Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Managing Uncertainty on the Cut 8 Project

    By G M. Jones, J Rademan

    Debswana, owned by the Government of the Republic of Botswana (GRB) and De Beers in a 50:50 joint venture partnership, operates the Jwaneng diamond mine in Botswana - the most valuable diamond mine in

    May 24, 2012

  • AUSIMM
    Firedamp Drainage Installations

    Firedamp drainage has become an essential part of many mine environmental systems, and new applications are arising. Installations are evolving further to satisfy ever changing basic requirements,

    Jan 1, 1982

  • AUSIMM
    Optimising the Long Term Profit base for Consolidated Rutile Limited

    Consolidated Rutile Limited (CRL) was one of the best performing mining stocks of the turbulent 1980s, having a very high payout of franked dividends. In contrast to some other mining groups, it was

    Jan 1, 1991

  • AUSIMM
    Development of Newmont's Minahasa Gold Mine in Indonesia

    The green field discovery of a two million ounce high-grade refractory gold ore deposit in the Indonesian Province of Sulawesi Utara, led Newmont to utilise its proven technical expertise in dry grind

    Jan 1, 1997

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    Mining in Fiji

    The nation of Fiji is located the South Pacific on the æRim of FireÆ some four hours flying time from the eastern sea board of Australia. It is a tourist destination situated on the main route from Au

    Jan 1, 2004

  • AUSIMM
    Dense media separation – a valuable process for preconcentration

    By I Grewal, M Lundt

    Dense medium separation (DMS) is one of several preconcentration methods used for early waste rejection from run-of-mine ores at relatively coarse particle sizes prior to additional milling and benefi

    Sep 11, 2017

  • AUSIMM
    A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation

    By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine

    Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i

    Jul 25, 2018

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • AUSIMM
    Present Practices And Future Trends In World Dry Bulk Handling Operations

    Over a century ago the first ship designed solely for carrying a bulk cargo was launched. This vessel, the "John Bowes", with a deadweight of 660 tonnes was a single decked ship with machinery and

    Jan 1, 1973

  • AUSIMM
    Tube Making in Australia

    The title of this paper suggests rather a comprehensive survey of the industry, but since it is not possible to do justice to this in a short paper, and, as the bulk of the Australian trade consists o

    Jan 1, 1935

  • AUSIMM
    Quantifying economic and environmental impacts of preconcentration

    By E Amini, M Scott

    Grade Engineering® involves the planning, integration and operation of coarse preconcentration techniques to reject uneconomic material as early as possible in the mining value chain to improve the qu

    Nov 10, 2020

  • AUSIMM
    Geotechnical strata characterisation using geophysics and its application for coal mine design

    By T Medhurst

    Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g

    Nov 30, 2018

  • AUSIMM
    Mine Wastes as Cover Materials in a Water-shedding Soil Cover in North-West Queensland

    By T Baumgartl, C Gonzales, A Soliman, M Edraki

    A soil cover isolates potentially acid-forming (PAF) mine wastes from atmospheric interaction and thereby mitigates acid mine drainage. As a cover that comprises either a single layer or a composite b

    Jul 16, 2014

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    A simple and accurate method for Ore Reserve estimation and Mineral Resource depletion in caving mines

    By A D. Campbell

    Conversion of Mineral Resources to Ore Reserves requires a multidisciplinary approach and application of a number of Modifying Factors. The Modifying Factors for mining, particularly dilution and reco

    Oct 16, 2017

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    Practical Considerations when using Auxiliary Axial Flow Fans as a Primary Mine Fan

    By D Roughsedge, J van der Sandt, L van den Berg

    Axial flow fans are commonly used as auxiliary fans in underground mines to supply air to development headings. As diesel dilution requirements increase the fans used in conjunction with ventilation b

    Jul 1, 2013

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    How Mining is Catching Up

    In terms of tunnelling the mining industry is generally thought of as the crude cousin of the civil construction industry. Mining has tended to concentrate on speed and flexibility rather than the hig

    Jan 1, 1999