Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • CIM
    Water Management in Hydraulic Fill Operations

    By M. Helinski

    In the authors? experience inappropriate water management in hydraulic fill masses has been the root cause of most barricade failures. Inappropriate water management can lead to high water pressures,

    May 1, 2007

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Goldcorp’s Penasquito Pyrite Leach Project

    Peñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit

    Jan 1, 2017

  • CIM
    Control of Size Distribution of the Ore Feeding a Semi Autogeneous Grinding Mill

    By Claude Bazin, François Robichaud

    "The control of the operation of semi autogeneous grinding (SAG) mills is mainly achieved through adjustments of feed rate, water addition and speed of rotation. With the introduction of image based s

    Jan 1, 2013

  • CIM
    The Stillwater Paste Backfill Plant

    By Frank Yu, Bob Fukuhara

    "The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe

    Jan 1, 2000

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • CIM
    MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering Industry

    By Paul Miranda, Corby Anderson

    "The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res

    Jan 1, 2007

  • CIM
    Improving Quality Control and Combustion in Pyrometallurgical Processes using Multivariate Image Analysis of Flames

    By Gianni Bartolacci, Patrice Nadeau, Szatvanyi. Gerard, Carl Duchesne, Claude Chrétien

    "Combustion is used throughout the mineral processing industry to produce steam in boilers, to dry concentrates in rotary dryers, and to apply heat treatments in pyrometallurgical furnaces. Tight comb

    Jan 1, 2005

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • CIM
    A Pilot-Scale Treatment of coal Preparation Plant Effluent by the Selective Agglomeration Process

    The construction, commissioning and operation of a continuous pilot-scale selective agglomeration (oil agglomeration) unit are described. This plant has been used to recover fine coal from an effluent

    Jan 1, 1979

  • CIM
    Western Mines- Myra, Lynx and Price deposits

    By R. H. Seraphim

    "Western Mines Limited produces gold, silver, copper, lead and zinc from a number of Paleozoic volcanogenic deposits near Buttle Lake on Vancouver Island. The deposits were emplaced along a series of

    Jan 1, 1980

  • CIM
    Applied Mineralogy in Industrial and Metallic Mineral Deposits: Examples from Wollastonite, V-magnetite and Muscovite

    By Panagiota Tsolis-Katagas, Basilios Tsikouras, Tassos A. Grammatikopoulos, C. Katagas

    "Mineralogical techniques including microscopic methods, reflected and transmitted light microscopy, Cathodoluminescence (CL) and Scanning Electron Microscopy equipped with an Energy Dispersive Spectr

    Jan 1, 2003

  • CIM
    Making money from wastes: a custom circuit within Clarabelle Mill

    By Alain Bouchard, Germain Labonté, Jim Barrett

    "Mill feed materials that are not run-of-mine ore are often a challenge for mineral processors and tend to accumulate in stockpiles, where they remain unprocessed for many years and become “slow movin

    Jan 1, 2002

  • CIM
    Structural Controls on Massive Sulfide Deposition and Hydrothermal Alteration in the South Sturgeon Lake Caldera, Northwestern Ontario

    By A. H. Mumin, A. K. Somarin, K. S. Oran

    "Synvolcanic structures played a fundamental role in the genesis, morphology, and siting of volcanogenic massive sulfide ores and associated hydrothermal alteration in the Archean South Sturgeon Lake

    Jan 1, 2007

  • CIM
    The Geology of the Central Mineral Belt of Newfoundland: A Collation and Contribution

    By A. K. Snelgrove

    Introduction ?Concerning the inland commodities, as wel to be drawen from this land (Newfoundland) there is nothing which our East and Northe.rly countries of Europe doe yeelde, but the like also m

    Jan 1, 1928

  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • CIM
    Sampling and Assaying of Coarse Gold at La Herradura – Minera Penmont S. de R.L. de C.V., Mexico (50ed6113-280f-4c5e-b31d-b2173f6016d8)

    By Pablo González, Rodolfo Espinosa, Jose-Luis Noyola, Sergio Cossio

    "Minera Penmont, at La Herradura, is a joint venture between Industrias Peñoles, S.A. de C.V., and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura

    Jan 1, 2003

  • CIM
    Understanding the Relationship: Bitumen Production and the Athabasca River

    Overview ?Oil Sands Background ?Water Use in Surface Mining ?Tailings Disposal ?Water Balance for Surface Mining ?Implications of Emerging Regulations ?Water Management Framework ?Tailings P

    May 1, 2009

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004