Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "Abstract - The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the La Joya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein (BPV)

    Jan 1, 1997

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia (5a50eab3-2567-48d0-8c87-7819113638f7)

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the LaJoya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein(BPV) type, with a

    Jan 1, 1997

  • CIM
    The Endako molybdenum mine, central British Columbia: An update

    By G. D. Bysouth, G. Y. Wong

    "The Endako molybdenum deposit is located 160 km west of Prince George, British Columbia. It occurs within the main body of the Francois Lake Intrusions, a composite batholith consisting of early, mid

    Jan 1, 1995

  • CIM
    Magnesia Refractories for Steel Furnaces

    By G. M. Carrie

    Introduction The subject of basic refractories is daily becoming of increased importance in metallurgical processes, and there is a constantly growing necessity for the development of better materi

    Jan 1, 1927

  • CIM
    Insurability of Large Gearless Mill Drives

    By L. Bos

    The availability and reliability of large grinding mills and their Gearless Mill Drives (GMDs) are of paramount importance for the grinding process. Although GMDs have been in service for decades, and

    Jan 1, 2012

  • CIM
    The Griffith Mine Story

    By F. P. Morawski, J. E. Schelske, J. R. Geddes, B. R. Eberts, D. M. Wilson, J. D. Jeffries

    "The Griffith Mine is located 200 miles northeast of Winnipeg and is 30 miles south of Red Lake, Ontario. Owned by The Steel Company of Canada Limited and managed by Pickands Mather & Co., it has an a

    Jan 1, 1970

  • CIM
    Determination of Gas Transport Characteristics of Fractured Rock by In-Situ Borehole and Chamber Gas-Injection Tests

    By S. Shimaya, T. Maejima, M. Shimo

    "The authors conducted the in-situ gas-tightness tests in a fractured rock at the Namikata underground LPG storage site in Ehime prefecture, Japan. The test consisted of two independent setups, a gas-

    Jan 1, 2015

  • CIM
    Backfill at Madsen

    By L. H. Van Loon, E. G. Crayston, A. F. Heather

    "IntroductionTHE PROPERTY of Madsen Red Lake Gold Mines. Limited. comprises fifty-eight claims located between Russet and Faulkenham lakes in Baird and Heyson townships of the Patricia portion of the

    Jan 1, 1954

  • CIM
    A Report on Improvements in Drilling and Blasting Practices at IOC?s Carol Lake Project

    By M. H. Pelley

    To increase drill fleet capacity and meet increased ore demands at its Carol Lake Project, the Iron Ore Company of Canada initiated a program in 1975 to convert the Gardner-Denver 120 and Bucyrus-Erie

    Jan 1, 1978

  • CIM
    The Stratigraphy and Oil and Gas Prospects of East-Central Alberta

    By G. S. Hume

    THE Plains of east-central Alberta herein described embrace an area from Viking east to the Saskatchewan boundary and from North Saskatchewan river south to Coronation and Monitor (Figure 1). By far t

    Jan 1, 1937

  • CIM
    Modeling extrusion of alumina and silicon carbide reinforced aluminum metal matrix composites

    By A. Saigal

    A finite element analysis based investigation using DEFORM software was undertaken to model the extrusion of 15% alumina and 15% silicon carbide reinforced aluminum metal matrix composites. The study

    Jan 1, 2004

  • CIM
    Waste Rock Disposal to Improve the Geotechnical and Geochemical Stability of Piles

    Waste rock extracted from a mine is typically stored nearby on the surface. Such waste rock piles must be designed to ensure their geotechnical and geochemical stability during the mine operation and

    Aug 1, 2013

  • CIM
    Influence of Surface Roughness on the Time-Scale of Three Phase Contact Formation by Bubble Colliding with Hydrophobic Solid

    By M. Krasowska

    Dynamics of collision and kinetics of the bubble attachment to hydrophobic solid plates (Teflon) of different surface roughness were investigated. The experiments were carried out in such a way that p

    Jan 1, 2006

  • CIM
    Risk Discounting: The Fundamental Difference between the Real Option and Discounted Cash Flow Project Valuation Methods

    By Michael Samis

    The real option valuation method is often presented as an alternative to the conventional discounted cash flow (DCF) approach because it is able to recognize additional project value due to the presen

    May 1, 2003

  • CIM
    High Temperature PDX of Precious/Base Metal Concentrates from Newmont's Phoenix Project, Using Controlled Precipitation of Sulphate Species to Enhance Silver Recovery

    By J. C. Gathje

    Newmont acquired the Phoenix Project through the acquisition of Battle Mountain Gold in 2000. Shortly after the acquisition, Newmont Metallurgical Services (NMS) and Nevada Operations began developmen

    Jan 1, 2004

  • CIM
    Discount rates and risk assessment in mineral project evaluations

    By Lawrence Devon Smith

    "The concept of risk is well established in the mining industry. It is acknowledged when estimates of reserves are expressed as proven or probable, when mining and metallurgical recoveries are applied

    Jan 1, 2003

  • CIM
    Development of a Process for the Treatment of Electric Arc Furnace Dust and Other Urban Mining Wastes

    By T. Hofbauer, M. J. Dry, G. B. Harris, C. W. White

    "Urban Mining is a term that is increasingly being used, and represents an appreciable source of secondary materials for the metals extraction industry, a source that does not incur mining costs, but

    Jan 1, 2014

  • CIM
    Backfilling at the Sullivan Mine

    By C. D. M. Chisholm

    IN discussing stope filling, or backfilling, at the Sullivan mine, at Kimberley, B.C., a brief description of the problem will first be presented. The Sullivan orebody is a replacement in quartzite, w

    Jan 1, 1941

  • CIM
    The Role of Transportation in the Western Minerals Industry

    By J. H. Morrish

    "The delivered price of any mineral is the determining factor in converting untapped resources into economic resources. Transporting the minerals from the mine to the market plays a significant part i

    Jan 1, 1973

  • CIM
    Statistical Models for Porphyry-Copper-Molybdenum Deposits of the Cordilleran Belt of North and South America

    By Wignall. T. K., J. De Geoffroy

    Statistical models are fitted to the observed distributions of eighteen characteristics of the population of commercial porphyry deposits of North and South America. The statistical base required for

    Jan 1, 1973