Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Development and Commissioning of Ontario’s First Diamond Mine – The Victor Diamond MineBy Ian Holl, Adam Hempstock, Rickardo Welyhorsky, Niel Morrison
"The Victor Diamond Mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario and was completed appr
Jan 1, 2010
-
Caving at Johnson's Asbestos Mine Thetford Mines, QuebecBy The Staff
BEFORE going into detail on the subject to be presented, a brief outline of the Company's earl y history would not be out of place. Prospecting and mining on a small scale was started in 1876 on
Jan 1, 1941
-
The Power Vacuum: The Effect of the Electricity Power Crisis on GDP in South Africa in the Context of an Uncertain Coal SupplyBy F. Sorensen
ABSTRACT Electricity production by the Electricity Supply Commission of South Africa (Eskom) is the most important beneficiation process for South African coal. As one of the world’s lowest cost produ
Jan 1, 2011
-
An Approach to Energy Management at Falconbridge Nickel Mines LimitedBy D. M. Doyle
A study of the various components contributing to energy costs and their relationships to generally trended operating data, such as tonnage, operating costs, etc., over progressively shorter time peri
Jan 1, 1979
-
Understanding the Relationship: Bitumen Production and the Athabasca RiverOverview ?Oil Sands Background ?Water Use in Surface Mining ?Tailings Disposal ?Water Balance for Surface Mining ?Implications of Emerging Regulations ?Water Management Framework ?Tailings P
May 1, 2009
-
Metalliferous sub-marine sediments of the Atlantis-II-Deep, Red SeaBy Zuhair A. Nawab, Muhammad A. Al-Marhqun, Mehmet Guney
"The Atlantis-Il-Deep is a stratified metalliferous deposit located along the median valley of the Red Sea at a water depth of about 2200 m. The metal-bearing mud contains sulphides of zinc, copper an
Jan 1, 1988
-
A MultiGaussian Approach to Assess Block Grade UncertaintyBy Julián M. Ortiz
Uncertainty quantification of a spatially distributed variable at any scale can be handled through geostatistical simulation. Large computation time, storage, and post-processing of the realizations a
May 1, 2004
-
Evaluation of Ventilation On Demand (VOD) in Sudbury MinesBy G. Lyle
Since its inception CEMI (Centre for Excellence in Mining Innovation) has focused on facilitating innovative solutions to the mining industry in six strategic research areas; GeoRisk, ConstructMine, V
Oct 1, 2010
-
On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’By Phillip Cancilla, Daniel Roy, Frank Rosenblum
"The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti
Jan 1, 2001
-
A study of problems relating to mining engineering university educationBy C. Pelley, A. Piche
"The Canadian mining industry faces the prospects of a severe shortage of graduate mining engineers over the next decade. This arises from three factors: first, a growth in industrial activity; second
Jan 1, 1989
-
The Geological Setting, Mineralogy, and Paragenesis of Gold-Bearing Polymetallic (Cu+Co+Ag+Au+Bi±Pb±Ni±U) Veins of the Merico-Ethel Property, Elk Lake, Northeastern Ontario, CanadaBy I. Campbell, P. C. Jones, E. G. Potter, R. P. Taylor
"The Cobalt embayment is a large domain of Paleoproterozoic clastic sedimentary rocks that unconformably overlies the Archean Abitibi greenstone belt. Regionally extensive sills and dikes of Nipissing
Jan 1, 2009
-
A Comparison of the Energy Requirements of an HPGR / Stirred Mill Circuit and Conventional Grinding Circuits for the Comminution of Mesaba OreBy Steve Wilson, Bern Klein, Jeff Drozdiak, Stefan Nadolski, Andrew Bamber
"In the adaptation of high pressure grinding rolls (HPGRs) to hard-rock mining applications, circuit development has mainly focused on placing HPGRs in the role of tertiary crusher in the preparation
Jan 1, 2010
-
Commissioning of the BIOX and ASTER™ Processes at the Runruno Gold ProjectBy M. Savella
The Runruno Gold Project is located on the island of Luzon, approximately 200 km north of Manilla in the Philippines. The mine is a surface mine operation and use the proven BIOX® and carbon in leach
Jan 1, 2017
-
The Wellington Lake Power ProjectBy E. M. Stiles
THE Wellington Lake power plant of the Consolidated Mining and Smelting Company of Canada, Limited, about 25 miles from Goldfields, Saskatchewan, is the second hydro-electric project operating in that
Jan 1, 1940
-
Milling Circuit Control and Optimisation: The Millstar with IESBy J. R. Hart, V. C. Smith, V. P. Babarovich-Hansen, J. H. Schubert
"An introduction and case study of Mintek's latest generation of Milling Circuit controller, the MillStarTM with IES (Interpreting Expert System) is presented. This paper also describes as a case stud
Jan 1, 2000
-
Efficient Enhanced Gravity Separation Using the Kelsey Centrifugal JigBy Peter Barker, Terry Jones
"The Kelsey Centrifugal Jig (KCJ) utilizes the application of centrifugal force (and the resultant enhanced gravitational field) to conventional jigging technology principles to successfully and effic
Jan 1, 2007
-
The Tungsten-Bismuth-Molybdenum Deposit of Brunswick Tin Mines Limited: Its Mode of Occurrence, Mineralogy and Amenability to Mineral BeneficiationBy Wm Petruk
"The tungsten-bismuth-molybdenum deposit in southwestern New Brunswick occurs in greisenized and silicified tuffite * and feldspar porphyry in and adjacent to volcanic necks. The ore minerals occur as
Jan 1, 1973
-
Lead Flotation from Rod and Ball Mill Discharge at Nanisivik Mines LimitedBy J. Goyman, K. R. Rawling
"1.1 Location and Transportation ServicesNanisivik Mines Ltd. is located at latitude 73°, 3,200 km north of Montreal and 700 km north of the Arctic circle, on the south side of Strathcona Sound, which
Jan 1, 1984
-
Murrin Murrin CCD1 Rake Mechanism Modification the Decision and the Result (3e495dbc-2cca-4184-88b3-9cc5914b2481)By Brad Hewitt, Jeff Belke
"Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and op
Jan 1, 2005
-
Operation of La Mine Doyon"At a current mining rate of 3,750 tons per day, La Mine Doyon is currently the largest gold mine in Canada. La Mine Doyon is an open pit gold mine located in the Abitibi area of Northwestern Quebec.
Jan 1, 1984