Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    An overview of the early history of the metallurgical industry in Canada

    By P. Tarassoff

    Extractive metallurgy is concerned with the winning of metals from their ores and concentrates. It is therefore not unexpected that extractive metallurgy in Canada has always been closely linked with

    Jan 1, 1999

  • CIM
    Underground Operations at the Dome Mines (9ecdfeb1-07a6-4c2d-8ca3-2b5b1b6c1ce4)

    By John B. Phillips

    The mine is entered by a central vertical shaft, strongly timbered, and containing two compartments-one for the passenger cage, the other for the large skips bringing the ore to the surface. A man-way

    Jan 1, 1926

  • CIM
    L'exploitation minière du Mont-Wright

    By Gaston Gendreau

    CETTE PRÉSENTATION traitera des différentes phases des opérations de la mine du Mont-Wright depuis ses débuts jusqu'à présent. A une brève description de la géologie du gisement, suivra un exposé

    Jan 1, 1977

  • CIM
    Hematite Precipitation from Sulphate - Chloride Solutions at 150 °C

    By Edouard Asselin, Tasawar Javed

    The precipitation of hematite from ferric sulphate - cupric sulphate - lithium chloride acidic solutions was studied in a batch reactor. The effect of several variables on the extent of hematite preci

    Jan 1, 2015

  • CIM
    Exploitation de la pierre de taille au Québec dans la province de Grenville de 1983 à 1997

    By Yves Bellemare

    Entre 1983 et 1997, l'exploitation de la pierre de taille au Québec a été marquée par l'émergence et la consolidation de plusieurs nouvelles variétés de granit, provenant exclusivement ou presque de l

    Jan 1, 2001

  • CIM
    A New Class of Oxidation-Resistant, Microstructural-Stabilized and Cold-Workable Titanium Alloys for Exhaust Applications

    By C. Schmidt, M. Kohnk, C. Siemers, J. Kiese

    The application of conventional titanium alloys is limited to 550°C due to their poor oxidation resistance. In addition, severe grain growth is observed in single-phase titanium alloys in long-term ru

    Jan 1, 2015

  • CIM
    Stepping Stone Toward Sustainable Development: Improving Environmental Assessment of Mineral Aggregate Resources

    By Heather Budney

    Objectives 1. Evaluate the effectiveness of ON?s EA processes using criteria from the EA and policy sciences literature. 2. Recommend improvements to the EA processes and draw lessons from the ON ca

    May 1, 2008

  • CIM
    Co2 Utilization via Intensified and Integrated Mineral Carbonation: Process and Products Optimization

    By P. C. M. Knops, K. Rijnsburger, R. M. Santos

    To overcome the challenges of mineral CO2 sequestration, this work utilizes a unique proprietary Gravity Pressure Vessel (GPV) reactor technology, and focuses on reaction products of high economic val

    Jan 1, 2015

  • CIM
    Atlantic Continental Margin -its History, its Future

    By G. H. Long, D. H. Magnusson

    THE DEFINITION of the continental margin, as considered in this paper, is in the broad sense: " ... those provinces of the continents and of the oceans which are associated with the boundary between t

    Jan 1, 1970

  • CIM
    Improvements at Bellevue Mine, 1921-1925

    By F. E. Millett

    The following notes deal chiefly with changes from steam to electric drives, or, in the case of the Bellevue pumps, from air to electric. Where electric power can be purchased or generated cheaply it

    Jan 1, 1926

  • CIM
    Rexspar Uranium Deposits

    By Franc R. Joubin, Donald H. James

    "THE PROPERTY of Rexspar Uranium and Metals Mining Co. Limited is situated within 3 miles of Birch Island, British Columbia, a village on the C.N.R. main line 80 miles north of Kamloops. The claims ex

    Jan 1, 1949

  • CIM
    Chromium Removal from Leach Liquors Produced During High Pressure Acid Leaching of Nickel Laterite Ores

    By M. Buarzaiga

    High-pressure acid leaching (HPAL) of nickel laterite ores typically extracts 95% of the nickel and 91% of the cobalt. Impurity elements in the feed, such as iron, aluminium and chromium, also dissolv

    Jan 1, 2004

  • CIM
    Terrain and soil assessment in support of planning for metal mine development

    By M. Walmsley, D. Maynard

    "This paper describes the use of terrain and soil information in the planning of mine developments, particularly in satisfying many of the existing provincial regulatory requirements. It is also noted

    Jan 1, 1981

  • CIM
    The Need for a Coast Smelter

    By C. M. Campbell

    THE dire effects of rapidly vanishing natural resources, widespread unemployment, and increased debt and taxation in recent years have challenged Canadians to produce a practical solution to these nat

    Jan 1, 1939

  • CIM
    The Preservation of Wood

    By R. D. Prettie

    Wood preservation may be defined as the art of protecting wood from decay. In its broadest sense, however, it includes a much wider field. It might be more properly de-fined as the art of protecting w

    Jan 1, 1926

  • CIM
    Use of Concrete 1n Mining at the Jeffrey Mine

    By D. P. R. Smyth

    The limestone reef reservoir at Swan Hills consists essentially of a "buildup" of successively smaller atoll-like layers. Precipitation of calcium carbonate within the lagoonal area of each layer esse

    Jan 1, 1961

  • CIM
    New Developments in Ion Exchange Resins for the Recovery of Gold from Complex Ores

    By J. van Deventer

    Volatile gold prices in the face of rising costs for mining and refining is causing the mines to look for new ways to reduce costs and increase recoveries. This task is complicated by the fact that th

    Jan 1, 2014

  • CIM
    Design and Field Implementation of Alternate Stable Mining Geometries for Set-Up Rooms in Longwall Mining

    By Yoginder P. Chugh

    This paper discusses an ongoing field study in southern Illinois (USA) that focuses on: 1) Identifying mechanisms of instability in the set-up rooms (SR) and their T-junctions with headgate and tailga

    Aug 1, 2013

  • CIM
    Effect of Defocusing Distance and Weld Speed on Laser Welding of TI-5AL-5V-5MO-3CR

    By X. Cao, A. Birur, R. R. Chromik, J. Cuddy, P. Wanjara, J. Gholipour Baradari, T. Shariff

    In this study, 3.1 mm thick Ti-5553 (Ti-5Al-5V-5Mo-3Cr) butt joints were autogenously welded using a 4 kW continuous wave Nd:YAG laser. The effect of welding speed and defocusing distance on the weld

    Jan 1, 2010

  • CIM
    Financial and Geomechanical Optimization for Mine Pushbacks

    By M. Grenon

    OBJECTIVE ?To link slope stability and financial assessment algorithms into a commercially available mine design software packages to provide integrated global pit optimization.

    May 1, 2013