Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Innovative and Resource-Preserving Washing Processes for Primary and Secondary Raw Materials

    Innovative and Resource-Preserving Washing Processes for Primary and Secondary Raw Materials

    Sep 13, 2010

  • AUSIMM
    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Sep 13, 2010

  • AUSIMM
    Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the Design

    By I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve

    The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main

    Sep 17, 2014

  • AUSIMM
    Gold-Silver Mineralisation at Neavesville, Coromandel Peninsula, NZ

    By L Torckler, R L. Brathwaite

    At Neavesville gold-silver (electrum) mineralisation occurs in steeply-dipping zones of intense fracturing, brecciation and quartz veining within rhyolitic pyroclastics, carbohaceous shales and andesi

    Jan 1, 1980

  • AUSIMM
    Adsorption Effect on Multi-Heavy Metal Ions in Wastewater by Water-Washing Waste Saccharomyces cerevisiae

    Adsorption Effect on Multi-Heavy Metal Ions in Wastewater by Water-Washing Waste Saccharomyces cerevisiae

    Sep 13, 2010

  • AUSIMM
    Modelling Bulk Density ù The Importance of Getting it Right

    Tonnage and grade are the principal reported components of mineral resource estimates but tonnage is a derivative of two more fundamental estimates; volume and bulk density. Typically, most of the eff

    Jan 1, 2000

  • AUSIMM
    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Sep 13, 2010

  • AUSIMM
    Application of Kriging in Approximations of Grained Materials Characteristics Distribution Functions

    Application of Kriging in Approximations of Grained Materials Characteristics Distribution Functions

    Sep 13, 2010

  • AUSIMM
    Reductive Leaching of Manganese Containing Material with Pyrite in a Mild Sulphuric Acid Medium

    By Parida K. M, Paramguru R. K

    Laboratory-scale studies aimed at developing a process for solubilising manganese values from a low grade pyrolusite containing material using low grade pyrite, both available in India, are described.

    Jan 1, 1995

  • AUSIMM
    Joint Ventures - Taxation Risks and Advantages

    Both here and in Australia, the unique commercial and tax features of joint venture are finding favour in forestry, fishing, technology and infrastructure projects. For New Zealand mining companies, j

    Jan 1, 2005

  • AUSIMM
    A Sustainable Minerals Sector in Australia? Thoughts from a Science and Technology Perspective

    In the context of sustainable development, the Minerals Council of Australia (2010) states that 'investments in minerals projects should be financially profitable, technically appropriate, enviro

    Jun 1, 2010

  • AUSIMM
    Mining Zinc-Rich Massive Sulphide Deposits on Vancouver Island, British Columbia

    The Myra Falls minesite, of Westmin Resources Limited, is located at the geographic centre of Vancouver Island, within the confines of Strathcona Provincial Park. The operation includes two active u

    Jan 1, 1993

  • AUSIMM
    The Development of a Robust Sampling Strategy and Protocol in Underground Gold Mines

    The development of a robust belt sampling strategy and protocol inunderground gold mines is a fundamental requirement for effective grade quality control, ore accounting and mine-mill reconciliations.

    Jan 1, 1999

  • AUSIMM
    3.26 GA Black Smoker-Type Textures and Setting of VMS Mineralisation in the Pilbara Craton, Western Australia: Ancient Analogues of Modern Pacific-Rim Processes

    By R Kerrich

    Early-Archaean (3.26 Ga) volcanogenic massive sulphide (VMS) deposits located within the low strain and sub-prehnite-pumpellyite metamorphic-grade Strelley greenstone belt, East Pilbara, Western Austr

    Jan 1, 1995

  • AUSIMM
    Particle Size Measurement of TiO2 Nanoparticles in Non-Aqueous Solvent by Interactive Force Apparatus Under an Electric Field

    Particle Size Measurement of TiO2 Nanoparticles in Non-Aqueous Solvent by Interactive Force Apparatus Under an Electric Field

    Sep 13, 2010

  • AUSIMM
    A Comparison of Massive Sulphide Deposits Forming at the PACMANUS (Manus Basin, PNG) and Jade (Okinawa Trough, South China Sea) Seafloor Hydrothermal Fields

    By R A. Binns, S Murao

    The PACMANUS and Jade deposits are two active hydrothermal fields that are forming massive sulphide deposits at the Pacific rim margin. Both are associat

    Jan 1, 1995

  • AUSIMM
    The Planning of Pre-Commitment Phase Geotechnical Investigation in the Lochiel Coal, South Australia

    Geotechnical conditions in the Lochiel Deposit are somewhat unusual, and thus geotechnical and hydrological investigations have assumed a high priority. The cost of mining the deposit has been sho

    Jan 1, 1986

  • AUSIMM
    Operational Challenges and Lessons Learnt at Xinli Nonferrous Co Ltd’s Ilmenite Smelter

    By H Weitz

    Bateman Engineering provided process technology and engineering design to China Yunnan Metallurgical Company (CYMCO) for a 30 MW DC furnace for the production of high-grade titanium dioxide slag.Follo

    Oct 5, 2011

  • AUSIMM
    Managing Closure at Brunswick Mine

    Brunswick Mine, one of the largest underground zinc mines in the world, is scheduled to close in 2010 after almost half a century of production. All mines eventually close; some suddenly as a result o

    Jan 1, 2006

  • AUSIMM
    Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derate

    By V Matousek, A Sellgren, R Visintainer, G McCall

    A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a

    Nov 8, 2021