Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Study of load transfer capacity of bolts using short encapsulation push test
By Naj Aziz
A series of laboratory experiments were conducted on a variety of bolt types to examine the load transfer capacities of different profiled bolts in short encapsulation push testing. A 75 mm section of
Jan 1, 2003
-
Full-face Pressure Monitoring in Medium-Weak Roof Condition
By Syd S. Peng
Full-face shield leg pressures in a longwall panel for a three-month period were collected and analyzed. The pressure data were presented in the following forms: full- panel full-face shield pressure,
Jan 1, 1997
-
Investigation Of Subsidence Event Over Multiple Seam Mining Area (b421bdde-19e7-491b-bc6d-a4cce9ef42b4)
By Kewal K. Kohli
An investigation was performed to determine the sequence of events which caused the 1987 surface subsidence and related damage to several homes in Walker County, Alabama, USA (see Figure 1). Surface a
Jan 1, 1992
-
Subsidence Studies In Thick And Steep Coal Seam Mining
By M. Y. Fisekci
This paper concentrates on subsidence measurements, applied over the thick and steep seam mining in the Rocky Mountains Region of Western Canada. The studies to date indicate that two new subsidence m
Jan 1, 1981
-
lnterpanel Barriers for Deep Western U.S. Longwall Mining
By Leo Gilbride
Western U.S. longwall operators face increasing challenges with optimizing ground control and productivity as mines reach greater depths and coal bursting hazards increase. Some western U.S. mines, ma
Jan 1, 2004
-
Investigation Of Blast Damage And Underground Stability
By S. Paul Singh
The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper
Jan 1, 1993
-
Longwall Recovery Utilizing The Open Entry Method And Various Cement-Concrete Supports
By E. Bauer
During 1987 and 1988, the Eighty Four Complex Mine of BethEnergy Mines, Inc. used the open entry longwall recovery method to recover one partial and three complete longwall faces. Various cement- conc
Jan 1, 1988
-
Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek Mine
By Yong-Ming Jiang
In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek
Jan 1, 1998
-
Time-dependent Behavior of Immediate Weak Floor Strata from an Illinois Coal Mines
By Y. P. Chugh
The paper discusses laboratory and field studies to analyze time-dependent deformation behavior of immediate weak floor strata in an Illinois coal mine. In the laboratory, core samples of the immediat
Jan 1, 1987
-
Engineering Classification of Ultra-close Multiple Seam Roofs in Datong Mining District of China
By Yingda Zhai
The range of interburden thickness between coal seams in Datong Mining District of China is large. From mining operation point of view, the closer is between the two seams, the greater is the impact f
Jan 1, 2005
-
Moonee Colliery: Renewing The Economic Viability Of A Mine Using Microseismic And Hydraulic Fracturing Techniques In Massive Roof Conditions
By Peter Hayes
Moonee Colliery operates a longwall extraction system in the Great Northern seam of the Newcastle Coal Measures, approximately 100km north of Sydney, NSW. In the initial mine area of longwall block
Jan 1, 2000
-
Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining
By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes
"Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results
Jan 1, 2010
-
An Alternative To A Manual Torque Check On Roof Bolts
By Joseph A. Cybulski
In response to the mining of reserves with increasingly adverse round conditions and the roof support recommendations of current rock mechanics theories, roof support systems have continued to improve
Jan 1, 1990
-
Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case Study
By Li Yang, Andre Cezar Zingano, Alberto Fronza
"Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f
Jan 1, 2017
-
Chemical Consolidation For Roadway Surrounding Rock - It's Theory And Applications
By Jinhua Wang
Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con
Jan 1, 1996
-
Use of a Laser Grid System for Accurate Roof Bolt Location
By William Kendall
"A tremendous amount of research, analysis, and engineering time is used to design a proper roof support system including the type, length, and location of the roof bolts. Unfortunately, since the roo
Jan 1, 2016
-
Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery Optimization
By David P. Conover, Jake Bain, Christopher M. Ross
"Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining
Jan 1, 2017
-
"Void Fill Techniques for Stabilizing Roof Conditions during LongwallShield Recovery"
By Rusty Mchenry, Craig Dickerson, Robin L. Oldham
"It has been proven that longwall faces can be moved safely and efficiently. However, abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recentl
Jan 1, 2015
-
Salt Pillar Design Equation
By Leo L. Van Sambeek
Specification of properly sized pillars to support the overburden is one of the most challenging aspects of salt mine design. Interest in salt pillar design is heightened by the recent flooding of th
Jan 1, 1997
-
An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden
By Guy Reed, Russell Frith, Kent Mctyer
"Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l
Jan 1, 2016