Search Documents

  • AUSIMM
    Safety impact of increased shaft ventilation on rope guided conveyances

    By R S. Hamilton, S R. Grobler, M E. Greenway

    The progressive development of underground mines frequently requires increased ventilation flow rates through mine shafts that were originally designed for lower rates. Where these shafts are equipped

    Aug 28, 2017

  • SME-ICGCM
    Applications of Microseismic Monitoring in China?s Underground Coal Mines

    By Xiangxi Wu

    Longwall and continuous mining are prevalent methods employed by Chinese underground coal operations. The main ground control challenges include roof skin deformation, roof collapse, and outbursts of

    Jan 1, 2012

  • AUSIMM
    Innovations and State-of-the-Art Technologies Employed in the Continuous Casting of Slabs and Beam Blanks

    By Zajber A, Kulchen R, Letzel D, Weyer A, Schwellenbach J

    The search for modem casting plant concepts today focuses more and more on the harmonisation and optimisation of overall concept lines to obtain a continuous quality control and reduce the cost of

    Jan 1, 1999

  • SME-ICGCM
    High Horizontal Stress Effects On Longwall Gate Entry Stability

    By Yajie Wang

    High horizontal stress and its adverse effects on longwall gate entries have been witnessed in many US coal mines for the past years. It can cause cutter roofs and leads to roof falls either in the he

    Jan 1, 1996

  • SME
    Cost Effective Tunnel Development In Slovakia

    By John Chadwick

    In the drive for faster development advance rates, railbound systems can be advantageous, in the right application. Skanska BS, the contractor to mine-owner VSK Mining, is driving an adit access deep

    Jan 1, 2009

  • SME
    The Sir Adam Beck II Intake Tunnels—Homage To The Builders

    By Clair Murdock, David Heath

    The 1,280 MW Sir Adam Beck II Hydroelectric Project was constructed in the1950s, at Niagara Falls, Ontario, Canada. The twin intake tunnels total over 17 kilometers in length and pass deep below the C

    Jan 1, 2007

  • NIOSH
    OFR-84(9)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume IX - Water Generator

    By C. B. Manula

    This report is volume 9 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod

    Jan 1, 1975

  • ISEE
    Field Applications and Quantification of Electronic Detonator Technology

    By Douglas Bartley, Brian Wingfield, Robert McClure

    Recent studies and limited tests indicate favorable results utilizing high accuracy electronic detonator technology over conventional non-electric pyrotechnic systems. This study discusses the applica

    Jan 1, 2001

  • SAIMM
    Longwalling At Great Depth In A Geologically Disturbed Environment - The Way Forward

    By F. Russo-Bello

    TauTona Mine (the renamed Western Deep Levels East) is using a longwall mining method with stability pillars to extract the Carbon Leader Reef at a depth ranging from 2097 metres to 3456 metres below

    Jan 1, 2000

  • NIOSH
    Economic Consequences of Mining Injuries

    By J. Girard-Dwyer, T. Camm

    Direct costs such as medical, legal, administrative, and worker’s compensation costs, property damage, lost earnings, and lost benefits are typically used to compute the economic impacts of occupation

  • AUSIMM
    Simulation for Dependable Mining Automation

    A discussion on simulation tools to aid the development of robotics platforms is presented. The focus of the work is towards mining robotics platforms where operations are typically in unstructured, u

    Dec 6, 2010

  • AUSIMM
    Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,

    By Met B. E

    During the operation of the Parkes process of desilverising, and in the earlier days of the continuous process, gold and silver were removed separately from softened lead bullion. Gold was removed in

    Jan 1, 1937

  • AUSIMM
    Pit Water Management in a Mine Planning Cycle, Olympic Dam Case Study

    By D Barclay, S Mercer, S Wright

    Mine water management is often an afterthought in mine planning processes and can introduce significant risks to projects when studied as a stand alone component at a later stage in the mine design. I

    Jan 1, 2009

  • CIM
    Tonnage Oxygen Use in Gold Leaching

    "Air Products approached LAC Minerals in 1987 to initiate trials with pure oxygen in the leach circuit at several LAC facilities in Canada. This paper gives an overview of oxygen use and covers specif

    Jan 1, 1990

  • SME
    Innovative Roof Support Systems For The Next Generation Of Mining

    By S. C. Tadolini

    Roof support systems have evolved from standing posts and timbers to a generation termed ?big nails? where steel bars are inserted into boreholes and anchored with expansion shells and/or resin cartri

    Jan 1, 2012

  • CIM
    Economics and Challanges for the Development of Mining and Metallurgy Sector in the Bor Basin of Copper in Serbian Part of Danube Region

    By S. Zekovic

    "The paper gives an overview of the economics condition and strategic business challanges of the mining&metallurgy sector and their possible impact on the future development of the Bor basin of copper

    Jan 1, 2012

  • ABM
    Avaliação Da Resistencia A Corrosão De Dois Aços Alto Manganês E O Aço 9% Níquel Em Solução De H2so4

    By Mauro Andrés Cerra Flórez

    O presente estudo visa avaliar a resistência à corrosão de dois aços alto manganês com relação ao aço 9% Níquel em solução eletrólito 0,001M de H2SO4. Para esta pesquisa foram utilizados dois aços com

    Oct 30, 2017

  • CIM
    Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation

    By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe

    "Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan

    Jan 1, 2011

  • DFI
    Ground Support for Shafts and Underground Construction Using Artificial Ground Freezing – Sophia Spoortunnel Rotterdam (Nl) – Cern Geneva (CH) – Leipzig (DE) – Berlin (DE)

    By Helmut Hass, Marco Ziller

    "Abstract: 1 Sophia Spoortunnel Marco Ziller, Trevi S.p.A.:For the construction of 14 cross passages connecting the twin tunnels of the Sophiaspoortunnel the Artificial Ground Freezing technique was a

    Jan 1, 2014

  • AUSIMM
    A comparison of X-ray and electron-based analysis techniques for characterising the mineralogy and alumina distribution in iron ores

    By M I. Pownceby, C M. MacRae, A Torpy

    Electron probe microanalysis (EPMA) and quantitative X-ray diffraction (QXRD) techniques are capable of providing high-quality quantitative information regarding the phase mineralogy and distribution

    Jul 24, 2017