Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries

    By John Popovich

    The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc

    Jan 1, 2001

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • SME-ICGCM
    Twenty-Four Conferences; More Than One-Hundred and Seventy Papers; Understanding Roof Bolt Selection and Design Still Remains Priceless (2784433d-38ec-4606-8972-993e284de8c3)

    By Stephen C. Tadolini

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

    Jan 1, 2006

  • SME-ICGCM
    Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location

    By Erik Westman

    Few studies have been conducted regarding the location, movement, and relative magnitude of the rear abutment of a longwall coal mine. The rear abutment, or the abutment pressure arch in the gob area,

    Jan 1, 2012

  • SME-ICGCM
    Catastrophic Collapse Of Highwall Web Pillars And Preventative Design Measures

    By Karl Zipf

    In highwall mining, once a sufficient number of web pillars are developed, they can fail catastrophically in a domino-type failure, posing a safety hazard to highwall miners and sterilizing mineable r

    Jan 1, 1999

  • SME-ICGCM
    Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall Recovery

    By Bill Stormes

    This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and

    Jan 1, 2008

  • SME-ICGCM
    German-Chinese Cooperation in the Field of Mining Subsidence Engineering

    By Axel Preusse

    Mining subsidence plays an increasing important role in the Chinese hard coal mining. Reasons for this are a substantial rise of production during the last decade, a dense settlement in many mining

    Jan 1, 2007

  • SME-ICGCM
    Mining Through In-panel Entries and Full-face Recovery Room Without

    By John Smyth

    Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,

    Jan 1, 1998

  • SME-ICGCM
    Geotechnical Assessment Of Skin Reinforcement In Underground Mines (f05de68f-e8c8-43ca-aab9-9a65452cc10f)

    By Jan A. Nemcik

    Steel mesh has been used successfully for many years to control friable roof conditions and prevent loose roof and rib material from caving into the roadway. Despite its extensive use, the installati

    Jan 1, 2009

  • SME-ICGCM
    Technique To Measure Resultant Load Vector On Shield Supports (b937ef33-c51b-4de4-a956-dc8be749fea8)

    By Thomas M. Barczak

    The resultant load vector is the representation of the forces applied to a longwall roof support element by caving strata into a single, quantifiable measure of support resistance. The relatively comp

    Jan 1, 1984

  • SME-ICGCM
    An Overview Of The National Roof Evaluation Accident Prevention (REAP) Program

    By J. M. Krese

    This paper gives an overview of the National REAP program emphasizing the program's current status and future plans. A brief historical review of the program will be given containing roof-fall ac

    Jan 1, 1988

  • SME-ICGCM
    Five Stress Factors Conducive To Bumps In Utah, USA, Coal Mines

    By Joe F. T. Agapito

    High stresses and adverse geology in deep coal mines in the state of Utah, USA, have caused numerous bumps. The larger bumps have been associated with seismic events with Richter magnitudes of 3.6 and

    Jan 1, 2000

  • SME-ICGCM
    Roof Falls: An Inherent Risk In Underground Coal Mining (656e7541-42e3-48b1-8edc-4e23e6c7b7b1)

    By Kourosh Shahriar

    The occurrence of rock falls in underground coal mines entails detrimental effects as fatal or non-fatal injuries on workers, stoppages in mining operations and breakdown of equipment. In this paper,

    Jan 1, 2009

  • SME-ICGCM
    Assessment and Mitigation of Subsidence Effects on a Tall Self-Supporting and Free-Standing Communication Tower

    By Yi Luo

    A longwall mining operation went under a tall, self-supporting and free-standing wireless communication transmission tower. In anticipation of that the ground subsidence process might affect the trans

    Jan 1, 2008

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • SME-ICGCM
    Evaluation of Support and Ground Response as Longwall Face Advances into and Widens Pre-Driven Recovery Room (94eb68ca-11f6-41ed-b8a6-cb9b52889278)

    By Thomas Barczak

    A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal Corporation, and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the

    Jan 1, 2007

  • SME-ICGCM
    Strata Movement of Protective Seam Mining with Large Interburden ?? A Case Study

    By Changsheng Song

    With increasing depth of coal mining in China, the number of coal and gas outbursts has been increasing for years. By means of destressing the protective seam, the gas in the protected seam is drained

    Jan 1, 2008

  • SME-ICGCM
    Extraction of Hard Coal Close to a Shaft

    By Peter Fischer

    Reducing mining costs has become such an important factor in the German coal industry that operators are forced to work only those areas where production costs can be kept low. These areas will normal

    Jan 1, 2007

  • SME-ICGCM
    Overburden Subsidence Characteristics When Mining in Weak Rocks and Subject to Special Mining Conditions

    By Wenquan Zhang

    Based on the mining and geological conditions of Wadong Mine, Longkou City, Shandong Province, China, a viscoelastic model with proper creep parameters was established. The 3-D ANSYS was used to simul

    Jan 1, 2006