Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fundamentally Transforming the Economic and Sustainability Signature of Mining AssetsBy M Jones
The past 100 years the mining industry can be characterised by a focus on increasing financial returns often to the detriment of social, human, manufactured and environmental capitals. Despite the sus
Nov 4, 2015
-
The Greenvale Mine and RailwayDevelopment of the Greenvale orebody, containing 40,000,000 tonnes of nickel ore, began in 1971 and production commenced in 1974. Annual capacity is 2,800,000 wet tonnes. The variations in ore grade
Jan 1, 1974
-
The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western AustraliaBy J Lea, D C. Kettlewell
The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst
Jan 1, 2009
-
Analysis and Adaptability of Belt Filter Presses and Other Technologies for Tailings Dewatering over a Range of Mineral Processes, Plant Designs, Conditions, Regions and Operating PhilosophiesBy M S. Fenzel
Increased environmental regulations and pressures have created changing and new demands for tailings management strategies in a variety of mining applications. Critical among these items is the dispos
Jul 27, 2015
-
Application of rock mass index in the prediction of mine water inrush and grouting quantityBy W Zhu, J H. Zhao, H Ma
The permeability coefficient is an essential parameter for the study of seepage flow in fractured rock mass. This paper discusses the feasibility and application value of using readily available RQD (
Nov 29, 2022
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Mine closure bonds (financial assurances) – the ‘how much?’ conundrumBy G Byrne, A Bowden
There is often a difference in opinion about the allocation of risk in the establishment of mine closure bonds or financial assurances. From the State’s perspective, protection is needed to ensure tha
Jul 25, 2018
-
Applications of Advanced Remote Sensing Systems during a Mine LifeBy B P. Banerjee, S Raval
In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr
Jun 28, 2016
-
Rock Fall Protection Barrier at Mill Area of PT Freeport Indonesia - ABSTRACT ONLYThe mill area of PT Freeport Indonesia is located in a valley surrounded by steep natural slope, characterised by extreme topography with mountains rising to above 4500 m within 100 km from the seasho
Nov 25, 2010
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Mount Isa Mines Copper Concentrator - An Insight into Current and Historical PracticeBy P Radulovic, W Y. Lui
The Mount Isa Mines (MIM) copper concentrator at Mount Isa processes both chalcopyrite ore from the MIM underground mine and rotary holding furnace (RHF) slag from the MIM copper smelter. There have b
Jul 15, 2013
-
Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metalsBy J H. Park, R R. Kim, H S. Park, H J. Kim
This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce
Jun 19, 2024
-
DuPont: A Pro-active Approach to Injury ReductionDuPont is a chemical and energy multi-national of approximately 90,000 employees. Often regarded as the world leader in injury reduction and process safety management, DuPont operate 140 manufacturing
Jan 1, 1997
-
Synergies between renewable-powered mines and community development programs throughout mine life cycle and post-closureBy J Joughin, D Kyan, L Rollin
In line with the 2015 Paris Agreement and corresponding climate disclosure requirements, many mining companies have publicly disclosed that they are developing and/or implementing ambitious decarbonis
Aug 2, 2023
-
Townsville Copper RefineryBy Saint-Smith J. C
The anode, tank house and wire bar plant and operations are described with particular reference to those features of design and methods which are characteristic of this refinery at its inception.Refer
Jan 1, 1961
-
Sensible Cost Cutting for Resource ProjectsBy D Connelly
As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c
Aug 8, 2011
-
Valid spontaneous combustion hazard assessment for surface mine environmental impact statementsBy J Theiler, B Beamish
Spontaneous combustion hazard assessment from an environmental impact perspective is not well understood and is seldom given due consideration in environmental impact statements. In surface mining ope
Jul 25, 2018
-
Salt Dissolution Dynamics on Surface Mine SpoilsBy S Vink, V Nanjappa, C J. Moran
Poor quality water resulting from interaction of surface run-off with saline mine spoil and soils can cause significant problems for water reuse on mine sites. Not only can this saline water lead to m
Jan 1, 2009
-
"Development of a Synthetic Ore Deposit Model for Geometallurgy"By V Lishchuk, C Lund
"Geometallurgy aims to improve resource efficiency by creating a spatial model of an orebody in order to forecast ore processing behaviour. This enables calculation of the economic value of each ore b
Jun 15, 2016
-
The New Paradigm for Phytostabilising Mine Wastes – Ecologically Engineered Pedogenesis and Functional Root ZonesBy T Baumgartl, L Zhou, D Mulligan, L Huang
The rapid production and accumulation of mineral processing wastes in the environment can present serious threats to environmental quality and human health. Phytostabilisation with native plant ecosys
Jul 16, 2014