Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of the Tower Mill as Regrind Machine

    By J. M. Menacho, J. M. Reyes

    "Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te

    Jan 1, 1989

  • CIM
    Drill Rig Navigation and Drill Plan Creation using IREDES

    By André van Wageningen

    Since the beginning of this century Boliden Mineral and Atlas Copco have worked together in stages on improving the accuracy and quality of drilling. Navigation of the drill rigs with IREDES has been

    Oct 1, 2009

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    Reactions of Cycloaurated Au(III) Compounds with Thiols

    By Yongbao Zhu

    The Ag2O-mediated reactions of cycloaurated compounds with a general formula Au(L)Cl2 (L = bi-dentate C?N ligand) with thiosalicylic acid, N-acetyl cysteine or 1,2-benzenedithiol in DMF proceeds via l

    Oct 1, 2003

  • CIM
    Design and Operation of a Future Mill

    By D. E. Pickett, J. A. Roland Faucher

    "INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow

    Jan 1, 1979

  • CIM
    Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)

    By C. S. Maggs, L. Shwydiuk, H. W. Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    Jan 1, 2003

  • CIM
    Performance Characteristics of an Improved Flotation Mechanism

    By George A. Lawrence, J. C. McHardy

    "Field operating experience with an improved flotation mechanism for handling various flotation applications is covered in this paper. Some aspects of designing flotation machines are also presented.

    Jan 1, 1985

  • CIM
    An Expert System Supervisor of a Flotation Circuit

    By A. L. Mular, R. P. Edwards

    "The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits

    Jan 1, 1991

  • CIM
    Preparing a Long-Lasting Environmental Impact Statement

    By Glen A. White

    The level of impact and mitigating measures that are forecast in an environmental assessment (EA) for a new, or significantly modified, metallurgical processing facility or mine are taking on increasi

    May 1, 2004

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991

  • CIM
    The need for technology standards for mobile equipment in the mining industry

    By T. Skinner, M. Sahebkar

    "In recent years, the mining industry has been inundated with new technologies and software systems to aid in productivity improvement. Accompanying this increased level of technology and computer sys

    Jan 1, 2003

  • CIM
    Chemical Additives for Improving the Wet Grinding of Ores

    By R. Samuels, R. Klimpel

    "IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou

    Jan 1, 1979

  • CIM
    Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant Results

    By D. Kidby, A. Briggs

    "Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating

    Jan 1, 1992

  • CIM
    Stereolithography—a rapid prototyping technique for orebody modelling and mine design

    By A. Akerman, C. P. O’Connor, N. Vayenas

    "Stereolithography is a well-known rapid prototyping technique in the manufacturing sector. Essentially, it is a three-dimensional printing process that produces plastic prototype parts from standard

    Jan 1, 2006

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    The Echo Bay Mines Silver Mill

    By Graham A. Karklin

    "The Echo Bay Mines silver property is located 875 air miles north of Edmonton, Alberta. The mine is on the east shore of Great Bear Lake at Port Radium which is twenty six miles south of the artic ci

    Jan 1, 1981

  • CIM
    Separation of Metals in Aqueous Solutions by Ion Exchange

    By A. Himsley

    "There is an ever-increasing demand these days for efficient methods of removing metals from solutions especially for selectively recovering a particular metal from a mixture of metals in solution.Up

    Jan 1, 1975

  • CIM
    Development of an index to quantify the addition recovery in light metals

    By M. Pekguleryuz, S. A. Argyropoulos

    "The recovery of additions in light metals is an important parameter influencing consistency of the finished product, which ultimately means cost. Recovery is a function of many parameters such as ass

    Jan 1, 2002