Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Enhancing the Collection of Rock Mass Fabric Data for Open Pit Mines

    By C. Poon

    For slope stability, knowledge of major and minor discontinuity sets that form the rock mass fabric is paramount for pit slope designs. Due to the increased awareness of health and safety in mining pr

    May 1, 2009

  • CIM
    Uranium in Niger

    By Philippe Portella

    Current Ownership : AREVA NC-France & affiliates (63.4%), ONAREM-Niger (36.6%)Related Mines : Ariège, Artois, Arlette(initial Somaïrlease) and Tamou, Taza, Takriza, Tamgak(SMTT lease)Mining Method : O

    May 1, 2006

  • CIM
    Effect of Temperature on Kinetic Properties of the Fe (II)/Fe (III) Redox Couple on the Surface of Pyrite

    By Ahmad Ghahreman, Lin Li

    "In this study, the Fe(II)/Fe(III) redox reaction kinetics on the surface of pyrite, have been investigated in a 0.5 mol L-1 sulfuric acid solution for a temperature range of 22 to 65°C. Based on mixe

    Jan 1, 2017

  • CIM
    Evaluation of Secondary Crushing Prior to SAG Milling at Newmont?s Phoenix Operation

    By G. M. Castillo

    Newmont?s Phoenix mine started production in March of 2006. Due to the extreme hardness of the ore, the mill has struggled to meet throughput projections. Grinding studies showed that optimizing the e

    Jan 1, 2012

  • CIM
    SABC Circuit Operations at Eldorado?s Jinfeng Gold Mine

    By Yan Yang

    The Jinfeng gold mine is one of the three gold mines that Eldorado Gold has in China and it is the second largest gold mine in China. The mine is located in a relatively remote and mountainous area in

    Jan 1, 2012

  • CIM
    Aerosol frother addition in column flotation

    By P. MacPhail, G. S. Dobby, I. M. Flint

    "The objective of the laboratory work described in this paper has been to develop a method f or producing small gas bubbles at moderate to high gas rates in a flotation column. Small bubbles are parti

    Jan 1, 1988

  • CIM
    Coupled Atomistic/Continuum Discrete Dislocation Modeling of Nanoscratching

    By W. Beres, R. E. Miller, B. Shiari, L. R. Zhao

    A dynamic multiscale simulation method has been developed to study the material scratching processes on nanoscale single crystals. The model simultaneously captures the atomistic mechanisms near the f

    Jan 1, 2006

  • CIM
    Electrorefining High Level Arsenic Cast Anode

    By . A. C. Atenas

    Control of arsenic in the Potrerillos' Refinery electrolyte has been obtained by withdrawing a bleed stream of circulating electrolyte and ensuring the ratio of [O]/[As] in the cast anodes is mai

    Jan 1, 2007

  • CIM
    Managing Assets Using Performance Supervision

    By M. Ruel

    In today's highly competitive worldwide market, it is becoming extremely important for managers to make sure that all resources are used where needed the most. That way, all resources are generat

    Jan 1, 2007

  • CIM
    Novel Metallographic Techniques, Particularly as Applied to the Study of Aluminum

    By C. A. Godden, T. N. Atkinson

    Metallographic techniques developed from studies of corrosion films and electroplated coatings on aluminum alloys, are discussed. These methods, the result of work at the Naval Research Establishment,

    Jan 1, 1962

  • CIM
    Boiler Waters in Cape Breton Colliery District-A Progress Report

    By J. L. Bowlby

    TWO years ago, at the annual meeting of this Society, the writer presented a paper dealing with various aspects of the water problems existing in the Cape Breton coal-mining area. Much of that paper w

    Jan 1, 1936

  • CIM
    Optimizing Stope Sequence in a Diminishing Ore Pillar: A Case Study

    By Shahé Shnorhokian

    Numerical modeling is increasingly being used as a tool to examine complex geomechanical issues related to rockmass behaviour and stability of underground openings. The in-situ stress regime and the e

    Aug 1, 2013

  • CIM
    Developing Copper Arsenic Resources with CESL Technology

    By V. Omaynikova, A. Lossin, H. Salomon-de-Friedberg

    In 2009, Aurubis AG and Teck Resources Limited, recognizing a growing industry need, joined together to advance and further develop technology to deal with arsenic-bearing copper concentrates in an ef

    Jan 1, 2014

  • CIM
    Investigation of Mineral Liberation by Transgranular and Intergranular Fracture after Milling

    By K. Bachmann, M. Rudolph, U. A. Peuker, H. H. Duong, T. Heinig, T. Leißner, H. Schubert, Helmholtz-Institute Freiberg for Resource Technology, Technische Universität Bergakademie Freiberg

    "Minerals can be liberated by random fracture of particles into smaller fragments or by detachment along phase boundaries. These two mechanisms represent borderline cases. When ores get comminuted the

    Jan 1, 2016

  • CIM
    Geology and Mineralization of the Kipawa Yttrium Zirconium Prospect, Quebec (4785c091-b1c1-4024-a67d-f6a21e92673b)

    By James F. Allan

    "The Kipawa yttrium-zirconium prospect is located about 150 km south of Noranda, Quebec. Yttrium-zirconium mineralization occurs in an elongate, regionally metamorphosed and deformed peralkaline compl

    Jan 1, 1992

  • CIM
    Optimization of a Tilt Poured Permanent Mold Casting via Solidification Modeling

    By Bernard Tougas, Franco Chiesa, David Levasseur, Bernard Duchesne

    "In the present paper, the optimization of a tilt poured permanent mold will be carried out using filling and solidification modeling. This exercise resulted in 3 modifications of the initial mold des

    Jan 1, 2014

  • CIM
    Effect of Static Precipitation on Microstructue and Texture of Warm Rolled Mg-Al-Sn Alloy

    By A. S. H. Kabir, I-H. Jung, J. Su, S. Yue, M. Sanjari

    The final mechanical properties of wrought magnesium alloys are mostly controlled by microstructure and crystallographic orientation or texture. In common magnesium alloys, grain coarsening occurs dur

    Jan 1, 2014

  • CIM
    Building Aboriginal Relationships to Achieve Project Success

    Presentation Overview ?? Project Setting ? Project Context ? Challenges ?? Managing Commitments ?? Project Update ?? Maximizing Aboriginal Economic Participation in Resource Development P

    May 1, 2004

  • CIM
    Crushing Plant Operation Review and Dust Collection Summary

    By G. P. Holmes

    "Bell Copper is situated (Latitude 55°0''N, Longitude 126°14W) on Newman Peninsula on the east side of Babine Lake at an altitude of 2,450 feet above sea level. The mine site is approximately 170 mile

    Jan 1, 1976

  • CIM
    Progress Report on Use of On-Stream X-ray Analyser at Mattagami Lake Mines Limited

    By K. V. Konigsmann

    "The mill at Mattagami Lake Mines treats 3,850 tons per day. The mill feed is a heavy sulphide ore. It is composed ofPyrite & Pyrrhotite - 40%Marmatite - 17%Chalcopyrite - 2%Magnetite - 10%Talc and ot

    Jan 1, 1969