Comparison of Static Lateral Behavior of Vertical and Battered Pile Groups of the I-10 Twin Span Bridge Using Finite Element SimulationBy Ahmad F. Souri, Murad Abu-Farsakh
"In this study, the static lateral resistance of vertical and battered pile groups was analyzed using 3D finite element analysis. The battered pile group finite element model was verified using the re
Jan 1, 2017
-
Machine Foundation RepairBy Scott D. Thomson
The client for this project specializes in the use of state-of-the-art technology to fabricate and assemble composites and metal-bonded structures for commercial and military aircraft programs. One of
Jan 1, 2003
-
Estimation of Shaft and Base Responses from Pile Load TestBy Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran
"Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc
Jan 1, 2017
-
Soil Grouting to Arrest Foundation SettlementBy Anuj K. Singh, Shuvranshu Rout, Manos De
"Foundation for tracks of coke transfer car and dust extraction pipe was designed as series of isolated foundations spaced at 11.0m along length of coke oven battery resting on soil at depth of 2.5m.
Jan 1, 2017
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, PennsylvaniaBy Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay SoilBy W. Tom Witherspoon
Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric
Jan 1, 2009
-
Behavior Of Step Tapered Bored Piles In Sand Under Axial LoadingBy Nabil F. Ismael
The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al
Jan 1, 2008
-
Resonant Driving of Sheet Piles: High Production Sheet Pile Driving With Zero Ground VibrationBy Mathew Janes
"Sheet piles remain an economic solution to many shoring problems. However, installation of sheet piling suffers high noise and vibration with conventional impact or vibratory methods or low productio
Jan 1, 2014
-
Resonance Test On Piles - SynopsisBy Y. Z. Xu
This paper presents a new dynamic method called Resonant Pile Test (HPT) for evaluating bearing capacity of pile. The basic conception of RPT is given in brief and the measuring system is also introdu
Jan 1, 2010
-
Cyclic Degradation Of Pile Foundations For Offshore Wind TurbinesBy Fabian Kirsch
Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load
Jan 1, 2011
-
Static Uplift and Lateral Load Testing of Piles for a New Power PlantBy José L. M. Clemente, John R. Davie
"Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi
Jan 1, 2014
-
Self Drilling Soil Nail Systems To Retain Caving SoilsBy Ali Porbaha
The use of soil nailing technology as a cost effective alternative for excavation support and slope stabilization has substantially increased in the United States during the last decade. For example,
Jan 1, 2006
-
Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall PanelsThere are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration
Jan 1, 2005
-
Underpinning Of Buildings During Tunneling Los Angeles Metro Rail System - SynopsisBy John A. Dal Pino
This paper describes two independent building underpinning projects during the construction of the Los Angeles Metro Rail System. The first project involves pinpile underpinning of a building along th
Jan 1, 1996
-
Piled Foundation Design as Reflected In Codes and StandardsBy Bengt H. Fellenius
"ABSTRACTAn example from a guidelines document for the Eurocode is discussed that addresses design for geotechnical strength of piled foundations in settling soil, generating drag force and downdrag.
Jan 1, 2014
-
An Unusual Permanent Shoring JobBy Gordon Demetrick
3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi
Jan 1, 1987
-
Standardizations of Execution and Quality Control on Piling and Deep Mixing MethodBy Masaki Kitazume, Yoshiaki Kikuchi
"Abstract Pile foundation is one of fundamental techniques to improve the bearing capacity and settlement characteristics of superstructures. Wide varieties of piles having various shape, size and mat
Jan 1, 2014
-
Stub Pier Stabilization PerformanceBy Swaminathan Srinivasan, Jess A. Schroeder
"Landslide activity along U.S. 50 in Cincinnati, Ohio (USA) has caused roadway damage for decades. After a necessary closure of three lanes due to slope movements, emergency stabilization measures wer
Jan 1, 2017
-
Drilled Piers With Base Preloading By Grouting - 1. IntroductionBy Boleslaw A. Klosinski
Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile