Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Comminution Kinetics for Multi-Mineral Ores

    Comminution Kinetics equations are developed to take into account difference of grindability of mineral components. The equations describing both batch and closed circuit grinding or crushing processe

    Jan 1, 1985

  • AUSIMM
    Mine Design with Special Reference to Shaft Pillars at Great Depths

    The paper poses certain questions relating to mine design aspects of deep shaft pillars. It then explores these questions in relation to Western Deep Levels (South) where a sub-shaft system is to

    Jan 1, 1986

  • AUSIMM
    Implications of Mineralogy, Grain Size and Texture on Liberation and Pellet Quality of Great Lakes Iron Ore

    By G W. Scott, H M. Lukey

    The Lake Superior Region has been a producer of iron ore for over 150 years. Early mining operations concentrated on direct shipping ores, which are the result of post-depositional upgrading principal

    Jan 1, 2007

  • AUSIMM
    Paste Fill Operations and Research at Cannington Mine

    By R Rankine

    Backfilling with paste fill has been an integral component of open stoping at Cannington since commencement of operations. Efficient paste filling is critical to successful mining of the Cannington or

    Jan 1, 2005

  • AUSIMM
    The Mining Industry and Career Opportunities from a Graduates Perspective

    The mining industry provides employment opportunities for individuals from a wide variety of disciplines. Solid Energy New Zealand Limited (Solid Energy) is New ZealandÆs largest coal mining company a

    Jan 1, 2007

  • AUSIMM
    IonicRE’s blueprint for enhanced safety

    By D Head

    IonicRE acknowledges within our mining industry, there is a common belief that workplace health and safety, often referred to as safety, is just a matter of ‘common sense’ – something obvious and easy

    Apr 16, 2024

  • AUSIMM
    Development And Production Of The 15 To 13 Level Modified Micaf, Mount Isa Mines Limited

    The Racecourse Orebodies at Mount Isa consist of a series of parallel steeply dipping lead/zinc/silver orebodies with a strike length of up to 1000 metres. Production from these orebodies between 1

    Jan 1, 1977

  • AUSIMM
    Prospecting in Areas of Glacial Overburden in Western Tasmania

    By Orr D. B

    This is a case history of prospec- ting carried out by Comstaff Pty. Ltd. over the Pinnacles Area, part 4 of Exploration Licence 5/63, 9 km north of Rosebery in Western Tasmania. Evidence is prese

    Jan 1, 1977

  • AUSIMM
    A Possible Alternative to Hardwood Chock Pieces.

    By Thompson D, Somerville JM, Brock DA

    The development of a softwood alternative to the hardwood chockpiece used to build the waste-edge breakers commonly incorporated in gateroad packs is described. The results of laboratory tests on so

    Jan 1, 1992

  • AUSIMM
    The Goodyear Nickel Prospect, Carnylia Hill, Western Australia

    By Gole MJ

    The Goodyear nickel prospect is located 45 km southeast of Kalgoorlie (31.04¦S, 121.80¦E) near the eastern boundary of Hampton Area - East Location 45 (Figure 1). Nickel mineralisation was discover

    Jan 1, 1996

  • AUSIMM
    Recycling Galvanised Steel: Operating Experience and Benefits

    By Daniels E. J, Morgan W. A

    In response to the increase in consumption of galvanised steel for automobiles in the last decade and the problems associated with remelting larger quantities of galvanised steel scrap, a process is

    Jan 1, 1993

  • AUSIMM
    A Proton Microprobe for the Geosciences

    By Ryan CG, Cousens DR, Griffin WL

    The proton microprobe is developing into a vital tool in the geosciences, through its high sensitivity for in-situ detection of trace elements in the ppm regime. This paper will describe the instru

    Jan 1, 1989

  • AUSIMM
    The Role of Burden on Fluid Dynamic Phenomena Affecting Blast Furnace Performance

    By Giuli M, Barnaba P, Sacerdote R, Tammaro F

    Following a theoretical consideration of the effect of flooding, fluidisation and softening on blast furnace blowing limits, results are presented which show the effect of these parameters on operati

    Jan 1, 1975

  • AUSIMM
    Support Performance Prediction for Hydraulic Fills

    By Hill J. R M, McDonald M. M

    A prediction technique for support perfor- mance of hydraulic backfill in narrow stopes is applied to two stopes separated vertically by a sill pillar. Predicted stope wall closures and fill pressu

    Jan 1, 1973

  • AUSIMM
    Knelson Continuous Variable Discharge Concentrator: Analysis of Operating Variables

    By I Grewal, B Klein

    The Knelson Continuous Variable Discharge (CVD) is a continuous centrifugal gravity concentrator for high-mass yield recovery applications. It has four operating variables that enable control of mass

    Jan 1, 2001

  • AUSIMM
    Indicator Kriging and Other New Geostatistical Tools

    By Baafi EY

    Geostatistics is now widely used in the mining industry in the estimation of ore reserves and terms like kriging, variogram and estimation variance are becoming well known. Ordinary Kriging (OK) ha

    Jan 1, 1987

  • AUSIMM
    CSAMT Surveys, An Investigative Tool for Detailed Evaluation of Glass EarthÆs Epithermal Gold Targets in the Central Volcanic Region, North Island, New Zealand

    Controlled Source Audio Magnetotelluric (CSAMT) surveys were carried out by Glass Earth (New Zealand) Limited (Glass Earth) in 2006 - 2007 to investigate epithermal gold targets in the central North I

    Jan 1, 2007

  • AUSIMM
    Design Considerations for Reinforcement of Coal Mine Roadways in the Illawarra Coal Measures

    The application of reinforcement techniques to enhance the stability of underground coal mine roadways subject to high stresses is discussed. Research conducted in the Illawarra Coal Measures h

    Jan 1, 1986

  • AUSIMM
    Post Pillar Cut and Fill Stoping at the Dolphin Mine of King Island Scheelite

    By Bedford D. J

    The post pillar cut and fill stoping method has been adopted by King Island Scheelite for the extraction of the main Dolphin orebody. The orebody is a massive, tabular deposit varying from 10 to 50

    Jan 1, 1977

  • AUSIMM
    Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.

    By Baczynski NR, Fagan MJ

    A 3050m long section of a 1.65m internal diameter tunnel is presently under construction in the Brisbane area by means of the pipe-jacking method. The soils along the alignment had been deposited

    Jan 1, 1987