Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Role of Geology and Exploration Within the Mining Cycle at the Osborne Mine, NW QueenslandBy P Voulgaris
The Osborne Mine commenced production from an open pit in December 1994 with the first ore being hauled from underground one year later. Currently all ore is hauled up a decline by trucks until the sh
Jan 1, 1998
-
Clean Energy and Mining – Future SynergiesBy R Memary
The environmental and economic impacts of a significant dependence on fossil fuels are affecting the future of sectors such as of mining. These impacts are prompting the Australian Government to seek
Nov 22, 2011
-
Oxidation of Pyrite by Ferric Iron in the Acidic Berkeley Pit Lake, Montana, USABy J P. Jona, S R. Poulson, C H. Gammons
Spatial and temporal trends in water chemistry in the acidic (pH ~2.6) Berkeley Pit lake, Butte, Montana, can be explained by a newly developed iron-cycling model. Key elements of this model include:
Jan 1, 2003
-
On the Joint Multipoint Simulation of Discrete and Continuous Geometallurgical ParametersBy K G. van den Boogaart, M Lehmann, U Mueller
Geometallurgical parameters are descriptions of the mineralogy and microstructure of the ore determining its mineralogical and microstructural characteristics. From a conditional geostatistical simula
Nov 24, 2014
-
PIMS ù The Road to Efficient, Cost-Effective Plant OperationBy D Hunter
A production information management system (PIMS) was recently implemented at Queensland NickelÆs Yabulu Refinery. Although a strong business case was developed to justify the significant investment i
Jan 1, 2003
-
Multicomponent modelling of ore blending in grinding circuits – a new model and case studyBy J J. Hanhiniemi, M S. Powell
A ‘Variable Blend and Rates’ model is developed for SAG mills which extends upon the JKSimMet® Variable Rates Model. Similarly, a ‘Variable Blend Residence Constrained Perfect Mixing’ Ball Mill model
Aug 24, 2022
-
Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.By Hughes J. C
THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia
Jan 1, 1922
-
Cemented Fill Practice and Research at Mount IsaThis paper considers three aspects of cemented fill practice and research in Mount Isa. Firstly, an account is given of the use of Portland cemented hydraulic fill, considering mainly the role and s
Jan 1, 1980
-
Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant Mine (d53b2c09-d9ab-48b2-94c6-0c6f856d783f)By Bawden WF, Paynter JT
This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxia
Jan 1, 1998
-
Lithospheric Thickening and Orogenic Collapse Within the Canadian CordilleraBy Carr SD
The Omineca Belt of the Canadian Cordillera straddles the western boundary of the North American paleocontinental margin and accreted oceanic and island arc terranes. Crustal thickening of the orogeni
Jan 1, 1990
-
The Importance of Rock Breakage Technology to the Future of Underground Space in AustraliaUnderground space can be defined as space below natural ground level which can be used as an alternative to an above ground location. While many of our above ground structures inherently involve und
Jan 1, 1995
-
Polypropylene Membrane FiltersFilter Presses are used in a wide range of process industries where high quality filtration at elevated pressure is required. This is mainly due to the fact that modern presses are fitted with poly
Jan 1, 1989
-
Backfill: An Integral Component of Mine ProductionBy D Morrison
Backfill is usually considered a necessary evil that contributes little to the principal objective of the operation, ore production. Consequently, it is relegated to an auxiliary role in the operation
Jan 1, 1998
-
The New Lead and Zinc Flotation Sections of the Concentrator of Broken Hill South LimitedIn this paper is given a description of the flotation plant recently erected by Broken Hill South Limited at the South Mine, Broken Hill, N.S.W. It has been built on the site of the old flotation plan
Jan 1, 1935
-
Monitoring and Control in the Recirculation of Underground Ventilation AirBy Walker K, Burton RC
An outline of the ventilation and refrigeration requirements of deep South African gold mines is presented. This is followed by a brief description of the history of controlled recirculation in mines
Jan 1, 1985
-
Alluvial Mineral Property ValuationOutline of situations when valuations required - from capital raisings and takeovers, stamp duty, rates and capital gains tax, to probate and litigation between joint venture parties. Definition of t
Jan 1, 1992
-
Operational Assessment of Underground Conveying SystemsSimple parameters, capable of easy observation on-site under operating conditions without interruption to production, are outlined for the operational assessment of underground conveyor systems. R
Jan 1, 1982
-
TEMCO û The Australian Ferro Alloy ProducerBy Berglin IK
Since 1962, ferro alloy production in Australia has been concentrated at Bell Bay, Tasmania with a major expansion occurring in 1976. This concentration was based originally on the perceived requireme
Jan 1, 1985
-
Real Time Mine Management Systems - Delivering Value Adding Information to the Mining WorkplaceThe Macquarie Dictionary defines `information' as: knowledge communicated or received concerning some fact or circumstance; (in communicating theory): a quantitative measure of the contents of
Jan 1, 1995
-
Rock Deformation and Mineralization at Mount IsaBy Hall G
The Mount Isa silver-lead-,zinc deposit possesses a number of features which sets it apart from usual occurrences of ores containing those metals. The deposit has been described in vario:us papers, bu
Jan 1, 1942