Search Documents

  • AUSIMM
    Presidential Address, 1955

    The first mention of gold in Western Australia was in 1848 when some specimens of copper ore, which are believed to have come from the Murchison district, were sent to Adelaide for assay. Gold was pre

    Jan 1, 1956

  • AUSIMM
    Rehabilitation of Alluvial Gold and Open-Cast Coal Mines û 1904 to 2004

    By M Pizey, C Ross

    Rehabilitation approaches, methods and outcomes have changed markedly over the last 100 years, and especially over the last 20 years. Alluvial gold dredges have moved from creating a legacy of boulder

    Jan 1, 2004

  • NIOSH
    RI 6098 Rapid Determination Of Permeability In Porous Rock

    By Jerry B. F. Champlin

    The successful injection of liquids into subsurface permeable formations for production stimulation, storage, or waste disposal requires a rapid, precise, and accurate method of determining the permea

    Jan 1, 1962

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • AUSIMM
    Geology and Suggested Genesis of Cobalt-Tungsten Mineralization at Mt. Cobalt, North Western Queensland

    Cobalt/tungsten mineralization at Mt. Cobalt, located 170 km southeast of Mt. Isa in northwestern Queensland, is described. Mineralization occurs in the Kuridala Formation of the Mary Kathleen Group,

    Jan 1, 1983

  • SME-ICGCM
    Clay Veins: Their Physical Characteristics. Prediction, and Support

    By Frank E. Chase

    Clay veins, also referred to as clay elastic dikes, have been responsible for numerous underground injuries and fatalities. These hazardous structures are also responsible for increased production cos

    Jan 1, 1984

  • DFI
    Bored Piles With Base Preloading By Grouting - The Polish Experience

    By Bolestaw A. Ktosihski

    Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr

    Jan 1, 2006

  • SME
    The Selection Of Excavation Methods For The Detroit Upper Rouge Tunnel Cso Control Project

    By Jean Habimana

    Complex and distinct geological units spread along the 7-mile long 30-ft inside diameter Upper Rouge Tunnel CSO Control Project in Detroit, Michigan. Its construction is divided in two tunnel construc

  • CIM
    Concepts for Remote Mineral Projects

    By L. J. Vincze

    The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a

    Jan 1, 1980

  • NIOSH
    OFR-79(1)-76 Concept Feasibility Study For Training Equipment To Improve Coal Productivity - Volume 1 Of 2

    By Anthony E. Szczuka

    Two facets of surface mining were studied: feasibility of using training simulators to increase productivity of haulage trucks, front-end loaders, and shovels; and improving the efficiency of dragline

    Jan 1, 1976

  • AUSIMM
    Paper No. 128. The Rise And Fall of Dry Crushing on The Hauraki Goldfield.

    n the early days of the Hauraki goldfield (1866 to 1889) almost the only system of ore treatment was wet crushing followed by copper plate amalgamation. A further saving of bullion was in most cases o

    Jan 1, 1903

  • SAIMM
    Co-Generation: A Challenge For Furnace Off-Gas Cleaning Systems

    By E. S. Schubert

    Keywords: co-generation, furnace CO-gas cleaning, disintegrator scrubber, Theisen In a closed, electric, reduction furnace, no oxygen enters the furnace from the surrounding environment. The off-g

    Jan 1, 2011

  • SME
    Manhattan?s Transformation Is Talk Of The Town At Fox Conference

    Where space is limited, as it is throughout most of the northeastern United States, new construction either takes place high above street level, or below it. In Lower Manhattan, NY both kinds of expan

    Jan 1, 2007

  • AIME
    Institute of Metals Division - Intermediate Phase in the Uranium-Zirconium System

    By A. N. Holden, W. E. Seymour

    DURING the last several years, the U-Zr system has been studied at many laboratories as one of the research programs sponsored by the Atomic Energy Commission. The equilibria in part of this system ha

    Jan 1, 1957

  • AUSIMM
    Production of Cobalt Oxide, Cobalt Sulphate and Electrolytic Cobalt

    In, one stage of the purification sequence of the zinc sulphate electrolyte used at Risdon, cobalt is, precipitated as cobalt nitroso-,B-naphtholate, which is separated from the solution by filtration

    Jan 1, 1949

  • SME-ICGCM
    Effects of In-seam and Near-seam Conditions and Asymmetric Pillar Loading on Coal Pillar Strength

    By Daniel W. H. Su

    The importance of incorporating fundamental principles of rock material response and failure mechanics into a pillar strength design model has been demonstrated. To accurately assess pillar strength,

    Jan 1, 1997

  • SME
    Heavy- Mineral Deposits Of The Fox Hills Formation Located Near Limon, Colorado

    By F. L. Pirkle

    A heavy-mineral deposit about 1.6 kilometers (I mile) in length and averaging about three meters (10 feet) in thickness is exposed approximately130 kilometers (80 miles) east of Denver, along Intersta

    Jan 1, 2011

  • AUSIMM
    The Cementation of Metals form Dilute Aqueous Solution

    A rotating disc geometry was used to provide a uniformly accessible surface for a kinetic study of the cementation of cadmium, lead, and silver from dilute aqueous solutions. This work is an extension

    Jan 1, 1971

  • AUSIMM
    Coal Ash Disposal at Rotowaro Minesite: A Reference Condition Approach to Setting Boron Criteria and Assessing Environmental Effects

    By S Speed, N Corlis, A Goldstone, G N. Browne, M Fitzpatrick

    In 2005, Solid Energy New Zealand Limited obtained non-notified consent for the disposal of 1Mt of coal ash at the Rotowaro minesite, forming part of a coal supply agreement with the Huntly Power Stat

    Jan 1, 2006

  • SAIMM
    The Evolution Of Strategic Long-Term Planning At Anglo Platinum

    By D. C. Andersen, G. L. Smith, J. Pearson-Taylor

    Following a restructuring of Anglo Platinum Limited in 2004 the strategic long-term planning function has been centralized. This paper describes the revised strategic long-term planning process coveri

    Jan 1, 2006