Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Planning & Design Of New Tailing Disposal Facilities At ZC/NBHCBy Lean P. J
The present The Zinc ODrporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) tailing dam (Site C) is expected to reach its terminal capacity late in 1985. Planning and design of ne
Jan 1, 1983
-
Estimation of Flyrock Travel Distances: A Probabilistic ApproachBy M F. L Gibson
The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f
Jan 1, 2001
-
Heavy Medium Separation at Iscor's Sishen Iron-Ore-MineThe Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2
Jan 1, 1987
-
Study of Soil Media with Multiple Tunnels or Cavities Using the Boundary Element TechniqueBy Dif A. E N, Abdalla MH
The effect of multiple tunnels /cavities on the stress and deformation field of the soil media was investigated by using a two dimen- sional plane strain boundary element model. The soil was conside
Jan 1, 1987
-
Resources of Mineral Sands, What of their Future?In 1985 BMR assessed Australia's economic demonstrated resources of mineral sands as follows: rutile 8.0 Mt, ilmenite 41.4 Mt, zircon 11.5 Mt, and monazite 229 000 tonnes. These resources are
Jan 1, 1986
-
An Assessment Of Swelling On Reduction Methods For Iron Ore PelletsAn assessment has been made of six reported methods for the determination of the swelling of iron ore pellets on reduction. The methods are discussed on the basis of apparatus requirements, reducti
Jan 1, 1974
-
A systematic approach of sample selection to predict processing performance of an ore bodyBy K Tungpalan, E Wightman, M Edraki, E Manlapig, L Keeney
The depletion of easily mined high-grade ore bodies resulted in the industry having to exploit lower grade, complex resources (Albanese and McGagh, 2011; Darling, 2011; Randolph, 2011). The trend is n
Nov 21, 2018
-
Diamond Composite Cutters in Drill Bits and Cutting Tools for Hard Rock CuttingBy J Boland
Polycrystalline diamond compacts (PDC) have been widely used as cutting elements in the drilling tools for the oil, gas, civil and mining industries because of their faster penetration rates and longe
Jan 1, 2004
-
Applied Remote Sensing Research For Mineral ExplorationThe Division of Minerals and Geochemistry in collaboration with three mineral exploration companies, Mawson Pacific Ltd, Ramsgate Resources Ltd and Tectonic Systems Pty Ltd commenced a two year re
Jan 1, 1987
-
Leaching Behavior of Gold in Iodide SolutionsBy Qi P. H
Gold dissolution can be achieved with a number of complexing ligands, all with varying degrees of stability. Processes based on the use of halogens have been known for many years. Beside providing t
Jan 1, 1991
-
The Selective Ion Flotation of Gold Cyanide from a Heap Leach Mine Feed LiquorBy Nicol SK, Engel MD
Ion flotation involves the adsorption of ionic species, in association with surfactant molecules, at the surface of rising gas bubbles, for the purpose of recovering and concentrating those ions. Th
Jan 1, 1993
-
The Use of Seismic Methods for the Detection of DykesBy Cocker J, Urosevic M
Seismic methods have become common for the detection of low-throw faults ahead of underground coal mining. Surface seismic methods cannot theoretically be used where dykes occur, because seismic waves
Jan 1, 1998
-
Surface and Borehol Microseismic Monitoring of Longwall Faces; their Potential for Three-Dimensional Fracture Imaging anf the Geomechanical Implications.By Bishop I, Toon S
To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.M, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was
Jan 1, 1992
-
Hydraulic Fracturing for Rapid Low Cost Stress Measurement in Underground MinesBy Crawford G. R, Wold M. B
The application of the hydraulic fracturing technique to the measurement of in situ rock stress from underground excavation is discussed; including relevant theoretical considerations, equipmenl detai
Jan 1, 1990
-
Strengths and Resilient Modulus For Crusher Run Blast Furnace Slag and AdditivesThe main aim of the conference is to work towards improved useage of steelplant slags which have largely been considered waste mater- ials, This paper summarised investigations carried out on the su
Jan 1, 1979
-
Geological Studies for Predicting Artesian Dewatering Requirements at Loy Yang Open Cut, Latrobe Valley, Victoria, AustraliaBy Brumley J
The development of the SECV brown coal open cut at Loy Yang will require depressurisation of aquifers both within and below the coal seam sequence in order to maintain open cut stability. Prediction
Jan 1, 1988
-
Venturi Scrubber System for Dust Control on a Longwall FaceBy Rao S. B, Baafi E. Y
A venturi based multi-scrubber air cleaning system has been developed for dust control along a longwall face in coal mines. The system consists of a number of scrubbers. strategically placed along the
Jan 1, 1995
-
Parameters Affecting the Shield Support Efficiency in Longwall MiningBy Hsiung SM, Jiang YM
The orientation and location of the hydraulic legs are two very important parameters for the design of shield supports in longwall mining. Studies have shown that leg orientations and locations of
Jan 1, 1988
-
Manganese ù From Waste to High-tech MaterialBy M D. Urbani
HiTec Energy Ltd has been conducting research since 1996 into novel process routes for the treatment of low-grade and waste manganese sources for the production of high value and high quality electrol
Jan 1, 2004
-
Design and Scale-Up Criteria for Column FlotationBy Mankosa MJ, Yoon R-H
A reliable scale-up procedure for column flotation must address three important areas of column design, ie column geometry, sparging system and wash water distribution network. The column geometry i
Jan 1, 1993