Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Implementation of a management operating system at the Telfer Underground Gold MineBy M Franklin, C Puglisi, S Fitch
Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and
Mar 15, 2021
-
The Path to Best Practice at Geita Gold MineBy M Monaghan, B S. Gregory
The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I
Sep 18, 2012
-
A Study into Bonding within Reduced Titanomagnetite-Coal CompactsBy R J. Longbottom
In this study the bonding within reduced titanomagnetite-coal compacts was investigated. The aim of the study was to better understand the binding mechanisms in the reduced compacts and, based on this
Jul 11, 2011
-
Evaluation of sustainability of copper production value chain from ore to metal using advanced simulationBy A Remes, A Dennis, M Talikka, T Kotiranta, S Horn
A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan
Jul 25, 2018
-
Relating Textural Attributes to Mineral Processing - Developing a More Effective Approach for the Cadia East Cu-Au Porphyry DepositBy R Berry, S G. Walters, J A. Hunt, D Collett
The texture of an ore type is fundamental in understanding the metallurgical behaviour of an ore. This study will show examples of how quantified textural attributes (mineral shape, grain size and min
Jan 1, 2008
-
Operational Management of Underground In-Seam Drilling SitesBy ZáWang, F Hungerford, T Ren
Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov
Jul 1, 2013
-
Strategic Sustainable Development – Creating Shared Value in the Mining IndustryBy M Jones, G Corder, A C. Keith
"Sustainable development has become an issue of ever increasing importance to the mining industry. The Ernst & Young (EY) mining industry risk radar regularly shows several sustainability elements
Jun 22, 2016
-
Rehabilitation Of Mining Areas With Particular Reference To The Re-Establishment Of Plant GrowthPlant growth is likely to prove the most suitable and satisfactory material to stabilise and cover quarry faces and worked-out surface mining sites. The careful selection of plant species is of pa
Jan 1, 1976
-
Thin Spray-on Liner Concepts and Practical Examples of the Non-Reactive System - MEYCO TSL 865TSL Concepts and Practical Examples of the Non-Reactive System - Meyco TSL 865 Thin Spray-on Liners (TSLs) have been intensively investigated by mining and chemical industries within the last decade.
Nov 25, 2010
-
A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring LocationsBy J Loeb, D Thornton
Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste
Aug 18, 2014
-
Starting-Up the Ernest Henry Underground Mine – Thermal and Occupational Hygiene ChallengesBy O van Baalen
The Ernest Henry Mine is a copper-gold open pit operation situated in northwest Queensland, Australia. It is owned and operated by Xstrata Copper, with a current throughput of 11 Mtpa, however, open p
Mar 21, 2011
-
Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine ClosureBy S Jahn, M Noel, E M. Rykaart, M Pau
Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m
Jan 1, 2003
-
New Technologies for Measurement of Operator Fatigue Helping to Deliver Improved Operator Health, Safety and Performance at the Mt Keith OperationsThe Mt Keith Mining Alliance operates a fleet of large capacity hydraulic face shovels and more than 40 X 240 t capacity haul trucks to deliver annual production in excess of 40 Mbcm per annum. The Mt
Jan 1, 2007
-
Planning for (not so) final land useBy J Durbin
To effectively plan for closure, we must have an end-point in mind. To undertake meaningful rehabilitation, a post-mine land use (or uses) must be known. However, it is becoming more apparent that th
Jul 25, 2018
-
Utilising mine planning to deliver closure landforms through productive movementBy M Bettison, R Wright, N Taylor
The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat
Jul 25, 2018
-
Developing the Foundation Communication Infrastructure to Support Remote and Automated Mining Initiatives in Underground MinesBy D Kent, R Paine
"Automated mining systems are increasingly being seen as a key requirement for a productive mining operation in the future. The importance of an integrated communication network infrastructure to supp
Mar 24, 2014
-
Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo
Jan 1, 2007
-
Reverse stoping using wireless initiation at CSA MineBy B Small
CSA Mine, named after the nationalities of the mines first owners being Cornish, Scottish, Australian, is one of Australia’s deepest and highest-grade copper mines. A combination of the modified Avoca
Mar 29, 2023
-
Evaluation of Underground Mining Options at Xstrata Copper's Ernest Henry Copper-Gold MineBy P Christen, D R. Ashley, G R. Power
The Ernest Henry Mine is currently a copper-gold open pit operation situated in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current throughput of 11 million ton
Jan 1, 2009
-
Effect of Dynamic Pressure on Electronic Detonator TimingBy R Ibarra, H Solis, G Teowee, B E. Papillon
The authors have previously described a piezoelectric-based system to measure the dynamic pressure during actual detonation in the field. This technique is used in a water hammer test set-up where a d
Aug 24, 2015