Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Frother and Collector Effects on Flotation Cell Hydrodynamics and Their Implication on Circuit Performance (c615fbc8-d724-48ab-a36a-7fd85aca4c5e)

    By J. E. Nesset

    "Significant progress has been made over the past few years on characterizing and understanding the hydrodynamic properties of frothers and collectors and their effect on flotation performance. This n

    Jan 1, 2010

  • CIM
    Laboratoire d?analyse des fluids

    By Valérie Tremblay

    Plan de la presentation ?Laboratoire d?analyse des fluids ?Gestion des contaminants ?Condition Monitoring Avantages reliés aux analyses ?En savoir plus!! ?pour minimiser les coûts d?opération;

    Feb 1, 2008

  • CIM
    The McClean Lake Operation COGEMA Resources Inc. JEB Mill Process Description and Commissioning

    By Art Carino

    "The McClean Lake operation is located in the Eastern Shore of the Athabasca Basin in northern Saskatchewan some 700-air kilometers north of Saskatoon. It is operated by Cogema Resources Inc., the maj

    Jan 1, 2001

  • CIM
    Field experiments of fault activation in shales

    By Y. Guglielmi, C. Gout, P. Henry, P. Dick

    The key questions about fault reactivation in shales concern the potential enhanced fluid displacement through a previously low-permeability aseismic shale formation. Here we selected a critically-str

    Jan 1, 2015

  • CIM
    Increasing Availability through Advanced Gearless Drive Technology

    By C. Dirscherl, M. Combes

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2014

  • CIM
    Modification of the Stillwater Base Metals Refinery Process

    By L. Newman, R. Wyrick, R. Berezowsky

    The Stillwater Mining Company operates an integrated mines, mill, smelter and base metals refinery complex in Montana, USA for the production of a high-grade platinum group metals (PGM) bearing concen

    Jan 1, 2004

  • CIM
    The NICO and Sue-Dianne Proterozoic, Iron Oxide-hosted, Polymetallic Deposits, Northwest Territories: Application of the Olympic Dam Model in Exploration

    By Kathryn L. Neale, Derek L. Mulligan, Robin E. Goad, Norman A. Duke, A. Hamid Mumin, W. John Camier

    "Abstract - The NICO and Sue-Dianne deposits are being explored and delineated by Fortune Minerals Limited in the Mazenod Lake District of the Northwest Territories, using an Olympic Dam model. The de

    Jan 1, 2000

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • CIM
    Influence of Highly Permeable Geologic Structure on Inflows to A154 N/S Open Pit Diavik Diamond Mines Inc., Lac de Gras, NWT

    By Jeff R. Reinson

    The Diavik Diamond Mine is producing diamonds from two orebodies, the A154 South and A154 North kimberlite pipes, discovered beneath the waters of Lac de Gras. Innovative dike technology with appropri

    May 1, 2006

  • CIM
    Barrick Gold Corporation - Est Malartic

    By Pierre Pelletier, Christian Pichetie, Dany Pelletier

    "IntroductionDuring 1994, Barrick Gold Corporation, or American Barrick at that period, acquired Lac Minerals Ltd. properties. One of them was the Bousquet Complex. The Bousquet Complex is divided int

    Jan 1, 2000

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003

  • CIM
    Changing Company Culture

    By Frank B. Amon

    Highland Valley Copper had to make some significant changes in the way it was working in order to counter the effects of ever-increasing costs and decreasing metal prices. A mine/mill optimization pla

    May 1, 2004

  • CIM
    Comparision of Two Sizes of FSFs in the Glogów Copper Smelter

    By L. Garycki, P. Poks, R. Urbaniak, T. Gabka

    In 2016 at Głogów Copper Smelter KGHM Polska Miedź S.A., after shutting down the shaft furnaces new FSF was launched. Currently, it is the only smelter with two direct to blister flash smelting furnac

    Jan 1, 2019

  • CIM
    The Effect of Shotcrete on the Flotation Nickel Recoveries of Falconbridge Nickel-Copper Ore

    By Peter Wells, Laxman M. Amaratuga, Todd M. Kanhai

    "Certain mining methods (eg. Cut-and-fill) result in the contamination of run-of-mine ore with shotcrete. This shotcrete remains mixed with the ore throughout processing. Experimentation performed by

    Jan 1, 2000

  • CIM
    On-Line Mine ? A New Concept for Improving Mining Economy Through On-Line Mineral Analysis

    By Ilpo O. Auranen

    Background: Mines of today are moving ever increasing tonnages of rock. The new ore bodies tend be of lower grade and located deeper in the earth?s crust. The industry?s focus to overcome this ?deep

    Oct 1, 2009

  • CIM
    Model Predictive Control of the Flotation Process

    By Donald Leroux, Martin Suichies, Andy Trusiak, Chris Dechert

    "In modem concentrators, the operation of flotation machines is often stabilized by simple control loops. Froth level, slurry density and aeration rate are all physical parameters typically controlled

    Jan 1, 1999

  • CIM
    Robust image segmentation technique for rock fragmentation analysis

    By G. K. Mann

    Fragmentation analysis of blast or crushed rock material is a time-consuming and costly process. During the last two decades, the mining industry has been investigating image-based analysis systems as

    Jan 1, 2006

  • CIM
    Application of Multivariate Image Analysis (MIA) to Predict Concentrate Grade in Froth Flotation Processes

    By Pierre Pelletier, Julie Fournier, Gianni Bartolacci, Yves Breau, Dominique Girard, Ahmed Bouajila, Carl Duchesne

    "The development of on-stream analyzers (OSA), such as those based on X-ray fluorescence (XRF), has been key to improve metallurgical performance of flotation processes. However, since these analyzers

    Jan 1, 2003

  • CIM
    Control of Bias and Level in a Laboratory Flotation Column

    By André Pomerleau, Michel Grégoire, René del Villar

    "The operation of industrial flotation columns requires the control of at least two variables, the interface position and the bias rate, by manipulation of some appropriate operating variables. Proble

    Jan 1, 1999