Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design of steel arch supports for gate roadways

    By Pierre Choquet

    "The whole work carried out both in situ and in laboratory by a research group of the West German collieries is presented. This work has led to a design method of steel arch supports for gate roadways

    Jan 1, 1986

  • CIM
    Hydrostatic shoe bearing eliminates problems for large mills

    By Brian McIntrye, Bo Trygg

    "The need for grinding mills of ever increasing capacity and greater feed openings has tended toward mill trunnion diameters being beyond the size limits for roller bearings.Hydrodynamic plain bearing

    Jan 1, 1982

  • CIM
    Cage hoist automation for today double-drum winder

    By E. Henderson

    "This paper outlines the upgrading of a double-drum 2000 hp cage hoist to provide fully-automatic operation from shaft station control panels. The application utilizes programmable controller technolo

    Jan 1, 1989

  • CIM
    Pilot-Plant Facilities for Hydraulic Transport of Solids

    By L. G. Smith, C. A. Shook, W. H. W. Husband, W. Schriek

    "The flow of slurries in pipelines is governed by many variables, and the study of the influence of each of these variables is difficult, if not impossible, in some cases. Many correlations are availa

    Jan 1, 1973

  • CIM
    Employee assistance programs for hourly and salaried employees

    By K. MacMaster

    "This paper deals with the history, development, present and future of the Employee Assistance Programs in place at the Inco Ltd. operations in Thompson, Manitoba. It should be noted that, although ma

    Jan 1, 1989

  • CIM
    Lest we forget- a mineral policy for Canada

    By Robert B. Parsons

    "Next month will mark the anniversary of the release of an important federal study on a mineral policy for Canada. The study, entitled ""Mineral Policy-A Discussion Paper"", provides well-researched c

    Jan 1, 1983

  • CIM
    Geometallugical Design for a Large Copper-Molybdenum Concentrator

    By D. R. Hatton

    To obtain sufficient material on which to perform copper-molybdenum separation testwork a variability set of drill hole reject samples amounting to several tons was put together to include the differe

    Jan 1, 2019

  • CIM
    A Zero - Waste Process for Copper Smelting Slags

    By J. Smit, F. Parada, R. Parra, E. Balladares, M. P. Merino

    "In this study, a two-step process was developed for recovering copper, molybdenum, zinc and iron (hematite). In the first step, grinded slags (-65 mesh) were sulphated with SO3 at 350-500ºC to form i

    Jan 1, 2014

  • CIM
    Hydrometallurgical Strategies for Higher Impurities in Copper Refining

    By C. Sist, J. Shannon, J. Fossenier, J. F. Adams

    With the cleanest and easiest to treat copper concentrates dwindling and becoming harder to find, electrorefineries must deal with the reality of higher impurity anodes. There are well-known strategie

    Jan 1, 2019

  • CIM
    Simply Empowering: Innovative Software Tools for the Miner

    By J. H. Curran

    Agenda ? Challenges of developed world mining ? Software aids for creative and practical engineering ? Rocscience software philosophy ? Rocscience suite of geomechanics programs ? Case study ? d

    Apr 1, 2005

  • CIM
    Failure mechanics and design considerations for footwall slopes

    By D. C. Martin, P. M. Hawley, C. P. Acott

    "In bedded deposits such as coal or sedimentary iron, economic limits of mineable reserves are clearly defined by the footwall of the seams or ore-bearing units. Where open pits are developed in dippi

    Jan 1, 1986

  • CIM
    Advances in the Use of Polytetrafluoroethylene during Medium Temperature Pressure Oxidation of Chalcopyrite

    "Previous studies on the effect of polytetrafluoroethylene addition during chalcopyrite leaching under conditions similar to those of the CESL process have reportedly resulted in complete leaching of

    Jan 1, 2012

  • CIM
    Quantitative Methods for Copper Smelter Re-Engineering Projects

    By A. Navarra, Norman Toro, T. Marín, Fernando Ayala

    The quantitative techniques to evaluate the enhancement of a particular unit operation should consider the corresponding changes to the adjacent unit operations. For example, the expansion of off gas

    Jan 1, 2019

  • CIM
    A Chemo-Physical Model for Predicting Post-Fracking Pressure Build-up in Pierre Shale

    By A. Hayatdavoudi, K. G. Sawant, F. Boukadi

    "In this work, we found that contact between shale and water results in development of micro fractures. Based on results of experiments on Pierre shale, we conclude that appearance of micro fractures

    Jan 1, 2015

  • CIM
    Aspects of Plasticity and Fracture under Bending in Al Alloys

    By D. J. Lloyd

    "Bending is involved in the forming of many sheet parts and it is important to understand the phenomena involved. In this paper the basic equations describing bending on a global scale are compared wi

    Jan 1, 2018

  • CIM
    Bio-Inspired Burrowing Mechanism for Underground Locomotion Control

    By S. M. Moon

    Today, underground exploration is spotlighted as an infinitely developable area. For this purpose, many tunneling technologies were created. And until this very day, many techniques are being develope

    Aug 1, 2013

  • CIM
    The Role of the Center for Science in Public Participation in Mining Environmental Issues, with Perspective for Regulators and Industry

    By James R. Kuipers

    Center for Science in Public Participation CSP2 ? Organized in 1997 to provide technical assistance to public interest groups on mining and water quality issues ? 80%of effort devoted to direct su

    May 1, 2002

  • CIM
    Mesoscopic Structure Reconfiguration of Soil and Numerical Simulation of its Seepage Field

    By Lin-fang Shen, Shao-jun Li, Zhi-liang Wang

    "The meso-structure of real soil consists of numerous particles with different sizes, while the traditional reconstruction method of quartet structure generation set (QSGS) produce relatively uniform

    Jan 1, 2015

  • CIM
    Guidelines for the Reporting of Diamond Exploration Results

    The following guidelines have been recommended by the Diamond Exploration Best Practices Committee established by the Canadian Institute of Mining, Metallurgy and Petroleum. These guidelines are appli

    May 1, 2003

  • CIM
    Evaluation of Artificial Intelligence for Improved Plant Operation

    By Alain Tshilombo, Vijay Reddy, Chowdary Meenavilli, Kelvin Buban, Cory Kosinski, Sriraj Meenavilli, Siddhartha Tirumalaraju

    The use of artificial intelligence (AI) for process optimization is expected to play an increasingly important role in the future of the mining industry. The objective of AI is to develop a data drive

    Jan 1, 2019