Porphyry Type Gold Mineralization in Shoshonite at Vunda, FijiDisseminated gold mineralization in the Vunda River area 12 km SE of Lautoka in Viti Levu occurs sporadically in shoshonite volcanics within an alteration area of some 6 km2. No definite intrusions ha
Jan 1, 1978
-
Stripping of the Southern Exhaust Airway at Mount LyellIn the latter half of 1973 a contract was given to Roberts-Holland Joint Venture for the stripping of the southern exhaust airway.The contract was carried out efficiently and relatively cheaply. It wa
Jan 1, 1974
-
Long-Term Trends in Copper PricesBy John E. Tilton
Real copper prices during the past several decades display two striking characteristics. First, they are highly volatile. Within a year or two, copper prices can rise or fall by 30% or more. Second
Jan 1, 2002
-
The Determination of Certain Curves and Their Application to the Desilverisation of Lead by the Parkes ProcessWHILE in the employ of the Broken Hill Associated Smelters and the Electrolytic Zinc Oompanies at their South Melbourne Research Station, the writer was detailed to investigate the principles underlyi
Jan 1, 1925
-
Papers - Beneficiation of Iron Ore (Round Table)Large deposits of manganiferous iron ores, representing several million tons of metallic manganese, occur in the United States. The Minnesota deposits of such ore are of outstanding importance because
Jan 1, 1930
-
Underpinning Support Pipeline Compressor Station Founded On Timber Piles Potter, Ontario - DFI Conference, Toronto, Oct 1997 - Underpinning Support - Pipeline Compressor Station - BackgroundBy Brian Isherwood
TransCanada Pipelines, Calgary (TCPL) is one of North America's leading transporters of natural gas through its energy transmission business. TransCanada also operates significant complementary b
Jan 1, 1997
-
Institute of Metals Division - Metal Crystal Orientation Using the Polarizing Microscope (TN)By H. D. Mellom
The direction of the optic or "C" axis of a uniaxial metal crystal can be found with the metallurgical polarizing microscope by examining two planes of section on the crystal. Complete orientation of
Jan 1, 1962
-
Creative Tension: Environmental Issues and Resource DevelopmentAll development proposals have to run the gauntlet of the approvals process. Major resource projects are generally subject to particularly intense scrutiny. The key element in the approvals process
Jan 1, 1992
-
Novel Technology for Treatment of Acidic Wastewater Containing Mercury in Zinc Smelter by BiologicsBy Qingwei Wang
This study focused on acidic wastewater from producing sulfuric acid system in zinc smelter containing mercury 21.48mg/L, zinc 55.85mg/L, lead 38.50mg/L, copper 1.68mg/L, cadmium 10.25mg/L, As 29.86mg
Jan 1, 2009
-
Institute of Metals Division - Discussion of An Empirical Relation Defining the Stress Dependence of Minimum Creep Rate in MetalsBy James C. M. Li, J. Weertman
James C. M. Li (United States Steel Covp.)—The author has discovered a single analytical relation between the minimum, or the steady-state, creep rate and the applied stress confirming a statement mad
Jan 1, 1963
-
Transformation Mechanisms Of Self Reducing – Fluxing Dried Greenballs Into Pig Iron NuggetsBy B. Anameric, S. Kawatra
Pig iron nuggets, which have similar chemical and physical properties with blast furnace pig iron, were produced by a single step heat treatment of self reducing – fluxing dried greenballs. During thi
Jan 1, 2007
-
Ground Control Monitoring System In Leeville Underground Mine - Preprint 09-063By C. Sun
The Leeville underground mine has been in operation since 2006 and currently produces 3,200 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f
Jan 1, 2009
-
Portland, Oregon’s Alternative Contract Approach—A Final SummaryBy Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald
Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20
Jan 1, 2007
-
Assessment Of The Pathogenic Potential Of Asbestiform Vs. Nonasbestiform Particulates (Cleavage Fragments) In In Vitro (Cell Or Organ Culture) Models And BioassaysBy Brooke T. Mossman
Asbestos fibers are highly fibrous silicate fibers that are distinguished by having a large aspect (length to diameter) ratio and are crystallized in an asbestiform habit that causes them to separate
Jan 1, 2007
-
Dimensioning of Tunnels in Swelling RockBy P. Wittke-Gatterman
ABSTRACT: A three dimensional constitutive law for swelling rock is presented. It can be applied to the osmotic swelling of mudstone as well as to the swelling of rocks containing anhydrite. It descri
Jan 1, 2003
-
The Karangahake Gold-Silver DepositThe Karangahake gold-silver deposit is located 11 km west of Waihi in the southern part of the Hauraki Goldfield. Historically it was the second largest bullion producer in the goldfield with a past p
Jan 1, 1987
-
Study On Application Of Fire Suppression Techniques Under Dynamic Fire ConditionsBy R. P. Singh
A mine fire model gallery has been designed and constructed on the premises of the Central Mining Research Institute, Dhanbad, India to perform systematic in-depth studies on various aspects of mine f
Jan 1, 2004
-
Background Geochemistry Downstream from Mines: USA Case Studies and NZ SignificanceBackground geochemistry of streams in mineralised terranes is affected by (a) natural sulphide oxidation and associated metallic discharges; and (b) previous mining history and associated discharges.
Jan 1, 1999
-
Comparative Studies on Balls Versus Spheroidal Tetrahedrons Working Media to Ore Grinding in an Industrial Drum MillComparative Studies on Balls Versus Spheroidal Tetrahedrons Working Media to Ore Grinding in an Industrial Drum Mill
Sep 13, 2010
-
Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.By Grigor Mishev, Georgi Petrov, Benjamin Cebrian
Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra
Jan 1, 2016