Search Documents

  • NIOSH
    IC 8080 Progress In Controlling Acid Mine Water: A Literature Review ? Introduction And Summary

    By Walter C. Lorenz

    In connection with its renewed study seeking solutions to problems created by release of acid water from bituminous coal mines, the Bureau of Mines recently surveyed reports already written on the sub

    Jan 1, 1962

  • AUSIMM
    Recovery of Sulphur from Smelter Gases at Kalgoorlie

    Some design and feasibility studies have been made into possible methods of economic recovery of sulphur from smelter gases emitted at Western Mining Corporation's Nickel smelter at KalgoorIie in

    Jan 1, 1983

  • NIOSH
    OFR-87-76 Logistic Performance Of Continuous Miners

    By Leslie D. Marrus

    This project and final report represent an effort to collect, analyze, and verify reliability and performance data on currently available medium -to-high seam models of continuous miners being used in

    Jan 1, 1976

  • ISEE
    Blasting Bridges and Culverts in Fish Streams: Water Overpressure and Vibration Analysis

    By Kristen Dunlap

    There are several thousand remote stream crossing structures in the Tongass National Forest in need of removal. In 2007 thirty-three collapsing log bridges, log culverts, and metal culverts no longer

    Jan 1, 2009

  • DFI
    Emplacement Techniques: Impervious And Pervious Wall Construction ? Summary

    By Fred C. Schmednecht

    For years, the strategy was to contain waste and in many applications, is still the recommended method. Recently, it has become acceptable to create filters below ground for the in-situ treatment of w

    Jan 1, 1999

  • DFI
    Overview Of Earth Retaining Systems And Their Selection

    By Raymond J. Castelli

    The paper provides a general overview of the numerous types of earth retaining systems currently available, and organizes these various systems by several classification methods. These classifications

    Jan 1, 2003

  • SME
    Urban Tunneling Technology - European Experiences

    By Erich J. Jacob

    In the past 15 years the enforced improvement of the public traffic systems caused a boom in urban tunnel construction. In 1961 the City of Paris started to build the Express-Metro. Of the 47 km long

    Jan 1, 1976

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • ISEE
    Alternative Velocity Loading Techniques and Detonations in a Production Environment

    A simple and cost effective technique to increase fragmentation and burden velocities without making major modification to the overall blast design is with ALTERNATE VELOCITY LOADING OR BOOSTERING OF

    Jan 1, 1989

  • DFI
    Research Advances In Barrettes: Installation Effects And Load-Carrying Behaviour

    By Guo H. Lei

    Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro

    Jan 1, 2006

  • SME
    Landslides, Drought, And Brown Trout In The Red River, NM

    By D. Conklin

    Annual fish monitoring of the Red River, NM from the town of Red River to downstream of Questa, NM has been conducted since 1997. This long-term dataset, sponsored by the Chevron Mining Inc. Questa M

    Jan 1, 2011

  • AUSIMM
    Establishing a Mining Education Programme in Papua New Guinea

    The paper presents a brief history of endeavours to start a mining education programme which began in the days when Papua New Guinea's first large mine, at Panguna (Bougainville), was coming

    Jan 1, 1991

  • SME
    Liberation-Limited Grade/Recovery Curves From X-Ray Micro Ct Analysis Of Feed Material For The Evaluation Of Separation Efficiency - Preprint 09-025

    By J. D. Miller

    Characterization of feed material with respect to expected concentrate grade and recovery is fundamental to the design of improved separation efficiencies and to achieve sustainable development in the

    Jan 1, 2009

  • CIM
    The Aurora Super Pump – Part II: Field Performance of a New Hydrotransport Pump

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The hydrotransport systems at Aurora experience high rates of wear,

    Jan 1, 2014

  • SME
    MinExpo 2008: The Biggest Ever

    From the massive equipment that moves the earth, to the parts that keep the equipment moving, it was all on display for more than 35,000 people who at-tended MinExpo 2008 at the Las Vegas Convention C

    Jan 1, 2008

  • NIOSH
    RI 5966 Fluorescent X-Ray Spectrography: Determination Of Trace Elements ? Introduction And Summary

    By William J. Campbell

    The purpose of this investigation was to extend the analytical services which are required for Bureau of Mines programs in developing and evaluating high-purity materials. Determination of trace eleme

    Jan 1, 1962

  • SME
    Limestone Mining – Is It Noisy Or Not? (a6f0b5ad-a610-4972-afd6-68c53ccd734c)

    By D. R. Babich, E. R. Bauer

    National Institute for Occupational Safety and Health (NIOSH) researchers are conducting a cross-sectional survey of equipment noise and worker noise exposures in the mining industry. Surface and und

    Jan 1, 2006

  • NIOSH
    OFR-149-84 Development And Validation Of A Training Program For Operators Of Noncoal Equipment - Volume I. Final Report

    This report describes the development of training materials for the operators of underground mining equipment in the underground metal and nonmetal mining industry. The objective was to determine the

    Jan 1, 1984

  • DFI
    Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting

    By David Preece

    The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem

    Jan 1, 2011

  • AUSIMM
    Investigating the Sensitivity of Different Estimation Techniques over Block Dimensions

    It cannot be said that accurate and reliable ore reserve estimation is the fundamental of any mining operation success. Estimation techniques which are used to estimate the grade distribution of an or

    Dec 6, 2010