Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain SoilsBy Karl A. H iggins, James P. Racine
"Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o
Jan 1, 2017
-
Core Drilling At Shaft Sites Of Proposed Mine-Water Drainage Tunnel - Anthracite Region Of Pennsylvania - SummaryBy S. H. Ash
THE information obtained by examining and analyzing the core drillings from 15 diamond-drill holes shows that with the proper equipment little difficulty should be experienced while sinking the shafts
Jan 1, 1952
-
Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract ManagementBy Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Guidelines for Selecting Cutoff Wall SystemsBy Mary Ellen Large
This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system
Jan 1, 2021
-
LIDAR Geotechnical Mapping for the Construction of Deep Underground Science and Engineering Laboratory at the Former Homestake MineBy Zbigniew J. Hladysz
A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the US National Science Fou
May 1, 2011
-
Mine Planning at Newmont’s Nevada OperationsBy Steven Hoerger
Newmont Mining has a large, integrated gold-mining operation in northern Nevada with several mines, stockpiles and processing facilities. There are more than 90 defined metallurgical ore types and mo
Jan 1, 1999
-
OFR-129-85 Refinement And Evaluation Of Basic Longwall Dust Control TechniquesBy J. A. Kost
The contract objective was to evaluate the effectiveness of available dust-control technology for double-drum shearers. Eight underground surveys were conducted to evaluate drum design, drum spray noz
Jan 1, 1985
-
Leaching of Copper SulphidesBy Marko Lampi, Marc Nicolle, Janne Karonen, Kari Valkama
"In the ten years from 2003 to 2013 global mine production of copper has increased by over 23% to meet demand while the weighted average head grade has dropped from 0.9 to 0.7% Cu. These divergent tre
Jan 1, 2015
-
The Use of Comparative Sampling Methods at Cleveland Mine, TasmaniaThe use of comparative sampling methods during the evaluation of the tin-copper deposits at Cleveland mine yielded closely checking average results from groove, channel, AXT split diamond drill core,
Jan 1, 1968
-
Mine Rehabilitation Case Studies on the West CoastBy L Langer, R Simcock, M Davis
Rehabilitation of mining sites helps to achieve the purpose 5(2c) of The Resource Management Act 1991 û æavoiding, remedying, or mitigating any adverse effects of activities on the environmentÆ. The e
Jan 1, 1996
-
Detection of Hydrocyclone MalfunctionBy Arnaud Faucher, Claude Bazin, Marilène Renaud, Mohamed Mai Manga
"Grinding circuits are operated in the presence of disturbances due to ore changes and equipment malfunctions. One of the challenges faced by the operators is the detection of a disturbance, the ident
Jan 1, 2010
-
Application of the Woodgrove Staged Flotation Reactor (SFR) Technology at the New Afton Concentrator (48th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 2016)By K. Swedburg, M. Samuels
"The New Afton concentrator was commissioned in June 2012, reaching the design milling rate in September 2012. By late 2013, through a campaign of optimization and de-bottlenecking, it was recognized
Jan 1, 2016
-
The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint VentureBy Roy Lindsay, Paul O'Hara, Gary Halverson
"The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15
Jan 1, 1996
-
RI 7956 Ultraviolet-Visible and Infrared Emission Spectra of Propagating Methane-Coal-Dust Inhibitor FlamesBy Z. J. Fink
Ultraviolet-visible and infrared emission spectra from propagating methane-coal-dust-inhibitor mixtures have been obtained in a 0.2-by 0.2¬by 5.3-m vertical duct over a range of flame speeds from 2 to
Jan 1, 1974
-
IC 9106 Availability Of Elemental Sulfur And Pyrite Concentrate-Market Economy Countries - A Minerals Availability AppraisalBy D. A. Buckingham
Engineering and economic evaluations were performed by the Bureau of Mines on 14 Frasch sulfur, 1 native sulfur, and 21 metal sulfide operations in 11 market economy countries. The evaluation included
Jan 1, 1986
-
Copper Waste Dump LeachingCopper waste dump leaching is growing in importance because of the.large tonnages (up to 250,000 ton/day) of low grade waste rock available from open cut mining of copper deposits and proof that contr
Jan 1, 1967
-
Site Investigation of Saline Gold Tailings Storages in Western AustraliaBy M Fahey
Large volumes of tailings are produced annually by the goldmining industry of Western Australia. This material ishydraulically discharged into large storage facilities usingsub-aerial deposition metho
Jan 1, 2001
-
The use of Personal Computers at Kidd Creek for Process Data Monitoring and AnalysisBy Gordan Marrs, O. Matwijenko
"The Kidd Creek metallurgical site has been highly integrated to maximize revenues from its base metals mines. The site's operations include a Concentrator processing 4.3 million tonnes per year of co
Jan 1, 1989
-
A Quality Control System For Augered Cast-In-Place Pile InstallationBy George G. Goble
The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very
Jan 1, 1997
-
Shaft Sinking Scheduling/Planning - IntroductionBy P. N. Lategan
Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m
Jan 1, 2009