Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken Hill

    A Feasibility Study to determine the future of ZC Mines was completed in mid 1987. Early in this study, which lasted two years, it was identified that significant reductions in treatment costs would r

    Jan 1, 1988

  • AUSIMM
    Reduction of Costs and Environental Impacts in Quarry Rock Blasting

    The operation of quarries for the production of crushed stone and aggregates, depends heavily on rock blasting efficiency, which usually represents a major share of total production costs. After inv

    Jan 1, 1990

  • AUSIMM
    Improving Thickener Operation Control

    By Johnston RRM

    There have been many published mathematical models that, to varying degrees of sophistication, attempt to describe dynamic thickener behaviour. CSIRO has undertaken to develop a model under industry

    Jan 1, 1991

  • AUSIMM
    Mechanics of Rock Drilling, Cutting and Future Developments

    By Aziz NI, Guo H

    Most of the existing models of the mechanisms of drilling and cutting processes are oversimplified in both stress state and failure criterion. On the other hand numerical modelling techniques are a

    Jan 1, 1988

  • AUSIMM
    57 Fe M÷ssbauer Effect Spectroscopy Monitoring of Iron-Bearing Products from Beach Sand Minerals Processing

    By D Mukendi-Ngalula, G Hearn

    Beach sand minerals from the volcanic rock structures of the Drakensberg, Kwazulu-Natal, (South Africa) have been processed. Screening, flotation, spiral concentration and magnetic separation methods

    Jan 1, 2000

  • AUSIMM
    Pressure Filtration of Weipa Kaolin

    Extensive reserves of kaolin of the type suitable for use as a high quality paper coating exist on the Weipa Peninsula. In 1986 a commercial processing plant was constructed to produce 100 000 tonn

    Jan 1, 1989

  • AUSIMM
    Technical Aspects of Underground Exploration at Lady Loretta

    By Mitchell G. W, Purvis A. H

    The Lady Loretta silver-lead-zinc deposit lies north of Mount Isa in folded and faulted Proterozoic carbonate sediments. The deposit was discovered in the late 1960's as a result of a soil geo

    Jan 1, 1988

  • AUSIMM
    Evolution in Panel Caving Undercutting and Drawbell Excavation, El Teniente Mine

    By P Yß±ez, G Ferguson

    The El Teniente mine produces more than 340 000 tonnes of fine copper per year from an industrial complex of underground mine, concentrator and smelter. Mass caving methods are employed to deliver app

    Jan 1, 2000

  • AUSIMM
    Thermodynamics of Liquid Cobalt-Gold Alloys

    By Toguri JM

    A solid electrolyte technique has been used to measure the activity of cobalt in liquid cobalt-gold alloys containing between 0.085 and 0.50 mole fraction of cobalt, and for temperatures from just

    Jan 1, 1984

  • AUSIMM
    Process Development of Victorian Brown Coal Liquefaction

    By Matsumura T, Takematsu T

    The Brown Coal Liquefaction Process (BCL Process) has been developed by Nippon Brown Coal Liquefaction Co., Ltd. (NBCL), and a 50-ton-per -day Pilot Plant has been partially completed and put into

    Jan 1, 1987

  • AUSIMM
    Evaluation Of Coals for Conversion To Liquid Hydrocarbons

    Alternative processes for converting coal to liquid products and their stage of development are outlined. The merits of hydrogenationprocesses in general, and the solvent refined coal process in pa

    Jan 1, 1977

  • AUSIMM
    Use of Draglines - Where to in the 21st Century

    Draglines have been a significant part of world open cut mining since the early part of the 20th century particularly for the removal of overburden in the strip mining of coal. Since the mid-1960s dra

    Jan 1, 1992

  • AUSIMM
    Process Circuit Developments-Wet High Intensity Magnetic Separator Plant, Hamersley Iron Pty. Limited Mount Tom Price

    As part of its Concentrator operation Hamersley Iron Pty. Limited uses wet high intensity magnetic separation to upgrade shaley low grade ore in the minus 0.5mm size range. Materials handling probl

    Jan 1, 1978

  • AUSIMM
    The Logical Development of Longwall Mining in the Bowen Basin

    The late 1960's and 1970's saw the initial development of the coal resources of the Bowen Basin of Queensland. The projects developed relied on large scale, open-cut operations using draglin

    Jan 1, 1985

  • AUSIMM
    A Preliminary Model of a Water-Only Cyclone and its Application to Product Quality Control

    By Spottiswood DJ, Kelly EG, Bull WR

    An empirical model of a 254mm water-only cyclone treating minus 17001im coal has been developed. The model includes the prediction of by-passing, SG50 corrected, water split and the use of a single eq

    Jan 1, 1985

  • AUSIMM
    Experience with Stress Control Methods as a Planning Tool Elouera Colliery

    By Quinn P, Huuskes W

    Continued extraction of the No. 3 Seam at Elouera Colliery required the driveage of a sequence of roadways within an area of significantly elevated horizontal stress. Initial roof conditions varied fr

    Jan 1, 1998

  • AUSIMM
    Large Diameter Tunnel Excavation Through Mixed Ground of Clay and Basalt Using Tunnel Boring Techniques

    The excavation of a tunnel through rock and mixed ground of basalt and silty clays presents a challenge to engineering organisations. Such was the situation facing the Melbourne and Metropolitan B

    Jan 1, 1987

  • AUSIMM
    Production of Self-Fluxed Pellets and Improvement of Quality

    By Hanaoka K, Ikeda K

    Kakogawa Works, Kobe Steel, Ltd. has two pelletizing plants and one sintering plant, and the blast furnaces have been operated with 30 - 50% pellets. At Kakogawa Works, various improvements in pell

    Jan 1, 1980

  • AUSIMM
    Recent Developments and Investigations of D.M. Cyclone Coal Preparations at the BHP Port Kemble Washeries

    By Nightingale R, Johnson B, Bensley C, Vince A, Keast-Jones R

    In order to counter the massive increase in the level of near gravity material that would follow the reduction in dense-medium cyclone separation density at B.H.P. Slab and Plate Product Division&

    Jan 1, 1987

  • AUSIMM
    Minimising Sediment Mobilisation within the Ranger Project Area

    By Armstrong AB

    It has been identified that particulate matter in the form of suspended solids and bed load has the ability to adsorb heavy metals. Each year Ranger Uranium Mines Pty Ltd (RUM) identifies potentia

    Jan 1, 1984