Potential

    By M. Kolahdoozan, H. Noori

    "Molybdenite flotation at the Sarcheshmeh Copper Complex has been studied as a function of pulp potential controlled using two types of sodium sulfide (mineral and chemical origin). Air and either pla

    Jan 1, 2006

  • CIM
    The Economics of Mining and Other Risky Ventures

    By A. P. LeBis

    This article attempts to relate the concept of utility to the risk involved when only a small number of projects (compared to their probability of occurrence) are accessible to a firm and to quantify

    Jan 1, 1978

  • CIM
    Geostatistical Modeling of McMurray Oil Sands Deposits

    By Oy Leuangthong

    The McMurray formation in the Athabasca oil sands deposits of Northern Alberta is part of the world?s second largest proven crude oil reserves. The formation is characterized by stratigraphic layers t

    May 1, 2004

  • CIM
    Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands Interactions

    By Samuel Frimpong

    The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the

    May 1, 2004

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Instrumentation of a Graphite Zone in the #3 Shaft at Brunswick Mine

    The #3 Shaft at Brunswick Mine, Bathurst, New Brunswick, Canada, intersects a soft graphite zone just below the 3400 Level. Ground movement within this zone causes the concrete liner of the shaft to b

    May 1, 2009

  • CIM
    The Use of Aurix®100 Resin for the Selective Recovery of Gold and Silver from Copper, Gold and Silver Solutions

    By Tim Hughes, A. H. (Sandy) Gray, Jennifer Abols

    "The selective recovery of gold and silver from solutions containing other metals such as copper is possible using AuRIX®100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by

    Jan 1, 2006

  • CIM
    Dispersion study on slimes from Niobec

    By J. A. Finch, A. R. Laplante, R. Espinosa-Gomez

    "The Niobec concentrator rejects up to /5% of the Nb as slimes (-10u.m). The recovery of Nb from these slimes by column flotation is being studied. An essential condition for selective flotation is sl

    Jan 1, 1987

  • CIM
    The impact on underground ventilation of the reduction of diesel emissions toxicity by water-in-oil fuel emulsification

    By J. P. Mogan, E. D. Dainty, A. Lawson

    "The toxicity reduction of emissions from two diesel engines by the emulsification of water into fuel oil was investigated to determine the applicability of such systems to underground mining machiner

    Jan 1, 1981

  • CIM
    Comparative Study on Flotation Performance of Stockpiled and Fresh Ore Samples

    By C. Pelley, S. Kelebek, T. Katsabanis, B. Nanthakumar

    "As part of a larger investigation on generation of fines from mining activities and their effect on downstream operations, ore samples from Onaping area stockpiles of Falconbridge Ltd were studied. B

    Jan 1, 2006

  • CIM
    The Union Bay Platinum Prospect, SE Alaska, a Hydrothermal PGE Deposit

    By C. J. Van Treeck

    PGE concentrations of 18 g/t occur in the pyroxene rich rocks at the Union Bay Alaskantype complex. This PGE enrichment is hosted in magnetite veins. These veins cross magmatic layering and have an ir

    May 1, 2003

  • CIM
    Regional Issues Working Group

    By Bill Almdal

    Today?s presentation ? Role of the Regional Issues Working Group ? What does RIWG do? ? How can RIWG?s work benefit Stakeholders? ? Review of forecasts vs. reality ? How have past investment comp

    May 1, 2002