Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Analysis of dust behaviour in the face zone utilising- CFD modelling tools

    By O Joneydi, J Viljoen, R Funnell

    Computational Fluid Dynamics (CFD) modelling is a useful tool that can assist engineers in designing effective ventilation systems for the control of airborne dust generated during mining operations.

    Oct 12, 2022

  • AUSIMM
    TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment Manufacture

    By J M. Shekiro

    In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most

    Oct 5, 2011

  • AUSIMM
    Predicting Iron Ore Fines Shipment Moisture

    By J E. Everett, D Linden, P Maney

    In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for

    Aug 12, 2013

  • AUSIMM
    Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value Chain

    By D Smith, A Ramdhani, J Francke

    Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement

    Aug 18, 2014

  • AUSIMM
    Newmont Tanami Operations – Tailings Storage Facilities

    By S Thacker, M Noakes

    The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and

    Jul 27, 2015

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Operational readiness – what is it and how to get it done?

    By A G. L Pratt

    Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f

    Mar 29, 2023

  • AUSIMM
    Development of new performance prediction models for a raise boring machine based on indentation tests

    By C Balci, D Tumac, A Sheterpour-Mamaghani, E Dogan, A Kocbay, T Erdogan, A Gumus, H Copur, E Altintas

    Excavation of vertical and/or inclined shafts in the underground structures requiring careful design and planning. Raise Boring Machines (RBMs) are commonly used for excavation of shafts for different

    Nov 29, 2022

  • AUSIMM
    Vivien Mine modelling back analysis to forecast ground conditions and ground support

    By J Player, P Mikula, G Sweby

    A numerical modelling back-analysis exercise was carried out at a WA gold mine at which early signs of seismicity (rock noise, scatts from active faces) were becoming apparent as depth of mining incre

    Nov 29, 2022

  • AUSIMM
    Is Measuring pH Enough?

    By J Kinal, I Mitchell

    Many flotation plants use pH to adjust the pulp chemistry of their system to achieve optimum separation. For example, in a sequential lead/zinc circuit the pH during sphalerite flotation is increased

    Jan 1, 2006

  • AUSIMM
    Perimeter Control Utilising Electronic Detonators at Mount Wright Mine

    By J Wall

    The use of electronic detonators in civil tunnelling applications, to reduce vibration in small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen

    Mar 21, 2011

  • AUSIMM
    Lighting up the dark – the use of 3D seismic to optimise mine plans at structurally complex Blackwater mine

    By N Pranoto, E Lawell, T Dean, M Grant

    The Goonyella Riverside Mine is located 30 km north of Moranbah in Central Queensland, Australia. Recent mining activities have exposed the north–south striking Kenya and Zimbabwe thrust Faults. These

    Mar 22, 2022

  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • AUSIMM
    Process Implications of Ferrolysis in Hyper-Saline Water

    By J Bean

    Iluka Resources Ltd developed the Jacinth-Ambrosia Mine (Jacinth) in the Eucla Basin during 2009 and 2010. In this arid climate the operation relies on hyper-saline groundwater from a palaeochannel fo

    Oct 5, 2011

  • AUSIMM
    Mapping and Prioritising Rehabilitation of Abandoned Mines in Australia

    By A M. Lechner, V Glenn, M Edraki, D R. Mulligan, C Unger

    With more than 50 000 recorded abandoned mines in Australia, effective management strategies are needed to prioritise and manage health, safety, environmental and socio-economic risks and opportunitie

    Jul 10, 2012

  • AUSIMM
    Challenges and Opportunities in the Development of a Cultural Heritage Management Strategy at the Lihir Gold Mine, Papua New Guinea

    By J Cook

    In this paper we present a case study of the challenges and opportunities associated with the development of cultural heritage management strategies at the Lihir gold mine in Papua New Guinea. We disc

    Jan 1, 2009

  • AUSIMM
    A Three-Dimensional Model of MuckpileFormation and Grade Boundary Movement in Open Pit Blasting

    By Kavetsky A

    In surface mining operations, the ease with which a muckpile may be dug is a dominant factor in mining efficiency. Within broad limits, this is largely dependent on muckpile shape and looseness with

    Jan 1, 1989

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Alluvial Platinum-Group Minerals in Southern New Zealand (PACRIM'95)

    By M.J. Mitchell

    Platinum-group minerals (PGM) are recorded from a number of localities along the Waiau River, western Southland, and the south coast of the South Island, New Zealand. At each locality, small amounts

    Jan 1, 1995

  • AUSIMM
    Effects of Melt Composition on the Interactions of Sinter Melt on a Natural Iron Ore Substrate

    By S Hapugoda, J R. Manuel, M P. Ma, L Lu

    Iron ore sinter quality depends heavily on the mineralogy, textures and physical structure of the sinter, which is formed upon solidification of the primary sinter melt. The interactions of the initia

    Aug 12, 2013