Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    The Effects of Considering the Spatial Bulk Density Variability in Mineral Resources and Reserves

    By J F. C L Costa, J C. Koppe, C Diedrich

    Currently mineral resources evaluation is firstly expressed in terms of volume. Next the resources are transformed into tonnes by using an average bulk density applied to the whole deposit or, in some

    Sep 26, 2011

  • AUSIMM
    Olympic Dam Operations Review

    The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y

    Jan 1, 1998

  • AUSIMM
    Transforming dust control – lessons from tunnelling

    By A De, B Palmer, rade, P Stowasser, A Fanning

    Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions

    Apr 16, 2024

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway Project

    By W M. Tekano, T S. Coulter, N M. Hutt

    The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell

    Jan 1, 2003

  • AUSIMM
    The Use and Optimisation of Ferrous Feed at the Whyalla Blast Furnace

    By G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis

    Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability

    Jul 13, 2015

  • AUSIMM
    Go with the flow – managing hydrogeological staff turnover at Ernest Henry mine

    By C Hawtin, B Miller, D Ashton

    Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we

    Sep 20, 2017

  • AUSIMM
    Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USA

    By S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick

    Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir

    Nov 4, 2015

  • AUSIMM
    Express Rail Link – Challenges of Tunnelling Through Hong Kong and into Mainland China

    By A Morris

    The Express Rail Link (XRL) will provide high-speed rail services from Hong Kong to Guangzhou and a connection to the national high-speed passenger rail network serving major cities throughout Mainlan

    Mar 8, 2011

  • AUSIMM
    The æMountain Camp Reef' at Alford's Mine, Wakamarina, Marlborough: Active Role of Fault Dynamics Controlling Lode Emplacement

    The æMountain Camp reefÆ at Alford's mine, Wakamarina,Marlborough, had no recorded gold production although assays of 5 - 26 g/t were reported, but it did produce c. l000 kg of scheelite. The lod

    Jan 1, 1996

  • AUSIMM
    Exploration and Mining Unified through Seismic Imaging

    By J Dwyer, G Turner, D Pridmore, M Urosevic

    Due to their ability to produce high-resolution images of the subsurface to great depths, seismic surveys provide critical inputs to almost all oil and gas exploration projects. However, with some not

    Nov 4, 2015

  • AUSIMM
    New perspectives in iron ore flotation – from fundamental studies to on-site pilot testing

    By L O. Filippov, A Piçarra, I V. Filippova, N P. Lima, K Silva

    The reverse cationic flotation using the starch as depressor of iron oxides is the most efficient upgrading process when is applied to the simple systems composed by hematite/magnetite and quartz. The

    Aug 24, 2022

  • AUSIMM
    A global review of productivity and operational performance in sublevel caving mines

    By A D. Campbell

    The sublevel caving (SLC) mining method is becoming more widely adopted as an underground mining method as mines become deeper and target lower grade mineralisation. SLC has been successfully adopted

    Mar 29, 2023

  • AUSIMM
    The Behaviour of Barium, Strontium, Aluminium, Chromium and Molybdenum when Leaching Fly Ash with Acid Rock Drainage

    By M BSckstr÷m

    Acid rock drainage (ARD), commonly found in vicinities of sulfidic mines, possess properties capable of widely affecting the surrounding environment by acidification and heavy metal pollution. In most

    Jan 1, 2008

  • AUSIMM
    Innovation in mining – a contractor’s role

    By D Kilkenny

    Underground contractors in the mining industry must be prepared to take a position at the forefront of innovation of equipment and work methods in order to maintain a competitive advantage over in-hou

    Oct 16, 2017

  • AUSIMM
    Improved Trigger Action Response Plan Development Based Upon Mine-specific Data

    By D Cliff, B Belle

    Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a

    Aug 31, 2015

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011

  • AUSIMM
    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013

  • AUSIMM
    Tropicana - Unravelling the complexity of a +6 Million Ounce Gold Deposit Hosted in Granulite Facies Metamorphic Rocks

    By J Savage, A Crawford, M Doyle, N McNaughton, T G. Blenkinsop

    Area selection criteria for gold exploration have historically highlighted the low prospectivity of high-metamorphic grade terranes relative to regions with lower metamorphic grades. The Tropicana gol

    Sep 26, 2013