Numerical Analysis Of The Impact Of Longwall Panel Width On Methane Emissions And Performance Of Gob Gas VentholesBy C. O. Karacan, S. J. Schatzel, W. P. Diamond
In coal mining, longwall mining is a preferred method to maximize production by extracting large blocks of coal that have been outlined with a set of development entries. In U.S. mines, longwall pane
-
Utilizing Strain Criteria to Predict Highwall Stability PerformanceBy H. Warren Newcomen
Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents
May 1, 2004
-
Analysis Of Nonstandard Noise Dosimeter Microphone PositionsBy Efrem R. Reeves, David C. Byrne
This study was conducted as part of a project involving the evaluation of a new type of noise exposure monitoring paradigm. Laboratory tests were conducted to assess how “nonstandard” dosimeter microp
-
Tubex-Grout-Injected-Piles For The Parenco Paper Mill In Renkum (The Netherlands) - The Application Of Tubex-Groutinjection-Piles For The Parenco Paper Mill PM-1 In Renkum (The Netherlands)By Sikko Doornbos
For the extension of the Paper Mill of Parenco in Renkum, the Netherlands, the application of a pile foundation was required. The demands for this pile foundation were very explicit a vibration free a
Jan 1, 1987
-
Sistema de control maestro para sopladores en paraleloBy Richard Manrique
"La implementación del proyecto de modernización de la fundición de cobre de Southern Peru Copper Corporation requiere cambiar la metodología de funcionamiento de los sopladores para la etapa de conve
Sep 19, 2006
-
Design and Construction of the DLR Extension to Woolwich Arsenal, London, UKBy Andy Alder
The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t
Jan 1, 2008
-
Geochemistry of ilmenite and applications to ilmenite provenance and Ti-mineral explorationBy Antonio Pineda, Roger K. McLimans, Felicity E. Lloyd
lmenite is a primary ore feed to the DuPont chloride process for the manufacture of titanium diox-ide pigment. We seek to determine ilmenite geochemistry as a function of original source and as-certai
Jan 1, 2005
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? SummaryBy Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Selection & Design Of Augered Cast-In-Place (ACIP) PilesBy Dan A. Brown
Outline ? Basic Concept of ACIP Piles ? Factors Affecting ACIP Pile Performance ? Applications: - Favorable Conditions - Unfavorable Conditions ? Design for Axial Loading ? Lateral Loa
Jan 1, 2004
-
The DC WASA Anacostia River CSO Control Tunnel ProjectBy David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri
On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo
Jan 1, 2007
-
Trends In Deep Foundations In Europe ? SynopsisBy R. Stenne
This paper presents the trends in deep foundations in Europe, both in terms of design and construction. Eurocode 7 which is a design code for geotechnical engineering will be introduced in the Eur
Jan 1, 2000
-
Report on the New Risk Criteria Proposed by the RCC Risk CommitteeBy Tom Pfitzer, Alice Correa, Meredith Hardwick
The past decade has brought significant changes in the use of risk-based criteria for safety within the U.S. Department of Defense. The Range Commanders Council (RCC) chartered a working group to deve
Jan 1, 2007
-
Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode IslandBy Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert
Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his
Jan 1, 2007
-
Construction Productivity Advancement Research Program (CPAR)By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope StabilizationBy Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding TechnologyBy Lyne Côté, Jose Adante
"The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n
Jan 1, 2009
-
Stanford LCLS Project - Detailed Construction Design for the Intersection Between Access Tunnel and FEH CavernBy Heiner J. Sander
Stanford University operates the National Research Facility which is located at the Stanford Linear Accelerator Center (SLAC) in Menlo Park, California. In order to improve and allow for enhanced expe
Jan 1, 2008
-
Optimization Of A Grinding And Classification Circuit Of A Magnetite Ore Processing Plant Through Computer SimulationBy J. A. Delgadillo
Computer simulation and mineral modeling was applied to the optimization of a grinding circuit in a plant processing 256 t/h magnetite. These tools were used to develop a grinding and classification c
Jan 1, 2008
-
Information Strategy Planning on Nuclear Power Plant Project Management SystemBy Son Hye Jin
Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the
Aug 1, 2013
-
The Construction and Testing of a Polycarbonate Safe Haven WallBy Braden T. Lusk, Rex A. Meyr, Kyle A. Perry
Following three major mining accidents in 2006, the MINER Act of 2006 was enacted by MSHA and required every underground coal mine to install refuge alternatives to help prevent future fatalities of t
Jan 1, 2014