Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application Of In-The-Hole Hammer Drilling At The C. S. A. Mine, Cobar

    The last two years have seen a rapid change-over from mechanised cut and fill. stoping to the more economic and productive long hole open stoping method, such that today more than 80 per cent of to

    Jan 1, 1977

  • AUSIMM
    Taking Stock of Safety

    My early experience with the coal industry was in the latter half of the 1970s, where attention to only ones own æaccidentsÆ and concentration on behaviour controls were impeding the introduction of e

    Jan 1, 2005

  • AUSIMM
    Recent Grinding Practice in the Copper Concentrator of Mount Isa Mines Limited

    By M Gao, V Lawson, W Valery

    Changes in metal prices and mine output over recent years have required the Copper Concentrator of Mount Isa Mines to operate at annual tonnage rates varying from 4.0 million to 6.5 million tonnes. Se

    Jan 1, 2000

  • AUSIMM
    On The Occurrence of Platinum at The Thomson River Copper Mine, Victoria, with a Note on The Optical Properties of Braggite

    By Hart J. G, Anderson J. S

    The presence of platinum metals in the nickeliferous copper ore of the Thomson River Copper Mine near Walhalla, Victoria, was first revealed in 1905 by assays made in the laboratory of the Department

    Jan 1, 1942

  • AUSIMM
    Design and Construction of No. 2 Residue Dam at Rosebery

    By West Coast Staff

    Attention to the design of facilities for drainage, of both surface water and seepage, made it possible to attain, for a qam impounding residues from a concentrating mill, a more stable sand wall whic

    Jan 1, 1958

  • AUSIMM
    The Leaching of Zinc Sulphide Concentrate in Sulphate-Chloride Solutions with Ferric Ions

    Zinc sulphide concentrate from Mount lsa, Australia, was leached in acidic sulphate-chloride solutions using ferric ions as oxidants under atmospheric pressure. The parameters of temperature, particle

    Jan 1, 1994

  • AUSIMM
    Carbon kiln selection, operation and maintenance

    By J K. Claflin, S R. La Brooy, A M. Claflin

    Rotary kilns have been in service in the gold industry to regenerate carbon for 65 years. At the time oxide ores with gold head grades of 8 to 10 g/t were being treated. Carbon could be regenerated ad

    Aug 29, 2018

  • AUSIMM
    Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium Mineralisation

    By M Zengerer

    The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp

    Aug 18, 2014

  • AUSIMM
    Cardox Blasting Trials at Waihi Gold Mining

    By A Van Kersen, J Hodson

    Waihi Gold Mining Co Ltd [WGM], operated by Normandy Mining, has been internationally recognised for its achievements in environmental management at the Martha Mine at Waihi. In a proactive approach t

    Jan 1, 2001

  • AUSIMM
    The Occurrence of Phosphorus and Other Impurities in Australian Iron Ores

    By C M. MacRae

    The characterisation of high-P iron ores by field emission gun electron probe microanalyser (FEGEPMA) was carried out to determine elemental associations in iron oxides sensus lato and, using this kno

    Jul 11, 2011

  • AUSIMM
    Improving Drive Stability through Efficient Development Blasting Design and Practices

    By P Klaric

    Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th

    Aug 24, 2015

  • AUSIMM
    Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer Projects

    By N Lewis

    Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying

    Mar 8, 2011

  • AUSIMM
    Effect of Gravity Recovery on Overall Plant Recovery, Sadiola - A Case Study

    An enhanced gravity concentrator was installed in conjunction with an intensive leach reactor at the Sadiola plant in Mali last year and commissioned in December 2007. There has been much debate over

    Aug 1, 2010

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Prokaryotic Arsenic Metabolism ù Roles in Arsenic Cycling and Bioremediation

    By J M. Santini, I C. A Streimann

    Arsenic is a naturally occurring element in the environment and is toxic to biological systems. Arsenic can exist in the environment in the following redox states, arsenite (+3), arsenate (+5), arsine

    Jan 1, 2004

  • AUSIMM
    Hydrogen reduction of Australia iron ores

    By S Hapugoda, Y Tang, L Lu

    The steel industry is one of the global leading CO2 emitters, accounting for approximately 7 per cent of global anthropogenic CO2 emissions. In 2022, the world produced 1878.5 Mt of crude steel. About

    Sep 18, 2023

  • AUSIMM
    The distribution of gold between bullion, speiss, and slag during zinc-lead smelting

    By Holliday R, Floyd JM

    A laboratory investigation was carried out to determine the distribution of gold between the products of lead-zinc concentrate smelting in the Imperial Smelting Furnace (ISF). Bullion, speiss and

    Jan 1, 1986

  • AUSIMM
    Kinetics of Collector Adsorption on Mineral Surfaces

    By A Holmgren, W Forsling

    In the present study infrared attenuated total reflection (IR-ATR) was used to monitor the rate of in situ adsorption of heptyl xanthate on a layer of zinc sulfide synthesised on a germanium ATR cryst

    Jan 1, 2005

  • AUSIMM
    Ausenco Carbon Reactivation Design Criteria

    By D Preedy, J K. Claflin, S R. J La Brooy

    This paper summarises the lessons learned during a recent carbon reactivation kiln upgrade project at the Sukari Gold Mine in Egypt. The kiln is being replaced to ensure that the plant achieves full v

    Sep 26, 2013

  • AUSIMM
    IsaMill™ Design Improvements and Operational Performance at Anglo Platinum

    By C Rule

    In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan

    Aug 8, 2011