    The Use of Computational Fluid Dynamics and Discrete Element Modeling to Understand the Effect of Cell Size and Inflow Rate on Flotation Bank Retention Time Distribution and Mechanism Performance

    By Richard Peaker, Jens Lichter, Alexander V. Potapov

    "The recent combination of Computational Fluid Dynamics (CFD) and Discrete Element Modeling (DEM) can provide considerable insight into the performance of flotation cells. One area of interest from a

    Jan 1, 2007

  • CIM
    Troubleshooting Flotation Cell Operation Using Gas Velocity Measurements

    By Donald Leroux, Ralph Dahlke, Dave Scott, Finch. James A., Cesar O. Gomez

    "The efficiency of the flotation process depends on how effectively air is dispersed into small bubbles. Bubble surface area flux - the surface area of bubbles per unit time per unit cross-section are

    Jan 1, 2001

  • CIM
    Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of Canada

    By Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie

    "A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im

    Jan 1, 2009

  • CIM
    The Present Situation in the Mining Industry of New Brunswick

    By W. J. Wright

    Summary This paper describes the general situation of the mining industry in New Brunswick, and gives a detailed description of the recent developments in the antimony deposits at Lake George and the

    Jan 1, 1931

  • CIM
    Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau

    "In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha

    Jan 1, 2008

  • CIM
    Chrome Grinding Balls at Campbell Mine

    By Bill Shand

    "Placer Dome - Campbell Mine is a gold mine located at Balmertown in the Red Lake District of North Western Ontario. During the last 50 years, the mine has produced over ten million ounces of gold.A c

    Jan 1, 2001

  • CIM
    Techno-economic evaluation of thiosalt treatment processes

    By K. G. Wheeland, J. E. Dutrizac, M. Wasserlauf, A. A. Condy

    Numerous processes for the treatment of thiosalts in base metal milling effluents have been examined in the past decade. Flowsheets for thirteen processes are outlined, and cost estimates are presente

    Jan 1, 1988

  • CIM
    The impact on underground ventilation of the reduction of diesel emissions toxicity by water-in-oil fuel emulsification

    By J. P. Mogan, E. D. Dainty, A. Lawson

    "The toxicity reduction of emissions from two diesel engines by the emulsification of water into fuel oil was investigated to determine the applicability of such systems to underground mining machiner

    Jan 1, 1981

  • CIM
    Developments tn Dust Collection Equipment

    By J. H. McKibbon

    THE metallurgical industry has purchased more than sixty per cent of the industrial gas cleaning equipment installed in Canada. This includes cyclonic collectors, scrubbers, cloth filters and Cottrell

    Jan 1, 1962

  • CIM
    Investigating Total Media Wear

    By Peter Radziszewski

    "Comminition process costs, which typically represent an important contribution to mining operating costs, can themselves be divided roughly between energy and liner /charge wear. As such, developing

    Jan 1, 2001

  • CIM
    Paracatu Gold Mine - Successful Processing of a Large Low-Grade Ore Body

    By Wayne Phillips, Anatalia Silva, Robert Henderson, Tondo. Luis

    "Kinross’ Paracatu Mine has 20 years of operational success as one of the lowest grade milloperated gold mines in the world. At year end 2005, Paracatu’s Proven and Probable Reserves were 1.18 billion

    Jan 1, 2007

  • CIM
    Modeling the Dynamic Mechanical Behaviour and Texture Evolution of Additively Manufactured Alsi10mg_200c

    By Mohsen Mohammadi, Edward Cyr

    "To date, several studies have been performed on the static mechanical properties of SLM-AlSi10Mg alloy. There have also been more recent studies on the relation between scan strategy, texture, and me

    Jan 1, 2018

  • CIM
    The Camray Uranium Discovery

    By A. H. Lang

    Introduction The recent uranium discovery at Theano point, lake Superior, is probably a rediscovery of the first reported Canadian uranium occurrence. A description of material from the original di

    Jan 1, 1949

  • CIM
    Barrick Goldstrike Roaster - Roasting and Gas Handling

    By Andy Cole, Ken Thomas, Stephen Durn, Jacques McMullen

    "The roasting and gas handling circuits of the Barrick Gold’s new Roasting Facility at the Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the desig

    Jan 1, 2001

  • CIM
    Mechanization in the Collieries of The Dominion Steel and Coal Corporation

    By The Staff

    Introduction For many years the necessity of mechanization of all the underground services in the collieries of the Dominion Steel and Coal Corporation in the Sydney, Pictou, and Cumberland coalfie

    Jan 1, 1949

  • CIM
    Specialization Within the Geological Profession

    By Theo. A. Link

    ACCORDING to our office dictionary, geology is "the science that investigates the structure of the earth and its successive physical changes", and a geologist is "one who knows the science of the stru

    Jan 1, 1956

  • CIM
    Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale Study

    By Sunil Koppalkar, A. R. Laplante

    "A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating

    Jan 1, 2007

  • CIM
    Electricity in Coal Mines

    By E. L. Martheleur

    The use of electricity in coal mines dates almost from the time when it was realized chat it could be used to produce mechanical power. The first motor put in service underground was installed to driv

    Jan 1, 1928

  • CIM
    Fine Grinding Investigations at Lake Shore Mines

    By The Staff

    THE object of the work was to increase the capacity of the plant and, if possible, to reduce costs of the actual unit grinding while doing so. The accompanying assays of an infra-sizer analysis of the

    Jan 1, 1940

  • CIM
    Isasmelt™ - Smelting more with Less

    By Biplop Das, E. Herrera, A. Burrows, P. J. Mackey, G. R. F. Alvear Flores

    Since the first commercial plant was built at Mount Isa, another twenty ISASMELT™ furnaces have come into commercial operation, and construction of new plants continues. The primary copper ISASMELT™ t

    Jan 1, 2015