Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Path to Best Practice at Geita Gold MineBy M Monaghan, B S. Gregory
The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I
Sep 18, 2012
-
Sustainable Plant DesignBy J Kwak
Driving sustainability concepts and practices into the heart of the design process is the key to achieving a successful, sustainable plant design. Engineering design practices, tools, systems and meth
Jan 1, 2004
-
A guide to ground disturbance permitting and managing ESG riskBy H Arvidson, B Spence, S Helm
Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc
Sep 18, 2023
-
Case Study – Application of RISKGATE to Managing Strata Failure in an Australian CoalmineBy J Harris, J Turner, P Kirsch
Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment
Nov 5, 2014
-
Visualisation of calculated thermodynamic properties by integration of FactSage™ with SEM-EDS element mapsBy S Mitra, D O’Dea, N Barrett, T Honeyands, E Copland
This work describes a novel mapping technique that allows the direct overlay of calculated local phase equilibria on micrographs of the physical system. The technique demonstrated integrates FactSage™
Jun 19, 2024
-
Profitable and Productive Partnerships ù Optimising Coal Recovery in Close Proximity to the Hunter RiverBy D Stacey, J Matthews
Hunter Valley Operations in partnership with Orica Explosives designed a process to optimise coal extraction at depths greater than 65 m below the Hunter River in a safe and cost effective manner. The
Jan 1, 2001
-
Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)By G Zhang, I Glacken
Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p
May 24, 2023
-
Blast Design Using Measurement While Drilling ParametersBy M Higgins
Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio
Jan 1, 2001
-
Application of Alternative Lixiviants for Secondary Heap Leaching of GoldBy N Stockton
Some preliminary results on the secondary leaching of previously heap leached gold ore are presented. Alternative lixiviants for gold comprising chlorine, thiourea and thiosulphate were compared with
Jan 1, 2000
-
Tailing Thickener Operability and Control Improvements at ProminentáHillBy J Lombardi, M Weidenbach
"OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township
Oct 29, 2012
-
Mine geology standardisation – providing the foundation to consistent short-term geometallurgical product predictions in a complex multimine and supply chain environmentBy B L. Sommerville
"The theme of this International Mining Geology Conference is ‘Setting New Standards’. Rio Tinto’s iron ore operations include a complex integrated supply system to deliver ore from 15 mine operations
Sep 20, 2017
-
Opening Supports to Segmental Linings – A Novel Shotcrete Support SolutionBy M Burdick, A Harding, M Krulc, M Chappell
Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How
Sep 17, 2014
-
Risk-Based Ore Selection from Conditionally Simulated Block ModelsBy J E. Everett, F Grobler
This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo
Aug 12, 2013
-
Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water QualityBy N Taylor, P Hewitt
The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet
Sep 17, 2014
-
Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold MineBy T A. Carter
In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he
Mar 24, 2014
-
Impact testing of raise bore protection meshBy M Doran
The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3
Mar 29, 2023
-
Molten Salt Process for Debismuthising LeadBy Denholm WT
The Dittmer process for the debismuthising of lead by electrolysis beneath molten caustic soda has been scaled up to 100 kg lots for batchwise operation and to 20 kg per hour for a continuous flow
Jan 1, 1975
-
Stockman Base Metals Project – Sustainability, Social Licence to Operate and Permitting Lessons LearntBy R Jacobs, J Yeates
"The Stockman base metals project is situated in State Forest in the alpine area of East Gippsland, Victoria, adjacent to a National Park and within the headwaters of a major Ramsar-listed wetland cat
Mar 8, 2016
-
Yilgarn Star ù Just in Time Methodology ù Planning and Scheduling ImplicationsBy G Haywood
This paper presents the evolution of the planning, scheduling and mining practices at the Yilgarn Star underground. The paper will concentrate on the principals of æjust in timeÆ and the impact of suc
Jan 1, 2002
-
A System of Diluting Methane to Safe LevelsBy R Hughes
"Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.
Jun 1, 2012