    A Techno-Economic Assessment of the Coal Gold Agglomeration Gold Recovery Process

    By I. G. Townsend, S. A. Buckley, C. I. House

    "SummaryBritish Petroleum plc is developing a new gold recovery process known as coal gold agglomeration (CGA) for the recovery of gold from its ores. Liberated gold grains are recovered with high eff

    Jan 1, 1989

  • CIM
    Construction of Headframe and Surface Plant: No. 1 Shaft, Jeffrey Mine, Canadian Johns-Manville Co., Limited

    By K. V. Lindell

    Introduction This paper describes a recent innovation in the design and construction of mine headframes. A reinforced concrete headframe was built by using sliding forms. A concrete headframe of

    Jan 1, 1948

  • CIM
    The Behaviour of Gold in Hemlo Mines Ltd. Grinding Circuit (aa6f7398-0561-40ff-b0b4-243c3a8474e3)

    By S. Banisi, J. Marois, A. R. Laplante

    "This paper compares the behaviour of gold and ore in the grinding circuit of Hemlo Gold Ltd. Particular attention is given to grinding kinetics, classification behaviour, and liberation. For grinding

    Jan 1, 1991

  • CIM
    Numerical Modeling of Standard Rock Mechanics Laboratory Tests using a Finite/Discrete Element Approach

    By S. Stefanizzi

    In the present paper, numerical simulations based on a finite/discrete element approach are used to study deformation and failure process during standard rock mechanics. FEM/DEM modeling has been used

    May 1, 2009

  • CIM
    Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication Backbone

    By Christoph Mueller

    Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi

    May 1, 2006

  • CIM
    The Use of Aurix®100 Resin for the Selective Recovery of Gold and Silver from Copper, Gold and Silver Solutions

    By Tim Hughes, A. H. (Sandy) Gray, Jennifer Abols

    "The selective recovery of gold and silver from solutions containing other metals such as copper is possible using AuRIX®100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by

    Jan 1, 2006

  • CIM
    Gold "Preg-Robbing" by Pyrite: Natural and Process Induced

    By Stephen L. Chryssoulis

    """Preg-robbing"" of gold by carbonaceous matter during the cyanidation of certain types of carbonaceous gold ores is well documented. Recent studies established that ""preg-robbing"" of gold is not l

    Jan 1, 1997

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • CIM
    A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore

    "This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs

    Jan 1, 1989

  • CIM
    Ultra Fine Milling - Biooxidation Processing of Refractory Gold Concentrates

    By R. W. Lawrence, J. B. Austin, P. B. Marchant, J. T. Chapman

    "Biohydrometallurgy is the use of microbiological reactions to assist in the extraction of metals. Bioleaching offers an innovative alternative for the treatment of refractory gold-bearing sulphides (

    Jan 1, 1990

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    A liquefaction incident in a fill raise: A case study

    By F. Hassani, K. Moozar, J. Ouellet, P. Gauthier

    "This paper describes a sudden spill of waste rock used for backfilling from a waste pass at an underground mine in Canada, thus causing a major failure/accident. The mine operator immediately launche

    Jan 1, 2004

  • CIM
    Recent Developments of Laser-Induced Breakdown Spectroscopy for Real-Time Measurement and Control of Mineral Processing

    By Alain Blouin, Mohamad Sabsabi, Aissa Harhira, Paul Bouchard, Greg Lithgow

    "The objective of this study was to demonstrate the application of Laser-Induced Breakdown Spectroscopy (LIBS) to the continuous analysis of online monitoring of Al, Mg, Ni, Mn, Si and Fe in nickel or

    Jan 1, 2016

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    Determining Ore Breakage Characteristics using the Steel Wheel Abrasion Test

    By Tapiwa Chenje, Victor Olivas, Peter Radziszewski

    "Ore breakage and grinding media wear have always been considered and determined separately in laboratory tests. However the two processes are linked with the ore broken down in any comminution device

    Jan 1, 2011

  • CIM
    Selection and Training of Mining Operators at Barrick Veladero; Strategic Factor for Mining Sustainability

    By Zetti Gavelán

    Lack of skilled workforce in mining industry during the current decade has been a serious concern for most mining organization globally. At the beginning of this decade the major envisioned difficulty

    May 1, 2010

  • CIM
    Mocca: A Grinding Circuit Control Application

    By C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher

    "MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con

    Jan 1, 1991

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    Particle Composition Distribution: Measurement and Prediction in Mineral Processing

    By G. Barbery

    "Particle composition distribution is an essential feature of materials processed by physical separation methods. The amenability to segregate a feed material in a concentrate and a tailings stream de

    Jan 1, 1986

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008