Search Documents

  • NIOSH
    RI 3512 Contributions To The Art Of Smelting Lead Products ? Introduction (fb340d72-fba1-44d8-9b49-1ffab736015e)

    By Virgil Miller

    Bureau of Mines Reports of Investigations 3244, 3245, 3246 and 3264 give data of detailed studies on smelting in the lead "blast furnace handling zinciferous charges at Trail, B. C. The present paper

    Jan 1, 1940

  • CIM
    Gold Losses at Klondike Placer Mines

    By R. Clarkson

    "The Yukon's numerous (185) placer gold mines are still a major social and economic force in this developing economy. Gold recovery at each of the various sluiceboxes is not optimized due to extremely

    Jan 1, 1990

  • SAIMM
    The plasma manufacturing of titania pigment and nano-titania in a pilot plant - Synopsis

    By J. T. Nel

    The establishment of a pilot plant for the continuous production of titania pigment and nano-titania is discussed. The plant was designed, constructed and operated on the Necsa site. The TiO2 producti

    Jan 1, 2010

  • AUSIMM
    Minimising Mineral Project Risk - New Zealand in a Global Context

    Mining ventures are essentially risky businesses. Explorers and project developers (plus their investors and financiers) attempt to minimise the risks involved or at least manage them. Core considerat

    Jan 1, 2005

  • NIOSH
    RI 3314 Flotation Of Vermont Talc-Magnesite Ores ? Introduction

    By J. Bruce Clemmer

    In the experimental concentration of Vermont talc-magnesite ores, talc concentrates and tailings rich in magnesite were obtained. On account of the possible market value of the magnesite, the tailings

    Jan 1, 1936

  • AUSIMM
    Paper No. 170. Fine Grinding Test: Tube Mill And Grinding Pans. Broken Hill South Mine.

    IN December, 1905, a Forwood down-wheeler grinding pan (5 ft dialmter), and similar in design to those in use on the Kalgoorlie goldfields, was installed for experimental work in connection with fine

    Jan 1, 1909

  • SME
    Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses

    By Lee W. Abramson

    Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,

  • SAIMM
    Experimental and numerical modelling of the tunnel face stability

    By J. Trckova, P. Prochazka

    Physical models from equivalent materials satisfying geometrical and physical similarity have been constructed. A special technology of simulating the excavation of an opening at the front part of a t

    Jan 1, 2003

  • SAIMM
    Technical Operating Flexibility In The Analysis Of Mine Layouts And Schedules (719dec4a-da75-4293-bf65-16fc466b0ebb)

    By C. Musingwini

    An often overlooked factor in the analysis of mine layouts and schedules is technical operating flexibility (or tactical flexibility), mainly due to its nebulous nature. By glossing over technical ope

    Jan 1, 2007

  • CIM
    Educating Mining Engineers Online

    By Tad S. Golosinski

    The paper describes Online Master of Engineering Program at the University of Missouri-Rolla and discusses the experience gained during the first three years of its offering. This innovative education

    May 1, 2004

  • AUSIMM
    Stratigraphy of the Thomson Orogen – New Insights from Mount McLaren, North-east Australia

    By C Verdel, M Lee, A Oorloff, K Welsh

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Thomson Orogen is a large but poorly understood element of Queensland geology. Extensiv

    Mar 18, 2015

  • CIM
    Survival strategy: every bit counts

    By O. P. Garg

    "The Iron Ore Company of Canada (IOC) operations in Labrador and Quebec, in Canada, is among the largest openpit mining complexes on a world wide basis. Since the 1981-82 recession, IOC has embarked o

    Jan 1, 1987

  • DFI
    Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction

    By Daniel L. Hanson

    This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently

    Jan 1, 1994

  • AUSIMM
    The Contribution of Diamond Drilling to the Geology and Development of the Ipswich Coalfield

    Drilling at Ipswich during the last twelve years by the Queensland Department of Mines has proved large quantities of reserves which have assured the security of the field for many years to come. This

    Jan 1, 1963

  • SAIMM
    The State of Mine Closure in South Africa – What the Numbers Say

    By M. Olalde, I. Watson

    "The consequences of ineffective mine closure in South Africa are evident from the number of abandoned mines and operations on extended care-and-maintenance, the on-selling of mines to less well-resou

    Jul 1, 2019

  • SAIMM
    Pit Wall Failures On ?Unknown? Structures

    By Phillip M. Dight

    A number of impending and actual pit wall failures have been observed and documented which have been interpreted to initiate on newly generated structural features. This infers failure through intact

    Jan 1, 2006

  • AUSIMM
    Management of Seismicity at the Beaconsfield Gold Mine, Tasmania

    By A R. Penney

    Since mining-induced seismicity first became apparent at the Beaconsfield Gold Mine in 2002, there has been an ongoing program of geotechnical investigations to understand the phenomenon and allow for

    Jan 1, 2008

  • SME
    Overcoming Challenges in the Construction of the Dublin Port Tunnel

    By Tim Brick, Peter Jewell, Stephen Thompson, Simon Morgan

    The $980m (€750m) Dublin Port Tunnel, Europe’s biggest urban highway tunnel project, was opened in December 2006. The culmination of this immense scheme is set to transform the environment, mobility a

    Jan 1, 2007

  • NIOSH
    Numerical Modeling Procedures For Practical Coal Mine Design (237d1a0f-d46f-4124-9918-9eab02bc2008)

    By R. K. Zipf

    A method is presented for creating realistic numerical models for practical coal mine ground control. The method includes procedures to collect the necessary mechanical input parameters from a geolog

  • CIM
    Mechanical properties and fatigue resistance of rails welded with the aluminothermic method

    By J. P. Sancho, J. M. Duart, J. I. Verdeja, J. O. García

    Following a short review of the history of rails used in the transport of passengers and goods, this paper describes the process for rail fabrication, rail structure, and properties, and summarizes th

    Jan 1, 2007