Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Formulating and Solving Complex Minerals Industry Optimisation Problems û A Systems Approach to Complex Systems ProblemsThe paper provides an overview of the development and content of APCOM symposia since their inception in 1961. This development is set within the context of the academic environment in which much of t
Sep 26, 2011
-
Setting and Origin of Miocene Giant Ore Deposits in the Central AndesBy C Mpodozis
Central Andean (22¦S to 34¦S latitude) Miocene giant ore deposits share common features that reveal their origin. Tectonic and magmatic features include a relation to a shallow subduction zone, an ass
Jan 1, 1999
-
Some Coal Washing Developments in AustraliaCoal washing practice can be improved not only by critical examination of the plant being operated but also by studying plants operated in other areas. The developments at the Australian Iron & Steel
Jan 1, 1975
-
Strata Mechanics of Pillar Extraction Goaf EdgesBy Chaturvedula V. K
Pillar extraction carried out using various methods (split and lift, Wongawilli and Old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting
Jan 1, 1992
-
Dynamic drop testing of Sandvik’s D47 and D39 MDX bolts at the Swerim’s testing facilityBy B Darlington, L Sandberg, O Vallati
The D47 and D39 Mechanical Dynamic Extra bolts (D47 MDX and D39 MDX) have been developed in response to the ever-increasing demand from the mining industry for rock bolts with high dynamic capacity. T
Nov 29, 2022
-
Microbial Aspects of Environmentally Benign Iron OreMany types of micro-organisms inhabit iron ore deposits contributing to biogenic formation and conversion of iron oxides and associated minerals. Bacteria such as Paenibacillus polymyxa are capable of
Jan 1, 2009
-
Methane Drainage Investigation as a Method of Control of Outbursts at West Cliff CollieryBy Griffiths L, Marshall P
fhis paper describes investigations into drainage of gas from the solid to control outbursts. Initial studies conducted on drainage of shear zones showed that, given enough time, these can be succ
Jan 1, 1980
-
Calculating Similarity Among Geological Simulated Images and Reference Images Using Principal Component AnalysisBy E Cunha, D Roldao, TáTamantini, J F. C L Costa, T Webber, C Monteiro
The main problem of geostatistical simulations is to reproduce the real characteristics of the mineral deposit when there are few conditioning data. In this case, the geological interpretation, based
Sep 26, 2011
-
Sinking the New Broken Hill Consolidated Circular AirshaftThe New Broken Hill Consolidated Airshaft is the first major undertaking in the development of New Broken Hill Consolidated Ltd's. property, which adjoins that of The Zinc Corporation Ltd. on the
Jan 1, 1940
-
The Argentine Pyroclastic LoesBy Pati±o A
The Argentine pyroclastic loess arevulcanogenic deposits, which have their sources in the circumnpacific rim. The object of this work is to realize a de-tailed mineralogical characterization of this s
Jan 1, 1990
-
Weak Acid Dissociable Cyanide Analysis Required for International Cyanide Management Code (ICMI) Compliance û Recent Refinements to an Online Weak Acid Dissociable Cyanide Measurement DeviceBy H S. Smit, P Lotz
Gold mining companies who are signatories of the International Cyanide Management Code (visit www.cyanidecode.org for further information) are required to measure WAD cyanide on-line and destroy WAD c
Jan 1, 2008
-
Primary vertical Crafter Retreat Mining at the Zinc Corporation, LimitedBy Hebbard GJ
Vertical crater retreat mining is being used at Zinc Corporation, Limited and New Broken Hill Consolidated, Limited for pillar recovery between previously mined and filled stopes. In order to increase
Jan 1, 1985
-
Perimeter Blast Design at Mt Whaleback Mine, Newman, Western AustraliaThe Mt Whaleback open cut mine South Wall is, in part, developed as an unbenched dip slope. The remainder of the rock slope consists of asymetrical overturned folds which have been locally truncated
Jan 1, 1989
-
Excavation Engineering - The Integration of Excavation Design, Blast Design and Reinforcement DesignBy Chitombo G. P, Thompson A. G
Excavation engineering involves three key design processes; excavation design, blast design and reinforcement design. An excavation engineering methodology is proposed in an attempt to promote integ
Jan 1, 1995
-
Quantifying the energy efficiency transformation at Cadia due to HPGR crushingBy J Seppelt, G S. Lane, E Wang
Newcrest’s Cadia concentrator operated from 1998 to 2012 with a traditional SABC grinding circuit treating Cadia open pit ore. The Cadia comminution circuit was well characterised through surveys and
Aug 29, 2018
-
The Geometry and Petrography of Stockwork Vein Swarms, Macraes Mine, Otago Schist, New ZealandBy D Craw
The Macraes gold deposit is located in a low angle NE dipping (~15¦) shear zone, the Hyde Macraes Shear Zone (HMSZ) cutting greenschist facies metasediments of the Otago Schist. The shear zone is host
Jan 1, 2004
-
A Methodology for Geometallurgical Mapping and Orebody ModellingBy L Keeney
Geometallurgy is not a mechanism designed to replace current geological and metallurgical deposit characterisation but an added component required to understand orebody variability. Current geological
Sep 5, 2011
-
Geoscience 2033 – a vision for mineral exploration in ten yearsBy C Itotoh, K O’Halloran, L Karlson
Global methods used to explore for minerals have progressed relatively slowly since the development of the first diamond core drill in 1863. Since then, key developments such as wireline geophysics (1
Sep 18, 2023
-
Assaying Cyanide-Extractable Gold Within an Hour, and Addressing Effects of Preg-and Assay-RobbingCyanide-extractable gold is far more meaningful in the definition of ore, and control of extraction, than fire- assayable or aqua regia digestible gold. The use of cyanide- extractable gold addresse
Jan 1, 1992
-
Evaluating the Effects of Non-coaxial Charges for Contour BlastingBy J Seccatore, F Golin, E Munaretti, M Cardu, J C. Koppe, J Bettencourt
Contour blasting is commonly performed by employing linear charges decoupled from the boreholes. This method is common in surface and underground excavations, either for civil or mining purposes. To a
Aug 24, 2015