Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Studies on Chlorination of Rutile and Struverite

    By Azizan A

    The paper presents the results of chlorination of beneficiated rutile and struverite (a tantalum-niobium bearing, rutile type mineral in alluvial tin deposits) by carbon tetrachloride in the range 6

    Jan 1, 1996

  • AUSIMM
    Gas Flow Distribution in the Ironmaking Blast Furnace

    By Burgess JM

    Research on gas distribution in the iron- making blast furnace has been conducted in three separate areas. Firstly, experimental work has been conducted to determine the important parameters which

    Jan 1, 1980

  • AUSIMM
    The Upgrading of the Zinc-Lead Smelter of Commonwealth Smelting Ltd for the 1990Æs

    The Imperial Smelting Process (ISP) for the simultaneous smelting of zinc and lead was developed at Avonmouth from the 1930's with activity intensifying in the late 1940's/early 1950'

    Jan 1, 1989

  • AUSIMM
    Geological Studies for Predicting Artesian Dewatering Requirements at Loy Yang Open Cut, Latrobe Valley, Victoria, Australia

    By Brumley J

    The development of the SECV brown coal open cut at Loy Yang will require depressurisation of aquifers both within and below the coal seam sequence in order to maintain open cut stability. Prediction

    Jan 1, 1988

  • AUSIMM
    The AusIMM's Place in the Australasian Mineral Industry

    The Australasian Institute of Mining and Metallurgy (AusIMM) is a professional society for all those associated with the activities of the mineral industry. Differences of opinion exist within the mem

    Jan 1, 1997

  • AUSIMM
    Rheological Effects in Industrial Ball Milling

    Studies of Theological effects in grinding hold promise for improving this energy-intensive process. Six surveys of the Hellyer ball mill were conducted. The stream and sizing data from these survey

    Jan 1, 1994

  • AUSIMM
    Stope Blast Vibration Analysis at Dugald River Underground Mine

    By J Player, R de Vries, E Villaescusa, R Hassell

    Concerns regarding the uncertainty of stope dilution at MMG Dugald River Underground Mine led to a trial stoping program to acquire full-scale comprehensive geotechnical information and to test the va

    Aug 24, 2015

  • AUSIMM
    Oversize Reduction Project at the Iron Ore Company of Canada

    By R Pinksen

    The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque

    Jul 11, 2011

  • AUSIMM
    The Panguna Orebody: A Case Study

    By Swain H. D, Kay R. L

    Assessment of mineral reserves in any ore- body hinges on both mineralisation characteris- tics and the economics of extraction. The mineral reserves statement depends on interpre- tation of diamond d

    Jan 1, 1979

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    Development of a Predictive Geometallurgical Recovery Model for the La Colosa, Porphyry Gold Deposit, Colombia

    By S Leichliter

    La Colosa, Colombia is a large gold-porphyry deposit currently undergoing feasibility studies by AngloGold Ashanti. This period of development allows the opportunity to apply innovative and emerging t

    Sep 5, 2011

  • AUSIMM
    Kelian Case Study

    By Barlow S

    The Kelian Gold mine project won two excellence awards from the Victorian Division of the Institution of Engineers, Australia. It was a challenging project, fast tracked in a remote and inhospitabl

    Jan 1, 1997

  • AUSIMM
    Developments in Sublevel Open Stoping at Rosebery Mine

    Sublevel open stoping (S.L.O.S.) was introduced at Rosebery in 1972 in the wider ore blocks below 14 level, largely replacing cut and fill methods which had been in use up till that time. During 19

    Jan 1, 1982

  • AUSIMM
    Environment Effluent Control at Roseberry

    Comparatively recent Tasmanian legisla tion established a series of rigid control standards for environmental protection just as ma spectacular expansion of the mining industry was nearing completi

    Jan 1, 1977

  • AUSIMM
    Effect of Explosive Type on Fines Generation in Blasting

    By Beattie T. A

    The ability of explosives to fragment rock has been assessed in small scale trials at the Granite Rock quarry, Baimsdale, Victoria. Three 65 mm diameter holes were fired simultaneously in a five metr

    Jan 1, 1990

  • AUSIMM
    The Application of Neutron-Gamma Sirolog to Estimate Iron Content in Coal And Implications for Estimating Ash Fusion Characteristics

    A field trial of the prompt neutron-gamma SIROLOG technique was undertaken by the CSIRO - Division of Geomechanics at Callide Coalfields during July 1989. The trial investigated whether the sonde c

    Jan 1, 1991

  • AUSIMM
    Immersible Probes Eliminate Sampling in On-Stream Analysis

    By Stump NW

    Until a year ago all isotope on-stream analysis utilised flow cells similar to those designed for conventional X-ray on-stream analysis. These systems incorporated a fairly complex sampling system n

    Jan 1, 1971

  • AUSIMM
    Morning Star Gold Mine Recoverable Ore Reserves = Mining Geology + Practical Cents

    By M D. Goodz, Wright R. F

    This paper highlights the importance of accurate observational technical reports compiled by Mining Geologists and Engineers. Before uncovering the original reports in July 1992, all previous investig

    Jan 1, 1993

  • AUSIMM
    Hydraulic Pressure Information Monitoring System for Underground Supports

    By Lin Bin, Qain Minggao, Qu Qundi, Yao Zhichang

    This paper describes the application of a 89C52 chip microcomputer in hydraulic pressure information monitoring system of powered supports in a coal face, and the details of circuit and software of

    Jan 1, 1998

  • AUSIMM
    Dewatering Open Pit Mines, Yilgran Craton, Western Australia

    Open pit mines in the Yilgam Craton have unique hydrogeological characteristics resulting from a combination of geology, mineralisation and the complex and extended development of the regolith. The pr

    Jan 1, 1993