A New and Reliable Technique for Safely Removing Underground Rock Hang-upsBy Brian Micke, Mick Gavrilovic
The problem of rock hang-ups in underground mining operations has been a continuing one since the days of the “hang-up man”. This position commanded the highest pay of any underground worker in many h
Jan 1, 1999
-
Innovations in Reagent Technology: New Collectors and Modifiers for Difficult to Treat OresBy T. Bhambhani, D. R. Nagaraj
"Ultramafic Ni ores present significant challenges in processing in that both recoveries and grades are not satisfactory, due to the presence of Mg silicates in large amounts. Significant quantities o
Jan 1, 2012
-
Evolution of Direct Coupled Pinion Drive Technology for Grinding MillsBy K. Lim, J. Sobil, L. Galarza Castillo, F. Tozlu
"For mining operations globally, the scale and criticality of the grinding mill drive has meant that selection of the correct mill drive technology is paramount. With so much depending on the successf
Jan 1, 2016
-
Offshore Wind Turbine Foundations - In Denmark And Belgium - IntroductionBy Jørn H. Thomsen
This paper presents the experience gained and the lessons learned over the last decade within the numerous offshore foundation projects undertaken in the offshore waters of Denmark and Belgium by COWI
Jan 1, 2013
-
Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - SummaryBy William D. Spielvogel
The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t
Jan 1, 1994
-
Fluid Flow And Transport Phenomena During Steel Refining And Casting ProcessBy Lifeng Zhang
The transport of fluid, heat ,and particles (bubbles and solid inclusions) in flowing molten steel is investigated in steel refining ladles, the continuous casting tundish, continuous casting mold and
Jan 1, 2006
-
Effect of mine water on the stability of underground coal mine roadwaysBy H. Takamoto, M. Ichinose
"The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many roa
Jan 1, 2011
-
Resolution Of Prestressed Concrete Pile Splice Problems - SummaryBy David Siu
Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea
Jan 1, 1991
-
Start-Up and Early Optimization of the New Afton ConcentratorBy C. O’Hara, S. Roy, K. Swedburg, J. Katchen
"New Gold Inc.’s New Afton concentrator commenced operation in June 2012, producing a copper-gold-silver concentrate. During the first two years of operation, various optimization efforts have improve
Jan 1, 2015
-
Blastcad 3D - Three Dimensional Underground Blast Design SoftwareBy Patrice Favreau
In 1990 the Noranda Technology Centre commenced a project to develop an interactive three-dimensional blast design system using a commerical computer-aided drafting and design package (CADD). The obje
Jan 1, 1992
-
Case History: Foundations For The New Mississippi River Bridge, St. LouisBy Paul J. Axtell
This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c
Jan 1, 2011
-
Division Lectures - The Thirty-eighth Henry Marion Howe Memorial Lecture - Role of Chemistry in Metallurgical ResearchBy Lawrence S. Darken
STAFF: Editor, Gerhord Derge Cornegie Institute of Technology Schenley Pork Pittsburgh 13, Pa. Editorial Assistant, M. A. Redmerski Production Editor, Otto T. Johnson THE METALLURGIC
Jan 1, 1962
-
Toward the 24 hour large SAG Mill RelineBy John Russell
"Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for
Jan 1, 2008
-
Modified Case Charge for Avalanche ControlBy Eduardo Lozano, Vilem Petr
This paper provides an overview of a new method for avalanche control using a high explosive charge placed at the avalanche runout zone: the case charge technique. This new avalanche control technique
Jan 1, 2018
-
Effect of Oil Sand Mining Operations on Haul Truck Dump Body DesignBy David Whalen
Mobile equipment in oil sand mining operations experience more maintenance problems than similar equipment in other surface mines, due to soft underfoot conditions. Oil sand properties are known to va
May 1, 2003
-
Ground Control Design For Highwall Mining (237c3f7a-5149-4dad-a860-b8b9ad20fedb)By R. Karl Zipf
Highwall mining is an important surface coal mining method, and it may account for approximately 4% of total U.S. coal production. Highwall stability is the major ground control related safety concer
Jan 1, 2005
-
Recent Developments in North America in the Design of Precast Concrete Tunnel Linings ? IntroductionBy Brian Garrod
Increasing use of pressurized-face tunnel boring machines in North America has produced a similar increase in the application of precast concrete tunnel linings. Where a pressurized TBM is needed, imm
Jan 1, 2008
-
An Elementary Statistical Examination of Some Mine Sampling ProblemsAt an early stage of the examination of most prospects, samples are taken; and the sample values obtained play an important part in determining the subsequent history of the prospect. It is, therefore
Jan 1, 1950
-
Thinking Outside The Box- New Ways To Close Old Tailing BasinsBy B. Anderson, P. Churak, S. Dewar, A. Johnson, P. Eger
Although vegetation can be successfully established on fine taconite tailings, innovative approaches are needed to reclaim the coarse tailings used for dam construction. Through a series of cooperati
Jan 1, 2002
-
Diseño e innovaciones al método de explotación sub level caving en función al elipsoide de extracción Perubar S.A. Unidad RosauraBy Víctor De la Cruz
Dado que la mina Rosaura (Lima) se dedica a la explotación de minerales polimetálicos como el zinc, plomo, cobre y plata, la caracterización geomecánica de su estructura, morfología y reservas demostr
Sep 9, 2007