Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Influence Of The Reduction Conditions On The Expansion And Microtexture Of Sintered Hematite Compacts During The Transition To MagnetiteBy W. M. Husslage
The permeability in the blast furnace shaft is adversely affected by low temperature reduction degradation of sinters. The fundamental cause is an expansion of the iron oxide phase resulting from redu
Jan 1, 1998
-
Mechanical Versus Manual Shotcrete Application in Underground Construction - RETC2021By Lauro Lacerda
Shotcrete is a highly adaptable and widely used underground construction material at infrastructure and mining projects around the world. In fact, many projects could not have been completed without i
Jun 13, 2021
-
Direct upscaling of semivariograms and cross semivariograms for scaleconsistent geomodeling - SME Transactions 2013By O. Babak, O. Leuangthong, M. A. Cuba
Integration of data from multiple sources and/or multiple scales is a common, yet challenging aspect of geostatistical resource modeling. Common approaches to data integration are based on a cokriging
Jan 1, 2013
-
Conveyors - Boddington Gold Mine?s Expansion Project Includes Overland ConveyorBy Todd Hollingsworth
The Boddington gold mine is located near Perth in Western Australia in the Saddleback Greenstone Belt, a fault-bounded sliver of Archaean volcanic and shallow level intrusive rocks, surrounded by gran
Jan 1, 2010
-
Effect of Alkali‑Activated Slag and Phosphogypsum Binder on the Strength and Workability of Cemented Paste Backfill and Its Environmental Impact - Mining, Metallurgy & Exploration (2023)By Shenghua Yin, Xun Chen, Rongfu Yan, Zepeng Yan, Wei Chen
The application of cemented paste backfill (CPB) with alkali-activated slag and phosphogypsum (ASP) can contribute to the sustainable development of the mining industry. The effects of PG content, NaO
Nov 17, 2023
-
Construction And Operation Of An Innovative Long Distance Conveying System At Twin ButtesBy F. Brost
In 1976, a decision was made to install a conveying system to transport ore 10.3 km (6.4 miles) from the new Eisenhower Partnership Mine to Twin Buttes. The system, supplied and installed by Cable Bel
Jan 1, 1979
-
Calcium Lignosulfonate as a Depressant for Enhancing Flotation Separation of Covellite and Enargite - Mining, Metallurgy & Exploration (2024)By Quanjun Liu, Rongping Lin, Rongdong Deng
Arsenic contamination significantly affects the quality of copper concentrates, presenting challenges during smelting processes. Considering that covellite and enargite have similar surface properties
Feb 28, 2024
-
Florida: The New Uranium ProducerBy John W. Sweeney
Florida is usually thought of as a vacation State, not a mining State, yet Florida has been the leading producer of phosphate rock in the United States for 85 consecutive years and in 1978 supplied ov
Jan 1, 1979
-
World’s largest live tunnel connection at TARP McCook TunnelBy Faruk Oksuz, Dave Schiemann, Matt Trotter, Mike Padilla, Carmen Scalise, Miquel Sanchez
"The McCook Main Tunnel system consists of a 10-m (33-ft) finished diameter, 490-m (1,600-ft) long, hard rock tunnel constructed from a 27.5-m (90- ft) diameter and 92-m (300-ft) deep main gate and tu
Sep 1, 2016
-
Single Fracture Of Brittle SpheresBy N. Arbiter
Fracture under low velocity free-fall and double impact, and under slow compression have been-investigated. The pattern of breakage and the size distribution of resulting fragments for sand-cement and
Jan 1, 1968
-
A Study on the Impact of In-Seam Rock Partings on Coal Pillar Strength Based on Field Instrumentation and Numerical Modeling at the Maple Eagle Mine - SME Annual Meeting 2024By Morgan M. Sears, Mark Morris, Joseph Bright
In an effort to advance the science underlying modern coal pillar stability analysis, researchers at the National Institute for Occupational Safety and Health are currently involved in research aimed
Feb 1, 2024
-
Incremental Expansion Of Mt. Newman Iron Ore TerminalBy Roger L. Hulette
Mt. Newman Mining Co. is now completing an expansion program, begun even before initial construction was complete, which will result in facilities with the ability to ship over 30 million tons of iron
Jan 1, 1972
-
The Modeling and Optimization of Iron Removal from Silica Sand Under Ultrasound‑Assisted Leaching by Response Surface - Mining, Metallurgy & Exploration (2021) MethodologyBy Volkan Arslan
This study aimed to remove the contaminants in quartz sand by using an eco-friendly method and to obtain high-purity quartz. For this purpose, ultrasound-assisted acid leaching was applied. Equal amou
Jul 12, 2021
-
About Face: How A Mine Moved Toward Operating In MaineBy Thomas R. Doyle
When you think of the state of Maine, you probably think of lobsters or lighthouses. The last thing you would think of is metallic mineral mining, and that is for good reason. According to the Maine G
Jan 1, 2012
-
Energy‑Size Reduction of Magnetite‑Calcite Binary Mixture in a Laboratory Wet Conical Ball MillBy Caibin Wu, Bin Xie, Jiaqi Tong, Ningning Liao, Chong Zeng
Understanding the energy-size reduction relationship is vital to grinding process; therefore, this paper aims to show the energy-size reduction of magnetite-calcite binary mixture in a laboratory wet
Jun 4, 2022
-
Overview of the Design of the Beacon Hill Station and TunnelsBy Don Phelps, Christopher Tattersall, David McAllister
Located south of downtown Seattle, the Beacon Hill Station & Tunnels is the key section of the southern segment of Sound Transit’s proposed new LINK light rail system. This paper presents an overview
Jan 1, 2003
-
Creep Damage Model for Rockburst at Mufulira Mine in Zambia (Mining, Metallurgy & Exploration)By Y. FUJII, E. CHANDA, J. KODAMA, D. FUKUDA, M. NISHIHARA, Y. NAKAYAMA, P. SINKALA
For over 40 years, Mufulira underground copper mine has been recording incidents of rockburst. Laboratory tests and numerical analyses were carried out to understand the rockburst mechanism at the Muf
Aug 12, 2022
-
Pressure leaching of copper concentrates at Morenci, Arizona – 10 years of experience Mining, Metallurgy & Exploration (2018)By J. O. Marsden, C. Green
In 2003, a high-temperature pressure leaching circuit to treat copper sulfide concentrates was commissioned at the copper/molybdenum operation at Bagdad, AZ. In late 2007, a medium-temperature pressur
-
Multiple-Criteria Cut-Off Grade Optimization Utilizing Excel SolverBy Clinton Birch
The multiple-criteria decision analysis is a technique that helps to find an optimal solution by evaluating conflicting criteria. In this study, an approach to perform multiple-criteria decision analy
Jun 25, 2023
-
Financing Options For Small Mines—what We Learned In Our Senior Design Project - SME Annual Meeting 2022By G. V. Campbell, O. T. Holdsworth, M. G. Nelson
A senior design project is required by all accredited mining engineering degree programs. Often referred to as the capstone of a student’s education, this project is expected to include all the import
Mar 2, 2022