The Quality Control Of Pile Foundations Of Tall Buildings In ShenzhenBy Li Keqiang
Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on
Jan 1, 1991
-
The Merits Of Polymeric Fluids As Support SlurriesBy J. J. Beresford
The primary function of a support slurry is to provide stability during excavation. Today foundation structures can be designed around the additional friction afforded by the absence of the filter cak
Jan 1, 1989
-
Assessment Of The Risk Of Pile Driving To Juvenile Fish - The ProblemBy James J. Anderson
In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th
Jan 1, 1990
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - SynopsisBy Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Deep Jet Grouting Grids for Support of a 42-Story Tower Designed Using Performance-Based Seismic DesignBy Scott A. Walker, Roberto A. Lopez, Lori A. Simpson, David A. Shook
500 Folsom Street is part of the new Transbay neighborhood in San Francisco, which is being redeveloped after the 1989 Loma Prieta Earthquake damaged a freeway viaduct; removal of the viaduct created
Jan 1, 2018
-
Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in BratislavaBy J. Stacho, Frankovská. J.
"Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on
Jan 1, 2014
-
Threading Piles Past Underground Assets In Central LondonBy Alexander Nikolic
The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra
Jan 1, 2011
-
Practical Aspects Of Compensation Grouting ? SynopsisBy Philip J. H. Ball
The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial
Jan 1, 2000
-
Oakland Airport Roadway Project - SynopsisBy David S. Yang
The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc
Jan 1, 2001
-
Frequency-Variable Vibrators And Their Application To Foundation Engineering - 1 IntroductionBy K. Rainer Massarsch
In some parts of the world, vibrators are used extensively for different types of foundation engineering projects. If used correctly and in suitable soils then vibratory pile driving for example is ve
Jan 1, 1995
-
Effect Of Installation On Quality Of Deep Mixed Soil Cement ColumnsBy Ali Porbaha
Rapid growth in the urban development requires continuous search for innovative technologies to construct complex infrastructure systems. Deep mixing is one promising construction technology that has
Jan 1, 2001
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part OneBy Christian Divis
[ ]
Jan 1, 2002
-
High-Strain Dynamic Testing Of Drilled Shafts And Cast-In-Place PilesBy Garland E. Likins
High-strain dynamic testing of drilled shafts and cast-in-place piles has become routine procedure in many parts of the world today. Field testing is performed by measuring strain and acceleration rec
Jan 1, 1995
-
-
Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON ProjectBy Elizabeth M. Smith
The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss
Jan 1, 2009
-
Suction Piles And Suction Anchors For Offshore StructuresBy S. Bang
In recent years, suction piles and suction anchors have been used as underwater foundations for various offshore structures. They have been proven very versatile, effective, and environmentally frien
Jan 1, 2009
-
Specialized Slurry Wall Equipment - The Hydromill - SummaryBy Mario Mauro
The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l
Jan 1, 1994
-
Macropiles: Ultra-High-Capacity Micropiles For Foundation SupportBy John R. Wolosick
MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr
Jan 1, 2006
-
New York City - A Review Of Various Foundation Problems And Solutions - SynopsisBy Mel Febesh
Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and
Jan 1, 2000