Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Water Management at BHP Billiton Olympic Dam

    BHP Billiton Olympic Dam produces copper cathode, uranium oxide concentrate and refined gold and silver. The operation is comprised of an underground Mine and Processing Plant and is located 560 km no

    Jan 1, 2006

  • AUSIMM
    Innovative digital tools shaping the future of sustainable sprayed concrete operations and operator training

    By P Oikkonen

    Sprayed concrete has played an integral role in underground rock support for nearly a century. However, concrete is also considered to be one of the biggest environmental problems in construction and

    Mar 29, 2023

  • AUSIMM
    New Technology in Hydrology and Erosion Assessment for Mine Rehabilitations

    By Gyasi-Agyei Y

    In recent years rapid advances have been made in the technology used for hydrology and erosion modelling of rural catchments. These advances have been driven by the growing availability of digital t

    Jan 1, 1995

  • AUSIMM
    Defying Gravity – Brownfield Continuous Improvement

    By J Robinson, L D’Uva

    "The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat

    Oct 10, 2016

  • AUSIMM
    Solubility of nitrogen and inclusion characteristics in high aluminium steels

    By M M. Pande, M Ishfaq

    The effect of aluminium on nitrogen solubility was investigated by equilibrating melt comprising master alloy of Fe-Al with pure electrolytic iron in a controlled atmosphere (pure argon) at 1873 K. Ni

    Jun 19, 2024

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Water Quality Trigger Values for Suspended Mud in the Jabiluka Mine Receiving Catchment, NT, Australia

    By M J. Saynor, W D. Erskine an, D R. Moliere

    The Jabiluka uranium mine was constructed in the Ngarradj catchment, a right bank tributary of Magela Creek in the Northern Territory. The Jabiluka Mineral Lease is adjacent to Kakadu National Park, n

    Jan 1, 2004

  • AUSIMM
    Defining Residual Risk for Successful Mine Closure – a Geochemical Perspective

    By T Baumgartl, B Noller, B Forsyth, J Park, M Edraki, P Pham

    Understanding and quantifying residual risk is the key to the successful closure and rehabilitation of mines. An important aspect of residual risk is predicting the long-term chemistry of mine water a

    Jun 28, 2016

  • AUSIMM
    Magnetite – A Higher-grade Blast Furnace Feed and Its Potential Benefits for the Ironmaker

    By K Edwards, A J. J Mouton

    Hematite represents the vast majority of iron ore exported from Australia as the development and processing cost of magnetite is generally seen as a barrier to the development of vast magnetite resour

    Jul 13, 2015

  • AUSIMM
    Mine to mill study – Bond Work index as factor for intrusive and non-intrusive rock type

    By W F. E Ouedraogo

    This study data has been collected on a three-month period from November 2020 to January 2021 and based on three different pits: Vindaloo Main, Vindaloo Central and Bouere. Both pits having specific g

    Jun 22, 2022

  • AUSIMM
    Mining-RoX – Mobile Robots in Underground Mining

    By H Mischo, M Ferber, M Donner, B Jung, S Grehl, A Dietze

    Mobile robots have been making impressive inroads in a variety of domains. Within the Mining-RoX project, Technical University Bergakademie Freiberg is exploring a further frontier for mobile and auto

    Nov 4, 2015

  • AUSIMM
    State-of-the-Art in Tunnel Ventilation Systems Design – Applicable Options to Meet Fire-Life-Safety Code Requirements

    By P C. Miclea

    Transportation networks extend every day around the world, requiring safe and well-maintained structures for efficiency and for users’ safety. Due to specific features of the infrastructure, such as l

    Mar 8, 2011

  • AUSIMM
    Identity Crisis in the Copper Industry (dcdb222c-86b4-4eae-a24d-1e2dcb5e1879)

    Most publicity about the copper industry nowa- days is focused on the adequacy of ore reserves and on excessive mining capacity. These concerns, stemming from public awareness of actual and poten- t

    Jan 1, 1978

  • AUSIMM
    Technology integration for tailings storage facility construction

    By A R. Hollis, M Heddon

    The safe life cycle of a Tailings Storage Facility (TSF) is founded on the fundamentals of proper design, construction, operation and closure. Leinster Nickel Operations (Leinster) utilises four activ

    Jul 1, 2021

  • AUSIMM
    A novel fluorescence sensor for the detection of fluorine bearing minerals in base metal ores

    By J E. Moffatt, N A. Spooner, T J. de Prinse, D J. Ottaway, E Klantsataya, L d. S Teixeira, B W. Smith, T B. Payten, G Tsiminis

    Single wavelength fluorescence sensing has been used in the preconcentration of ores for many years in situations where it is typically specific to the mineral of interest. Examples of fluorescence se

    Nov 10, 2020

  • AUSIMM
    Responsible Tailings Management

    By J Boshoff

    The management and operation of tailings storage facilities (TSFs) are often neglected until the process plant has to shut down as a result of this negligence or as a result of a catastrophic failure

    Jul 27, 2015

  • AUSIMM
    Initial Thoughts on Application of the Volume Loss Approach for Estimates of Surface Settlement Due to Tunnelling in Weathered Rock

    By S Kowalczuk, S V. L Barrett

    The potential for adverse surface settlement during tunnelling in soil and rock poses a significant risk to the successful completion of any tunnelling project. Undesirable ground movement may lead to

    Sep 17, 2014

  • AUSIMM
    Methodology for Selecting Borehole Samples of Iron Ore for Mineral Processing Characterisation

    By G J. I dos Santos

    The risk assessment of mining projects is directly related to the possible failure in estimating, and as estimates are made from sampling results, this activity should be done in a judicious and plann

    Jul 11, 2011

  • AUSIMM
    Platinum Potential of the Pacific Rim of Ural-Alaskan-type Intrusions

    By G Ryan, Yu Nazimova

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. This paper aims to highlight the global exploration opportunities that exist in connection

    Mar 18, 2015

  • AUSIMM
    Alluvial Gold Mining – A Modern Day Gold Rush on the West Coast

    By C L. McIntosh

    The west coast of New Zealand’s south island is host to a large number of placer goldfields that stretch from the Westport area in the north to Gillespies Beach in the south and inland to the foothill

    Aug 22, 2011