Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Automatic Mine Pumping With Off-Peak Power

    IN 1932, the No. 4 shaft at Wright-Hargreaves mine was completed to a depth of 4,000 feet, and the lowest operating level at that time was at 3,900 feet. It was realized that the existing pumping syst

    Jan 1, 1939

  • CIM
    Selection of optimum ferronickel grade for smelting nickel laterites

    By B. Wasmund, M. Y. Solar, I. Candy

    The nickel laterite industry is divided into two camps when it comes to the grade of the ferronickels produced. One group, led by Falcondo and Cerro Matoso, markets high-grade ferronickels in the rang

    Jan 1, 2008

  • CIM
    One ton of bismuth in the lead smelter and 60 years of Kroll-Betterton

    By Funsho K. Ojebuoboh

    With several “green” applications on the horizon, bismuth has become an even more important minor metal in the smelting and refining of lead. Smelters with a complex sulphide feed invariably deal with

    Jan 1, 1996

  • CIM
    Role of dispersants in the production of fine particle size calcium carbonate and kaolin slurries

    By J. S. Phipps, D. R. Skuse

    "Aqueous slurries of fine particle size calcium carbonate are used in a diverse range of end-use products. In many cases, the end-use performance is governed by the fineness of the particle size distr

    Jan 1, 2003

  • CIM
    Industrial Relationship

    By Selwyn G. Blaylock

    There is no more important problem today than industrial relationship, and probably none that is receiving more thought. But in these days of Epie and Utopia, one has to be rather careful in speaking

    Jan 1, 1935

  • CIM
    Assessment of Wall Control Blasting Practices at the Ekati? Diamond Mine

    By J. Peterson

    A review of blast designs and improved blasting practices at the Ekati??Diamond Mine is presented along with the results of three blast-monitoring experiments. Blast monitoring was undertaken to inves

    May 1, 2001

  • CIM
    The Saskatchewan Potash Prorationing and Price Stabilization Program

    By D. A. Karvonen

    In 1970, the Government of Saskatchewan instituted a program aimed at resolving the dilemma of excess productive capacity over the market demand which existed for potash produced in Saskatchewan. The

    Jan 1, 1973

  • CIM
    Balmer's in-pit coal conveyor: Improving haulage efficiency

    By C. H. van Eendenburg

    "Installation of a 3.6 km long raw coal conveyor in the Balmer open pit was undertaken to improve over-all haulage efficiency. This paper covers the rationale behind this project, system design and co

    Jan 1, 1990

  • CIM
    On the Optimal Profile of a Rock Slope

    By S. Utili

    "The optimal profile of a rock slope under given geometry constraint is investigated by means of the upper bound method of limit analysis. The optimal condition corresponds to maximizing stability fac

    Jan 1, 2015

  • CIM
    Tidal Power

    By G. C. Baker

    Despite the attention belatedly bestowed on tidal power in recent years, it remains largely a potential rather than an actual source of energy. The resource is, practically speaking, non-depletable. E

    Jan 1, 1972

  • CIM
    Nova Scotians Look at British Coal Mining Practice

    By John M. Gordon

    DURING and after 1949, various groups of British mining engineers came to the Dominion Coal Company, Limited, at Sydney, N .S., to see at first hand the Dosco MINER ( 1). These visits culminated in 19

    Jan 1, 1956

  • CIM
    Modern Trends in Hollow Drill Steel

    By B. M. Hamilton

    "IntroductionTHE PROCEDURE and technique for drilling holes has probably undergone as great a change during the past ten years as any one of the other operations conducted in hard-rock mining. During

    Jan 1, 1954

  • CIM
    Explore or acquire? The dilemma

    By H. O. Seigel, J. C. Gingerich, E. O. Köstlin

    "To satisfy their continuing need to replenish or expand their ore reserves, mining companies are faced with the dilemma of arriving at a proper balance between the dual avenues of discovery through i

    Jan 1, 2002

  • CIM
    The Changing Role of Hydrometallurgy

    By B. Meddings, O. J. I. Evans

    "This paper is mainly concerned with the present and probable future role of hydrometallurgy in the production of base metals.The economic and technological bases of the hydro-metallurgical plants bui

    Jan 1, 1971

  • CIM
    A review of the first 25 years of mobile machine automation in underground hard rock mines

    By Malcolm Scoble, Nick Vagenas, Greg Baiden

    Recent advances in underground communications technology have demonstrated the feasibility of teleoperation and automation in underground metal mines. One major challenge lies in the automation of und

    Jan 1, 1997

  • CIM
    The Sherritt-Cominco Copper Process ? PART II: Pilot-Plant Operation

    By P. Kawulka

    An integrated pilot plant for the development of the S-C Copper Process was constructed at Fort Saskatchewan in 1975 and operated in 1976. The pilot plant was designed to treat 9 tonnes per day of a p

    Jan 1, 1978

  • CIM
    Critical hydraulic pressure forecasting of water inrush in coal seam floors based on a genetic algorithm-neural network

    By T. Liu, C. Shi, T. Fu, M. Zhong

    Water inrush in coal mines is induced by the imbalance of the groundwater flow field and the engineering geo-mechanics field. Therefore, to prevent water inrush it is important to predict the critical

    Jan 1, 2008

  • CIM
    Hoisting at Alwinsal

    By W. D. Breil, C. B. Ison

    A collection of general performance data relating to the G.H.H. - Gutehoffnungshiitte multi-rope friction hoist will be discussed together with some aspects of the following: overspeed supervision by

    Jan 1, 1972

  • CIM
    Mining Automation Program

    By C. J. Preston, R. E. Ström, G. R. Baiden

    "On January 1st 1996 Inco Limited, Tamrock OY, Dyno Explosives Group and CANMET formed a consortium for the development of robotic mining equipment. This project is a five year research and developmen

    Jan 1, 1997

  • CIM
    Technology Development in the Copper Industry

    By J. O. Marsden

    Over the past decade, the copper industry has been through an extended downturn followed by several years of sustained high copper price. A number of new technologies have been developed over the past

    Jan 1, 2007