Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Prediction of Burden at the Sungun Copper Mine by Artificial Neural NetworkBy H Khoshrou, A Siamaki
Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b
Sep 26, 2011
-
Fluorine Removal From Ok Tedi Copper/Gold ConcentratesBy J W. Glatthaar, M Mavotoi
The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho
Jan 1, 2003
-
A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USABy R H. Knight
Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or
Aug 18, 2014
-
Case Study of Iron Ore Value Chain OptimisationBy J Foo, T Kleinschmidt, B Reynolds, K Kennewell
The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the
Jul 13, 2015
-
An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western AustraliaBy C F. Stokes
The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)
Aug 22, 2011
-
Detecting Sampling Biases in Metal AccountingBy L Lachance, F Flament, D Leroux, S Gariépy
The pervasiveness of poor sampling practices in and around mineral processing plants could seem intriguing in view of the various documented evidences both for causes and consequences. To this extent,
Jul 29, 2014
-
Defying Gravity – Brownfield Continuous ImprovementBy J Robinson, L D’Uva
"The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat
Oct 10, 2016
-
Gas Evolution Trends for Coal from Two Different Areas at Clarence CollieryBy J Sargeant, T Levi, J Theiler, B Beamish
Two coal samples (810 Panel and Area 900) collected from Clarence Colliery have been tested under a controlled heating procedure to evaluate the gas evolution trends corresponding to increasing temper
Aug 31, 2015
-
Design of Segmental Lining for Waterview Project, Auckland, New?ZealandBy S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in BrisbaneBy A Purwodihardjo
Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t
Mar 8, 2011
-
Controlling Blast Related Fumes with Unconventional ExplosivesBy J Rock, K Bambrook
"Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th
Nov 15, 2016
-
Process Design Aspects at Bendigo Mining's Gold OperationsBy T E. Hayward, D H. English, S J. Smith
Gold mineralisation at Bendigo is exclusively associated with quartz reefs, commonly found within or near anticlinal fold hinges. The gold is typically coarse grained (0.5 mm to 5 mm), free milling an
Jan 1, 2007
-
Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa MinesBy J Simpson, M Johnston
Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n
Jan 1, 2003
-
Development and Application of a Piezoelectric Sensor for Turbulence Measurement in Industrial Flotation CellsBy P Holtham, J Meng, E Tabosa, W Xie
Turbulence and its distribution are of great importance in flotation, and have received considerable attention recently. However, there is no mature technique to measure turbulence in three-phase (liq
Sep 1, 2014
-
The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical SimulationBy Q Yu, G Ren, Z-Y Chen, J Yang
The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole
Aug 24, 2015
-
Walk or Talk - Is the Current Mine Approval Process in Queensland Delivering Rehabilitation and Closure Success?By T Baumgartl, R I. Maczkowiack, O White, P D. Erskine
Queensland legislation, industry codes and policies relating to mine rehabilitation and closure create the expectation of successful progressive rehabilitation and that the post-mining environment is
Jul 10, 2012
-
Discovery of the Corunna Downs DepositsBy P J. Howard, P Darvall, J H. Mainwaring
In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south
Jul 13, 2015
-
The Role of the Perth Mint in the Valuing, Refining and Marketing of the Precious MaetalsThe Perth Mint receives gold and silver from various sources for evaluation and refining. The metals are received in many forms and vary widely in assay. Refining is carried out using the Miller Proc
Jan 1, 1982
-
Planning for the Future – Development of Beneficial End Use from a Quarry Pit Lake, Victoria, AustraliaBy C D. McCullough, M Gerner
Rarely do opportunities arise allowing closure of a mine site to be planned as a key beneficial land use asset within a new urban growth area; particularly so well prior to cessation of mining.Pit lak
Jul 16, 2014
-
Extending mine life through application of an in situ recovery approachBy D J. Robinson, L L. Kuhar
In-situ recovery (ISR) is accepted and applied across many geographies, and approximately 50% of the world’s uranium is currently extracted by using an ISR method (World Nuclear Association, 2014). T
Jul 25, 2018